MAX WATTERSON+ASSOCIATES

CONSULTING SURVEYORS & PLANNERS

 

5" June, 2014
Ref: 10-3032
Your Ref: REC13/0146

The Chief Executive Officer
Noosa Shire Council

PO Box 141

TEWANTIN QLD 4565

Attention: Glen Conforti
Dear Sir,

Re: Development Application for Reconfiguration of a Lot — 3 Lots into 18 Lots
Lots 135 & 136 on MCH978 and Lot 2 on RP173883
Lot 135 Pearsons Road and 55 Lake Macdonald Drive, Cooroy

Applicant: Valkev Pty Ltd

| refer to the above-mentioned matter and your letter of Information Request dated
29"" November, 2013 and | respectfully supply the following information:

Preliminary Information

The above mentioned Information Response relates to the Proposed Development
of REC13/0146 which is known as Stage 3 of Erindale. Please refer to the Erindale
Park Staging Plan (Ref: 3032AP4) for the Proposed Development of other stages.

1&2. Active Parkland

It is noted that the provision of parkland within the subject property is not included
within the Priority Infrastructure Plan. However it is our intention that active parkland
will be voluntarily provided within this area as an offset against the required parkland
headwork contributions for this development and the adjoining development to the
west (REC 13/0148).

The areas that will be dedicated towards parkland are shown in the amended
Proposal Plan (Ref: 3032AP5) and includes:
¢ 700m* of active parkland & 2.017ha of passive parkland located to the north
of Lot 32 that will be dedicated in Stage 3, and
¢ 8671m’ of passive parkland to be located in the area between the road
extension of Blue Wren Place and the western gully and is to be dedicated in

Stage 4.
PRINCIPAL 12 Maple Street (PO Box 639) Cooroy Q 4563 ABN 59 847 644 252
Max L. Watterson PH 07 5442 6121
Cadastral Surveyor (Qld) FAX-07 5442 5125

B.Surv(UNSW). M.S.S.S.1 EMAIL [email protected]
Log in to download the original file

Information Response REC13 0146.pdf · 1.5 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 2 pages

Page 2

Some minor filling may be required to for the Active Parkland to be located above the
Q100 level. The Active and Passive Parkland in this development has been located
to form part of a larger park corridor that exists within the adjoining residential areas
(Ref: 3032AP8).

Please find attached an indicative Plan of the Potential Parkland Development
prepared by Play Environment Consulting Pty Ltd (Ref: 14005 S01 Erindale
Parklands Concept Plan). An accompanying report has also prepared by Play
Environment Consulting Pty Ltd (Ref: Erindale Parklands Report) and shows some
of the potential features and designs that can be incorporated into the site.

3. Pathway system

Please find an amended proposal plan (Ref: 3032AP5) that shows the proposed
route of the pathway from the active parkland to the northern portion of the subject
property via a walkway over the eastern gully. The connectivity of the site is also
improved with a second pathway connecting the head of the cul-de-sac near Lots 24
& 25 to the frontage of Lake Macdonald Drive.

The pathways are located in areas that are expected to have high areas of
pedestrian activity and are designed to be integrated with the existing pathway
system shown in the Priority Infrastructure Plan. The pathways will be designed in
accordance with Sections 2 and 3 of PSP5.

4. Stormwater Drainage

A response to this issue has been prepared by Callaghan & Toth (Ref: Callaghan &
Toth: Response to Information Request, Date 24/4/14); please find enclosed a copy
of the response.

5 & 6. Roadworks

A response to this issue has been prepared by Callaghan & Toth (Ref: Callaghan &
Toth: Response to Information Request, Date 24/4/14); please find enclosed a copy
of the response.

7 & 8. Hydraulics and Water Quality

A Flood Study of the proposed development has been prepared by Brisbane
Stormwater Management Pty Ltd (Ref: Flood Study BSM, Date 30/4/14): please find

enclosed a copy of the response.

An amended Proposal Plan has been provided by Max Watterson & Associates (Ref:
3032AP5) in response to the findings of the Flood Study.

Page 3

9. Stormwater Quality
A response to this issue has been prepared by Callaghan & Toth (Ref: Callaghan &

Toth: Response to Information Request, Date 24/4/14); please find enclosed a copy
of the response.

10 & 11. Ecology
A response to this issue has been prepared by Callaghan & Toth (Ref: Callaghan &

Toth: Response to Information Request, Date 24/4/14); please find enclosed a copy
of the response.

12. Land Dedication

Please refer to the Plan prepared by Callaghan & Toth (Ref: 1225-33) showing the
areas that will be revegetated and restored.

The land that is to be dedicated to the Crown as a reserve is shown as Park on the
amended Plan of Proposal (Ref: 3032AP5).

Please note that this submission completes our response to your Information
Request.

| thank you for your consideration in this matter.

Yours faithfully

vo tg

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.