Decision Notice - Minor Change - 132007 12 9 [As Published]
3. CURRENCY PERIOD OF APPROVAL
The currency period for this development approval is stated in the conditions below.
4. ASSESSMENT MANAGER CONDITIONS
Land Use
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
CP 2.02C-2 4 Proposed Parking on site, prepared by 23 February 2023
Team2 Architects
DA-02-F 3 Proposed Overall Podium Level, 23 February 2023
prepared by Team2 Architects
DA-03-F 1 Proposed Overall Upper Level, prepared 23 February 2023
by Team2 Architects
0427- DA05E - Stage 2 Podium Plan, drawn by Middap 13/12/2007
Ditchfield Pty Ltd
0427 - DA06E - Stage 2 Upper Floor Plan, drawn by 13/12/2007
Middap Ditchfield Pty Ltd
0427 - DA07D - Stage 2 Roof Plan, drawn by Middap 13/12/2007
Ditchfield Pty Ltd
Proposed Elevations & Sections,
0427- DA09D - drawn by Middap Ditchfield Pty Ltd 13/12/2007
Plan of Lots 4, 5 & Emt D (Restricted)
in Lot 4 SP 196846, drawn by Jones
Flint & Pike
DA 01F Site Plan, drawn by Middap
- Architecture Pt (as annotated by March 2017
Council)
DA 02F - Level 1 Plan, drawn by Middap March 2017
Architecture
DA 03F - Level 2 Plan, drawn by Middap March 2017
Architecture
DA 04F - Level 3 Plan, drawn by Middap March 2017
Architecture (as annotated by Council)
DA 05F 1 Elevations (North-east & South-East), March 2017
drawn by Middap Architecture (as
annotated by Council)
DA 06F - Elevs (South West & North West) and March 2017
Section
DA—201 1 Elevations, prepared by Team2 19 December 2022
Architects
Page 2 of 18
Document Set ID: 22465906
Version: 7, Version Date: 22/06/2023