Decision Notice - OPW22 0251 [As Published]

of 38

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Attachment 1—Referral agency conditions

2211-31930 SRA

 

(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the documents referenced below are found at Attachment 5)

 

No. | Conditions

Condition timing

 

Development Permit — Operational work

 

10.17.3.1.1 — Tidal works or work in a coast management district—The chief executive administering
the Planning Act 2016 nominates the Director-General of Department of Transport and Main Roads to
be the enforcement authority for the development to which this development approval relates for the
administration and enforcement of any matter relating to the following conditions:

 

 

 

 

 

 

 

 

 

 

 

1. The revetment wall reconstruction and stabilisation of eroded backfill | For duration of works
and foreshore terrace subgrade soils must be carried out generally in
accordance with the following plans:
(a) Site and general arrangement plan prepared by Long View
Consulting Engineers, dated May 2022, drawing number S010 and
revision P2 (as amended in red by SARA on 17 July 2023)
(b) General arrangement plan and details prepared by Long View
Consulting Engineers, dated Jan 2023, drawing number S020 and
revision P3
(c) Section and details prepared by Long View Consulting Engineers,
dated May 2022, drawing number S030 and revision P2.
2. Maintain the development in accordance with the plans referenced in | At all times
Condition 1, and the requirements of any conditions included in this
referral agency response.
3. For the revetment wall reconstruction and stabilisation of eroded For the duration of the
backfill and foreshore terrace subgrade soils works, only use clean works
materials which are free from prescribed water contaminants.
4. Development must prevent the release of sediment to tidal waters. For the duration of the
works
5. Submit “As Constructed drawings” to [email protected] or mail | Within 20 business
to: days of the completion
Department of Environment and Science of the works
Permit and License Management
GPO Box 2454
Brisbane Qid 4001
6. (a) In the event that the works cause disturbance or oxidisation of (a) Upon disturbance
acid sulfate soil, the affected soil must be treated and thereafter or oxidisation until
managed (until the affected soil has been neutralised or contained) the affect soil has
in accordance with the current Queensland Acid Sulfate Soil been neutralised or
Technical Manual: Soil management guidelines, prepared by the contained
Department of Science, Information Technology, Innovation and the
Arts, 2014.
(b) Submit certification from an appropriately qualified person on acid | (b) At the time the
sulfate soil, confirming that the affected soil has been neutralised or soils have been
contained in accordance with (a) above to [email protected] neutralised or
or mail to: contained
Department of Environment and Science
State Assessment and Referral Agency Page 4 of 9
Page 10 of 38

Document Set ID: 22549959
Version: 4, Version Date: 23/08/2023
Log in to download the original file

Decision Notice - OPW22 0251 [As Published].pdf · 5.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.