Original source · versioned page text
2015-10-13 Planning & Organisation Committee Agenda
The original of this document is very large (10.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 13 OCTOBER 2015
Project methodology
A series of ‘settlement structures’ were placed in key locations around the Noosa Estuary to
investigate oyster settlement rates over time.
The structures consisted of a series of tiles or plates (10cm x 10cm) made from concrete
sheeting which is a medium that mimics the surface on which oysters were known to settle
on in the Noosa Estuary, for example concrete bridge pylons.
These were then deployed at various sites in the Noosa Estuary and anchored at different
orientations (e.g. vertical and horizontal) and depths (intertidal and sub-tidal) – see Figures 1
and 2 below.
Figure 1 Location of sites in the Noosa Estuary where the settlement structures were deployed
(Source: An Assessment of Oyster Recruitment Report, 2015).
Page 96 of 110
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.