2009 KHA Original Response to IR · REC14/0015
Attached to the e-mail REC14/0015 Report, Previous IR response, Plans and owner's consent Email 2 of 3.
2. Provide a traffic report prepared by a suitably qualified traffic consultant, addressing the following: 2.1 Justification for having four (4) lots serviced by the access easement contrary to The Noosa Plan and Planning Scheme Policy —5 requirement that "up to 2 fots" be serviced by an access easement. 2.2 Justification for why access to Lot 49 is not to be provided from Eumundi Noosa Road via an access easement over Lot 48. 2.3 Address the potential of adverse impact of the increased number of lots using easement on the amenity and the noise level affecting properties adjoining the access easement, taking into consideration the grade and the geometry of the proposed access driveway. 2.4 A plan to demonstrate a safe maneuvering of delivery vehicles (HRV) within the access easement without any undue obstruction to the traffic on the easement. 2.5 Show that safe and acceptable sight distances are provided at the rear right- angle bend of the access easement. 2.6 Demonstrate that adequate and safe access can be maintained when having 8 garbage bins lined up on the frontage of the 8 metres wide easement on Starboard Avenue. Response: A Traffic response addressing items 2.1, 2.2, 2.4 — 2.6 has been prepared by Hayes Traffic Engineering — refer correspondence included as Attachment 2, This correspondence confirms that the proposal is acceptable from a traffic engineering perspective. With respect to items 2.3 it is our opinion that the Proposal will not result in any adverse amenity impacts given the low traffic movements and low speed environment identified in the traffic response. A noise assessment has not been prepared and is not considered necessary in this instance. Drainage and Services 3. Provide drainage design plans showing the proposed stormwater disposal strategy for .... .. ‘the proposed driveway and allotments (including the upstream Lots 1 & 2 as approved on Dwg 02170-L). The drainage design should inciude Provision of unobstructed overland secondary flow path/s for storms up and including 1 in 100 years ARI storm events. The plans should also show existing council stormwater structures/pits to be utilised for the stormwater connection and demonstrate that no adverse impact caused to other properties or to existing infrastructures by the Proposal. Response: A preliminary stormwater drainage design has been prepared by Tod Consulting - refer plan 090595 P2 included in Attachment 1, Inter altotment drainage will be provided for each lot and connected to a piped drain along the driveway to the street. This drain will be connected to the future stormwater system in the extension of Starboard Ave and ultimately to existing pipes in Sailfish Ct. (Refer to DA 2004/240011). Overland flow from lots 1, 2 & 48 ~ 51 will be controlled by the kerb on the driveway and directed to the street. 4. Submit professionally prepared plans showing the proposed sewer reticulation layout for the site including pipe sizes and longitudinal section. The plans shall include sewer reticulation inside and outside the property to connect to the existing Council's sewer system. Response: A preliminary sewer reticulation layout has been prepared by Tod Consulting - refer plan 090595 P4 included in Attachment 1. It is noted that the sewer downstream of MH NV22/03/12 will be diverted as
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2009 KHA Original Response to IR.pdfRelated documentApplication case desk ↗
About this file
- File size
- 589 KB (small file)
- File type
No other editions are linked here.