Original source · versioned page text
RFI - 25_06_23_AIA_ SLa_3 Allambi Rise_V2
D OCUMENT C ONTROL
The latest approved version of this 25_06_23_AIA_ SLa_3 Allambi Rise_V2 should be available to all
personnel involved in the Project in consultation with Consult Arborist Pty Ltd.
Each new revision should be distributed to all key personnel for review and endorsement.
Version Date Written Reviewed Approved
One (1) 31/03/2025 MJD SCD MJD
Two (2) 23/06/2025 MJD SCD MJD
D OCUMENTS R EVIEWED
The following documents have been reviewed, analysed, and referenced during the production of this
report.
Reference / Date Title / Details
25/03/2025 250325 - 3 Allambi Rise - Consultant Coordination: shaun lockyer architects
17/10/2024 24_10_17_ASR_SLA_3 Allambi Rise: Consult Arborist
18/06/2025 Westera Partners - Construction Engineers Plans - S25-054 Revised Concept
Issue 18.06.2025 updated
Note: Extracts from the above document have been used to illustrate the text within this report but should be read with full documents.
25_06_23_AIA_ SLa_3 Allambi Rise_V2 Page 4 of 38
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.