Original source · versioned page text
Decision Notice - OPW22 0251 [As Published]
Document Set ID: 22549959 Version: 4, Version Date: 23/08/2023 2211-31930 SRA managed to prevent acid soil development. 14. Restore the marine plants that are temporarily removed, damaged or | Within 5 years of destroyed by this development. removal, damage or destruction of marine plants 15. Dispose of all material associated with the development (e.g., debris, | As soon as reasonably construction material, soil, etc.) from the intertidal zone at an practicable appropriate licensed facility. 16. Restore tidal land profiles that are temporarily disturbed by the Within 10 business development works to pre-work profiles. days of completion of the works and prior to post works notification 17. Works within a waterway must be avoided during times of: For the duration of the works (a) elevated flows (b) large tidal events that encroach on the temporary works area shown in Figure 2: Proposed marine plant impacts at Catalina Jetty of the report titled Marine Plant Assessment — Catalina Jetty, Gympie Terrace, Noosaville Retaining Wall Upgrade prepared by Native Foresters, dated 27" April 2023 and document no 230427 (as amended in red by SARA on 17 July 2023). 18. | This fisheries development (as defined by the Fishenes Act 1994) At all times constitutes a place that is required to be open for inspection by an inspector, pursuant to section 145 of the Fisheries Act 1994. State Assessment and Referral Agency Page 6 of O Page 12 of 38
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.