Original source · versioned page text
Decision Notice - OPW22 0251 [As Published]
2211-31930 SRA Permit and License Management GPO Box 2454 Brisbane Qid 4001 Note: Appropriately qualified person(s) means a person or persons who has professional qualifications, training, skills and experience relevant to soil chemistry or acid sulfate soil management and can give authontative assessment, advice and analysis in relation to acid sulfate soil management using the relevant protocols, standards, methods or literature. Remove and dispose of the existing access ramp at an appropriately licenced facility that accepts such waste. Within three months of commencement of the demolition admini 10.6.3.3.1.1 — Operational work involving marine plants— The chief executive Planning Act 2016 nominates the Director-General of Department of Agriculture and Fisheries to be the enforcement authority for the development to which this development approval relates for the istration and enforcement of any matter relating to the following conditions: administering the 8. Development is limited to permanently remove, damage, destroy marine plants within 22.5m? as shown in Table 1: Permanent impacts to marine plants and Figure 2: Proposed marine plant impacts at Catalina Jetty of the report titled Marine Plant Assessment — Catalina Jetty, Gympie Terrace, Noosaville Retaining Wall Upgrade prepared by Native Foresters, dated 27" April 2023 and document no 230427 (as amended in red by SARA on 17 July 2023). At all times Development is limited to temporarily remove, damage, destroy marine plants within 209.15 m? as shown in Table 2: Temporary impacts to marine plants and Figure 2: Proposed marine plant impacts at Catalina Jetty of the report titled Marine Plant Assessment — Catalina Jetty, Gympie Terrace, Noosaville Retaining Wall Upgrade prepared by Native Foresters, dated 27" April 2023 and document no 230427 (as amended in red by SARA on 17 July 2023). At all times 10. The revetment reconstruction and sediment stabilisation must be camied out generally in accordance with the following plans: (a) General Arrangement Plan and Details prepared by Long View Consulting Engineers, dated Jan 2023, drawing number S020 and revision P3 (b) Sections and Details prepared by Long View Consulting Engineers, dated May 2023, drawing number S030 and revision P2. At all times 11. Maintain the development in accordance with the plans referenced in condition 10, and the requirements of any conditions included in this referral agency response. At all times 12. Submit written notice to the Department of Agriculture and Fisheries at [email protected] advising when the development authorised under this referral agency response: (a) will start (b) when it has been completed. Any notice must state the application's reference number: 2211- 31930 SRA. (a) At least 5 business days but no greater than 20 business days prior to the commencement of the works (b) Within 15 business days of the completion of the fisheries development works 13. Spoil is not disposed of on tidal lands or within waterways and is At all times State Assessment and Referral Agency Document Set ID: 22549959 Version: 4, Version Date: 23/08/2023 Page 5 0f0 Page 11 of 38
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.