PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 13 OCTOBER 2015
Water Quality and Quantity
40. Except as otherwise modified herein, the development must be designed,
constructed and maintained to achieve the stormwater quality and quantity
outcomes detailed in the Stormwater Management Plan for 30-32 Doonella
Street, Tewantin Rev A by AquaIntel Pty Ltd dated 12 August 2015 (Doc No
2014027 RPT 001).
41. The development must include measures to prevent oils, hydrocarbons or other
pollutants likely to be released in basement areas from being released into
Council’s Stormwater system or other receiving waters.
42. Water quality treatment devices must be shaped and designed to be low
maintenance, and integrate into the landscape. Where bioretention devices are
proposed, the Operational Works Application for Stormwater Drainage,
Landscaping and Earthworks must demonstrate how the design is consistent
with the most current version of the Water by Design Bioretention Technical
Design Guidelines.
43. Water Quality Treatment devices must be operated and maintained in
accordance with manufacturer’s specifications and relevant maintenance
manuals.
44. Prior to commencement of use the Community Management Statement must
include provision for the engagement of personnel to operate and maintain
Water Quality Treatment devices in accordance with manufacturer’s
specifications, relevant maintenance manuals and the Stormwater Management
Plan for 30-32 Doonella Street, Tewantin Rev A by AquaIntel Pty Ltd dated 12
August 2015 (Doc No 2014027 RPT 001).
Water Reuse
45. Detail design plans submitted with the Operational Works Application must
demonstrate how waters will be reticulated from the rainwater storage tank to
reuse areas with a minimum water use of 342KL per annum.
46. A suitable backflow prevention device must be installed on water reuse facilities
to protect the potable water within the reticulated water supply in accordance
with AS/NZS 3500:2003 Plumbing and Drainage.
WASTE MANAGEMENT
Waste Storage
47. The development must provide waste storage and disposal facilities in
accordance with Planning Scheme Policy 9, Waste Management, including an
external imperviously paved area correctly sized for all refuse and recycling
containers and suitably screened from public places and neighbouring
properties.
The waste management facilities should ensure recyclables bins are
appropriately sited and accessible, and/or provided with their own waste shute,
to ensure recyclable waste is not placed in the general waste shute.
48. The site must be provided with a bin wash area with a cold-water tap, hose and
drain outlet connected to sewer, via a bucket trap. The drain outlet is to be
designed to prevent storm water entry to the sewerage system which can be
achieved by a bunded area, with a nib wall height of 100mm maximum,
enclosing a wash area of 700mm x 700mm minimum (max 0.7m²). Alternatively
the waste area can be roofed, or any other appropriate design approved by
Council.
Page 64 of 110
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.