Council archive · source document
Dewatering Management Plan · OPW24/0032
Plans and drawings: the text below has words only, no drawings.
Original PDF page 20, section 1. The text section number identifies this passage in the reader.
ADG Consulting Pty Ltd
frame to minimise potential impacts. Equipment, spare parts, materials and tools necessary to
manage aspects of the system/s which present a high risk of significant impacts in the event of
failure (if any) shall be readily available.
Construction vibrations could potentially cause settlement in the loose upper level sands, thereby
damaging nearby structures founded in these strata. Prior to commencement of construction on
site (including staged works), it is recommended that a detailed dilapidation survey be undertaken
to establish the condition of all existing adjacent structures, roads and services.
ADG1304.21 Dewatering Management Plan_Rev0_08.10.21 Page 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Dewatering Management Plan.pdfRelated documentApplication case desk ↗
Dewatering Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.