SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 7 DECEMBER 2021
7 CONTRACT NO. T000051 SUNSHINE BEACH SKATE PARK HALF PIPE RENEWAL –
TENDER AWARD
Author Project Officer, James Santifort
Infrastructure Services Department
Index ECM/ Project & Contract / T000051 Sunshine Beach Skatepark Halfpipe
Renewal – Tender Award / Council Reports
ECM/ Subject / Contract / Parks and Reserves
ECM / Projects (T1) / Sunshine Beach Skatepark Renewal – CAP>Work -
500522
Attachments 1. Evaluation Spreadsheet
EXECUTIVE SUMMARY
The half pipe structure at Sunshine Beach Skate Park has reached its design life and requires
replacement.
After community consultation, the new vert ramp was requested to be larger than the existing
structure and the ramp surface to be upgraded with modern materials consistent with
international competition standard.
This report provides a tender evaluation summary and recommendation for the tender award
for the design and construction of a new halfpipe structure at Sunshine Beach Skate Park.
In accordance with Council procurement policy and procedure, an Invitation to Tender (ITT)
was initiated and attracted three (3) responses with all considered compliant for further
assessment.
The tender evaluation panel completed the evaluation process and considered Revolution
Action Sports Concepts Pty Ltd to be the most advantageous to Council, representing the best
value for money.
RECOMMENDATION
That Council note the report by the Project Officer to the Services & Organisation Committee Meeting
dated 7 December 2021 and award Contract No. T000051 for design and construction of the new
halfpipe structure at Sunshine Beach Skate Park to Revolution Action Sports Concepts Pty Ltd for
the lump sum price of $283,271 (excl. GST).
REPORT
1. Background
The existing half pipe structure at Sunshine Beach Skate Park measures 3m (10ft) high and 7.2m
wide. When the skatepark was upgraded in 2016, the half pipe remained at the request of the local
skating community as it is one of a kind in the region. However, the structure has seen out its design
life and maintenance requirements rapidly increasing to keep the ramp safe for public use.
With the condition of the existing structure, the inclusion of skateboarding in the Olympics and the
awarding of the 2032 Olympic Games to Brisbane, it is the perfect time for Council to replace the
current structure.
After community consultation with the newly formed Noosa Skating Association, there were two key
design elements that have been included in the specification for the new ramp. The new ramp will
be 3.7m (12ft) tall and at least 8m wide allowing users to further their vert skating skills. The new
ramp will also employ a modern skate surface consistent to those used in world class competitions
such as X-games and Dew Tour.
Page 19 of 54
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.