RFI - 25_06_23_AIA_ SLa_3 Allambi Rise_V2
6 P ROJECT P LANS
Figure 6: Site & Locality Plan – Existing
Figure 7: Site & Locality Plan – Demolition
Note 1: The driveway section in front of tree 2 is to be retained to act as ground protection during
the construction phase. Trees 2, 7 - 12, 17, 23, 24, & 25 are proposed to be retained and
protected.
Note 2: Version Two (2) of this report, Tree 1 adjacent to the driveway is now shown for removal.