Council archive · source document
2009 KHA Original Response to IR · REC14/0015
Attached to the e-mail REC14/0015 Report, Previous IR response, Plans and owner's consent Email 2 of 3.
part of the development of the adjacent site (Refer to DA 2004/240011). 5. Submit professionally prepared plans showing the proposed water reticulation layout for the site. Response: A preliminary water reticulation layout has been prepared by Tod Consulting - refer plan 090595 PS included in Attachment 1. Amended Layout Plan 6. Provide an amended plan of the development showing: 6.1 Sewer easement over the zone of influence of all existing and proposed sewers within the subject site and over those parts of the subject site that are impacted upon by sewers on any adjoining sites. The easements shall generally be parallel to and centred over the sewer main and be equivalent in width to twice the depth to invert level of the sewer at the, deepest point within the allotment (measured from the finished surface) and be no less than 3.0m wide overall. In this regard a licensed surveyor should accurately iocate all sewer mains and determine the necessary width of the easement. 6.2 1.5m (minimum width) drainage easement over all inter-allotment drainage pipelines. 6.3 Service easements over any other council or public utilities as required by the relevant standards. Response: An amended subdivision proposal plan has been prepared by KHA Development Managers — refer plan 070213T/PS1 A included as Attachment 3. This plan shows the proposed sewer and drainage easements as detailed on the design plans prepared by Tod Consulting - refer plans 090595 P2 - PS included in Attachment 1, It is noted that the sewer mains shown on the Tod Consulting Plans have been surveyed by Kimmorley Surveying - refer plan included as Attachment 4. 7 OO The Information and Referral Stage of IDAS has now concluded and the application is now in the Decision Stage. Should you have any questions with respect to the above, please do not hesitate to contact me direct. Yours faithfully KHA DEVELOPMENT MANAGERS a Scott Sobey DIRECTOR
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2009 KHA Original Response to IR.pdfRelated documentApplication case desk ↗
About this file
- File size
- 589 KB (small file)
- File type
No other editions are linked here.