PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 13 OCTOBER 2015
36. All works must be kept clear of any existing or proposed easements on the
subject land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
37. All earthworks, associated batters and retaining walls must be undertaken in
accordance with an Operational Works approval, and must in particular:
a. Be undertaken in compliance with the provisions of Australian Standard
AS3798: Guidelines on Earthworks for Commercial and Residential
Developments.
b. Be carried out in accordance with a site-specific Geotechnical Investigation
Report prepared by a suitably qualified person* that addresses, in
particular:
i. the impact of excavation and the construction works on the stability
of nearby building and infrastructures
ii. Acid Sulfate Soil assessment report in accordance with State
Planning Policy 2/02 Planning and Managing Development Involving
Acid Sulfate Soils and supported by appropriate testing and
documentation.
c. Have all access chamber surface levels for drainage, water supply or
sewerage infrastructure within the work site be adjusted to provide a
freeboard of 100mm above the finished ground surface level or be in
accordance with the requirements and directions of the service provider.
d. All fill and associated batters must be contained entirely within the subject
site unless written permission from the respective landowner(s) is provided
to Council.
(*) refer to Advisory Notes
Acid Sulfate Soils
38. Where excavations of non-imported soils below the elevation of 5m AHD are
necessary for construction, the application for Operational Works for Bulk
Earthworks, Stormwater and /or Landscaping must demonstrate and include
certification from a suitably experienced and qualified geotechnical engineer of
methods necessary to ensure construction and operation of the development:
a. Shall be consistent with Queensland Acid Sulfate Soil Technical Manual:
Soil Management Guidelines; and
b. will not result in the release of acid or associated metals; and
c. will not cause localised lowering of groundwater.
Erosion and Sediment Control
39. Prior to the completion of the development, all site surfaces must be effectively
stabilised. For the purpose of this condition, an effectively stabilised surface is
defined as one that does not, or is not likely to result in visible evidence of soil
loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to
water contamination.
Page 63 of 110
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.