Council archive · source document
08/0831 - Approved Plans [As Published] · 142008.831
Plans and drawings: the text below has words only, no drawings.
\
i
PROPOSED CATCHMENTS
Qi00 FLOW PATH
+ RL,
: ia
HEEaau
600 x 680
FOX BGTENO.
ve
4 RLN.25
660 x 600
. gFOX BPTSOR,
i
=—=,| = =—)
. ie RLW30
5 ‘ “ *
RLY22 . ° a
¢
4
ye.
pu
EXISTING SEWER CONNECTION
TO BE TERMINATED
“
RLNL2S
iit Permit Operational Works No: ...-"
‘Sunshine Coast Regi iat souncil
OEY,
a qs
=
~~
HATCHING INDICATES CONCRETE
PAVEMENT REFER STRUCTURAL
ENGINEERING DRAWINGS
BM003087/G-01-A TO G-06-A
\
BUILDING
11.60
nde} no circu m
within the written) app;
PLANS Al
BUILDING)
are RADON
NOTE:
REFER TO STRUCTURAL ENGINEERS ORAWINGS
FOR BASEMENT DRAINAGE LAYOUT.
600
60¢ FELO
600 x 600 FIELO INLET.
1 t 1
we
BUILDING 3 '
FFL 10.28
450 x 450 FIELO INLET.
[* x 450 FIELD INLET.
+ NEW SEWER CONNECTION
w
!
EXISTING SEWER MANHOLE
50d 80 2
er *
i —-—
LEGEND
Ce]
Ea
4
NEW CONCRETE
EXISTING PAVEMENT
STORMWATER PIPE
GRATEO INLET PIT
DOWELLED CONTROL JOINT
EXISTING ELECTRICITY LINE
EXISTING KERB & CHANNEL
EXISTING SEWERAGE MAIN
EXISTING SEWERAGE MANHOLE
EXISTING STORMWATER LINE
EXISTING TELSTRA LINE
EXISTING PIT
EXISTING WATER MAIN
e
\
\
450 x 450
FEILO INLET.
3
'
/
yf
Ly
/
gy
WARNING
THE LOCATION OF EXISTING TELSTRA,
ELECTRKITY, SEWERAGE & WATER ARE
SHOWN SCHEMATICALLY ON THE DRAWINGS
PRIOR TO AND DURING CONSTRUCTION
OBTAW THE PRECISE LOCATION OF ALL
SERVICES (UNDERGROURD & OVERHEAD?
FROM THE RELEVANT AUTHORITY
RESPONSIBLE FOR THE SERVICE SHOWN.
2
vr EXISTING POWERLINE
\ fH EXISTING SEWER MAIN
‘y
:
K
Re
25g
™
re @
x
ie
CONNECT NEW STORMWATER
DRAINAGE INTO EXISTING GULLY PIT.
MAINTAIN EXISTING STORMWATER
DRAINAGE D/S._
WAT!
CONNECT NEW STORMWATER
DRAINAGE (NTO EXISTING MANHOLE.
MAINTAIN EXISTING STORMWATER
DRAINAGE D/S.
SCHEDULE
EXISTING
| SEALED PAVEMENT fT . PIT No. PIPED Pit TYPE
°
Ss 2 i vane ca | faa
v|. aA Wang ty | FOX.ePreN
Ce Ce -e- ia vane at
Se * CONSTRUCT SORMERCIN, ACCESS WY ACCORDANCE, tee ee eee. .. DAVID LOW WAY. . oe ma
LS. 1. ORG. Co we 6421 | BOS epve
STORMWATER LAYOUT PLAN 0 isi | abe St
1AQ0@A1 me
NOTES: TITLE: PROJECT: pare MARCH 2088 | xue AS SHOWN
FT COWL APENDHENTS pare tH L This és the praperty ef Ibe engiwer, cad ey ot aw BARLOW GREGG MHRA, STORMWATER LAYOUT PLAN | PROPOSED OFFICE OLsKNED aM | sppmoven
Cf COUNCE AMERDMEN sd, copied, w reproduced well CONSIATING ERS
i ooee an AE ae Severs petissan om_ B ABN 77114 957 33 ACH TH 7 3S DEVELOPMENT at DAVID LOW |= CC) Pin Barlow
CC] ADDTIOWAL DETAa ADDED verses | egensat & cay Cy aay reset ia zgeL acten, G demrhreien WAY, .PEREGIAN BEACH Secu arta #4930
B] CARPARK AMENOMENTS Brivis | 1, Fagured Gavensions Icke precedence over scoled. CORAL COAST: ASSOCIATED CONSULTANTS PROJECT -SUBSET-SHEET-REVISION
AL ISSUE FOR OPERATIONAL WORKS APPROVAL Bra7oe| 1 verity eb ‘a sie (aes? CORE ARCHITECTS for MORGAN & BEIERS ATF
. Verity 7
Ne Amendment Dote_|By}No. Amendment Date [By hewneryae Reraniiaay | Phy (07) 5664 4511 Fax: (07) Stbb 4959 M3087 - COS F
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0831 - Approved Plans [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.