PAVEMENT DETAILS ‘
DRIVEWAY AND DRIVEWAY CROSSOVER
1. EARTHWORKS AND PAVEMENT CONSTRUCTION ARE TO BE CARRIEO OUT IN
PERVE VEL
ese ys HATCHING INDICATES CONCRETE PAVEMENT REFER STRUCTURAL ACCORDANCE WITH AS 3798 WITH GEOTECHNICAL SUPERVISION TO LE’
* ENGINEERING DRAWINGS BM003087/G-01-A TO G-06-A
. THE CONTRACTOR SHALL PROVIDE CERTIFICATION THAT THE WORK AND ——— 4+ —_
GEQTECHNICAL SUPERVISION COMPLIES WITH AS 3798,
aa
OB 3 ar
PAVEMENT DEPTHS MAY BE VARIED BY THE SUPERINTENDENT 3, THE CONTRACTOR SHALL REFER TO GEOTECHNICAL INVESTIGATION REPORT.
FOLLOWING SUBGRADE TESTING,
4. SITE PREPARATION: 2.No.25 DIAMETER SPIKING HOLES (TO
COMPACTION STANDARDS SUIT SPIKES 20 DIAMETRE x 300
a. STRIP TOPSOIL MIN 150 OR MORE AS REQUIRED TO REMOVE MINIMUN, LENGTH}
ROADWORKS TO 300mm BELOW SUBGRADE = 98% STANDARD ALL VEGETABLE MATTER TO THE BASE OF THE SUB GRADE.
ROADWORKS WITHIN 300mm OF SUBGRADE 110% STANDARD = r 7 Ce
LOT Fit 98% STANDARD b. FURTHER EXCAVATE IF REQUIRED TO BOX OUT TO MINIMUM
SUB BASE GRAVEL 100% STANDARD PAVEMENT THICKNESS. REMOVE AND RECOMPACT FILL AS PER ut] i Los
BASE GRAVEL 100% STANDARD GEOTECHNICAL REPORT NOTE ON THIS DRAWING.
CONCRETE TYPES COMPACT SUBGRADE TO A MIN RELATIVE DENSITY RATIO OF 98% WHEELSTOP DETAIL
STANDARD COMPACTION AS OEFINED IN AS 1289 IN THE TOP 200. NOT TO SCALE
STORMWATER STRUCTURES N32 HUMES TYPICAL WHEELSTOP OR
FOOTPATHS N25 d. EXCAVATE AND REPLACE WITH STRUCTURAL FILL ANY SOFT APPROVED SIMILAR.
DRIVEWAY PAVEMENT INCLUDING SPOTS OR HEAVING SUBGRADE AREAS. STRUCTURAL FILL SHALL BE
ROLL UP KERB N32 APPROVED GRANULAR FILL {100mm MAXIMUM PARTICLE SIZE,
MINIMUM SOAKEO CBR = 15 PLACED IN LAYERS NOT EXCEEDING
NOTES 20dmm AND COMPACTED TO ACHIEVE NOT LESS THAN 98 PERCENT
MAXIMUM RELATIVE ORY DENSITY {STANDARD}, OR 70 PERCENT DRY
PROVIDE SUBSOIL DRAINS UNDER ALL KERB AND CHANNEL AND DENSITY INDEX IN ACCORDANCE WITH AS 1289. SITE FILLING
e OTHER KERBS AND PAVEMENT EDGING. MATERIAL AND COMPACTION UNDER THE PAVING AND BUILDING
. SHALL BE AS ABOVE.
PROVIDE 100@ HEAVY QUTY CONDUITS 200mm ANO EXTEND
. UNDER CONCRETE ORIVEWAYS WHERE CONDUIT LOCATIONS
. REQUIRED.
NOTIFY ALL RELEVANT AUTHORITIES PRIOR TO COMMENCEMENT
OF WORK WITHIN EXISTING ROAD RESERVES.
THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL
EXISTING SERVICES WITHIN THE SITE PRIOR TO COMMENCING
WORK, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY
DAMAGE TO EXISTING SERVICES WHETHER SHOWN ON THE
DRAWINGS OR NOT,
ALL WORK SHALL CONFORM WITH THE RELEVANT LOCAL
AUTHORITY'S SPECIFICATIONS AND REQUIREMENTS.
Sunshine Coast Regional Council
@ 2000, 0B3/
Development Permit Gperational Works No: --
RECOMMENDE PROVAL
Under no circumstances may the Plan & Specitications be departed
from within the written approvat of Council,
PLANS APPROVED .
Oelegated Authorising Officer
a
z
NOTES: TITLE: PROJECTI gate MARCH 20! SAUL AS SHOWN
1 = BARLOW GREGG .wewa_| STANDARD DETAILS - GENERAL | PROPOSED OFFICE oesceen aM | -Penoven
L This 15 the peeperty of the engineer, cad moy cot ,
be et, ead iy et | 7 erent DEVELOPMENT at DAVID LOW [= | Ole Oe
i press penaission of . , : ; cena 7
Cf CROSSOVER DETAR REMOVED Tara | regio! i on vey wey est tage cote | | 1S a ieee mas WAY, PEREGIAN BEACH PROJECT-SUBSET-SHEET-REVISION
@[ CETANS aNENOED Brive | 2, Figored dmensions teke precedence ever scaled, tad eM ism Camas coasts {ESSOCIATED CONSIA TANTS for MORGAN & BEIERS ATF
A] SUE FOR OPERATIONAL WORKS APPROVAL wa7oa] & 3. Venty oll fons on site, a serrauany Chast: CORE ARCHITECTS + 3087 - (04 C-
No. Amendment Date |ByjNo. Amendment Octe [By meer Pewee (021 344 72 Ph: {97} S&G6 4511 Fax: (07) S446 4969
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0831 - Approved Plans [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.