Original source · versioned page text
Decision Notice - OPW22 0251 [As Published]
Attachment 1—Referral agency conditions 2211-31930 SRA (Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development approval relating to this application) (Copies of the documents referenced below are found at Attachment 5) No. | Conditions Condition timing Development Permit — Operational work 10.17.3.1.1 — Tidal works or work in a coast management district—The chief executive administering the Planning Act 2016 nominates the Director-General of Department of Transport and Main Roads to be the enforcement authority for the development to which this development approval relates for the administration and enforcement of any matter relating to the following conditions: 1. The revetment wall reconstruction and stabilisation of eroded backfill | For duration of works and foreshore terrace subgrade soils must be carried out generally in accordance with the following plans: (a) Site and general arrangement plan prepared by Long View Consulting Engineers, dated May 2022, drawing number S010 and revision P2 (as amended in red by SARA on 17 July 2023) (b) General arrangement plan and details prepared by Long View Consulting Engineers, dated Jan 2023, drawing number S020 and revision P3 (c) Section and details prepared by Long View Consulting Engineers, dated May 2022, drawing number S030 and revision P2. 2. Maintain the development in accordance with the plans referenced in | At all times Condition 1, and the requirements of any conditions included in this referral agency response. 3. For the revetment wall reconstruction and stabilisation of eroded For the duration of the backfill and foreshore terrace subgrade soils works, only use clean works materials which are free from prescribed water contaminants. 4. Development must prevent the release of sediment to tidal waters. For the duration of the works 5. Submit “As Constructed drawings” to [email protected] or mail | Within 20 business to: days of the completion Department of Environment and Science of the works Permit and License Management GPO Box 2454 Brisbane Qid 4001 6. (a) In the event that the works cause disturbance or oxidisation of (a) Upon disturbance acid sulfate soil, the affected soil must be treated and thereafter or oxidisation until managed (until the affected soil has been neutralised or contained) the affect soil has in accordance with the current Queensland Acid Sulfate Soil been neutralised or Technical Manual: Soil management guidelines, prepared by the contained Department of Science, Information Technology, Innovation and the Arts, 2014. (b) Submit certification from an appropriately qualified person on acid | (b) At the time the sulfate soil, confirming that the affected soil has been neutralised or soils have been contained in accordance with (a) above to [email protected] neutralised or or mail to: contained Department of Environment and Science State Assessment and Referral Agency Page 4 of 9 Page 10 of 38 Document Set ID: 22549959 Version: 4, Version Date: 23/08/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.