      Site Stability
      52.    A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
             determine the soil classification, establish whether any measures are required to protect the
             stability of adjoining buildings and/or structures and/or land, and make recommendations on the
             type of foundation system(s) best suited for the proposed development. The recommendations of
             this report shall be incorporated into the design and construction of the proposed development.
      Erosion and Sediment Control
      53.    Any person acting on this permit shall prevent erosion and sediment export from leaving the site.
             Site control measures such as silt fencing, controlled gravel access to the site and controlled
             disposal of waste, will be necessary.
             In this regard plans detailing the methods of controlling erosion and sediment are required to be
             submitted to the Council for approval prior to obtaining a Development Permit for Operational
             Works.

      Contributions Towards Council Infrastructure
      54.    Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or
             upgrading various infrastructure at the rates applicable at the time of payment. An estimate only of
             the contribution amounts under the current Council policies and requirements is outlined in the
             table below:

                Contribution Required For:                                                            Amount:

                PSP12 – Public Open Space Contributions (Park)                                        $16,444
                PSP16 – Sewerage Headworks Contributions                                              $56,832
                PSP17 – Water Supply Headworks Contributions                                          $37,400
                PSP20 – Pathway Trunk Network Contributions                                           $3,696

                TOTAL Contribution Amount =                                                           $124,876

                Please note, that these amounts are all subject to variations in the Consumer Price Index, All Groups Brisbane
                from March 2007 until the date of payment.
             All contributions must be paid prior to the issue of a Development Permit for Operational Works.
             Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
             contributions not be paid at the due time, Council shall call upon the trading bank guarantee in full.
             Processing of bonds for security where specific Council approval has been given for the bonding of
             contributions will incur an administration fee in accordance with Council’s Land Development
             Commercial & Regulatory Fees at the time of lodgement.
             In the event that the Development Permit for Material Change of Use of Premises lapses or is
             cancelled, the trading bank guarantee will be returned.

      General
      55.    A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
             specifications for all engineering works that will become Council infrastructure, which shall be
             submitted in conjunction with an application for a Development Permit for Operational Works. In
             this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be
             submitted in conjunction with any application for Operational Works.

      56.    To facilitate production of As Constructed drawings it is suggested that all design drawings are
             submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of
             ADAC are available at www.adac.com.au).

      57.    Any damage caused to any public utility during the course of construction shall be repaired to
             Council’s standards and at no cost to Council.

      58.    Any alteration of any public utility or other facilities necessitated by the development of the land or
             associated construction works external to the site shall be at no cost to Council.

      59.    The transportation of all materials to and from the site shall be undertaken in a manner such that
             no particle matter escapes onto a public road. All vehicles carrying materials either to or from the
             site shall be covered to prevent materials including dust being windblown from the vehicle.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@b808a965\@[email protected]

Used in these records

About this file

File size
65 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_2552 NEGOTIATED Decision Notice [As Published].pdf · 65 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.