Minor Change Report MCU21 0117 02 (As Published) · MCU21/0117.02
Existing Conditions 34 and 35
Stormwater Drainage
34. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge and be in accordance with the Queensland Urban Drainage Manual (QUDM). The
works must be undertaken in accordance with an Operational Works approval and include in
particular:
a) The works generally as shown on concept plan 23098/SK10 Revision G as prepared
by Morgan Consulting Engineers,
b) Collection and lawful discharge of stormwater to ensure that adjoining properties,
reserves and roads are protected from ponding or actionable nuisance from stormwater
as a result of any works undertaken.
c) the site stormwater system is to accommodate stormwater from Lot 1 RP153798
external to the site, including registration of drainage easements over the site drainage
system in favour of Lot 1 RP153798
d) the use of gravity stormwater drainage and not surcharge pits
35. A stormwater quality treatment system must be provided for the development. The works
must be undertaken in accordance with the Bioretention Technical Design Guidelines (Water
by Design, 2012), and must include in particular stormwater quality treatment devices of a
size and location generally in accordance with those shown in cross sections shown on
concept plan 23098/SK10 Revision G as prepared by Morgan Consulting Engineers.
Applicant’s Request
The applicant submits that Conditions 34 and 35 are required to be amended to support the
updated plans required by Council and extensions of the ground level decks requested by the
applicant over the stormwater swale at the rear of Units 6 & 8.
The applicant has requested existing condition 34 and 35 be amended and replaced with the
following amended condition:
Stormwater Drainage
34. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge and be in accordance with the Queensland Urban Drainage Manual (QUDM). The
works must be undertaken in accordance with an Operational Works approval and include in
particular:
a) The works generally in accordance with the approved engineering operational works
plans as prepared by Morgan Consulting Engineers.
b) Collection and lawful discharge of stormwater to ensure that adjoining properties,
reserves and roads are protected from ponding or actionable nuisance from stormwater
as a result of any works undertaken.
c) The site stormwater system is to accommodate stormwater from Lot 1 RP153798
external to the site, including registration of drainage easements over the site drainage
system in favour of Lot 1 RP153798.
d) the use of gravity stormwater drainage and not surcharge pits
Page 14 of 29
Document Set ID: 24138568
Version: 7, Version Date: 17/04/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Report MCU21 0117 02 (As Published).pdfRelated documentApplication case desk ↗
Minor Change Report MCU21 0117 02 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.