Decision Notice - Minor Change - 132007 12 9 [As Published]

of 18

Page text shows just the words. Original shows the document exactly as it was published.

                      Erosion and Sediment Control
               54.    Any person acting on this permit shall prevent erosion and sediment export from leaving
                      the site. Site control measures such as silt fencing, controlled gravel access to the site
                      and controlled disposal of waste, will be necessary.
                      In this regard plans detailing the methods of controlling erosion and sediment are
                      required to be submitted to the Council for approval prior to obtaining a Development
                      Permit for Operational Works.
               55.    Monetary contributions shall be paid to Noosa Council towards the cost of providing
                      and/or upgrading various infrastructure at the rates applicable at the time of payment.
                      An estimate only of the contribution amounts under the current Council policies and
                      requirements is outlined in the table below:

                                                                                    STAGE B             TOTAL
                        Contribution Required For:                 STAGE A        (in addition to      Stage A+
                                                                                     Stage A)          Stage B

                        PSP12 - Public Open Space                   $3,233                $0            $ 3,233
                        Contributions (Park)
                         PSP16 - Seweraqe Headworks                 $ 34,617        $ 14,785            $49,402
                         Contributions
                        PSP17   -Water Supply Headworks             $29,629         $25,727             $55,356
                        Contributions
                        PSP20 - Pathway Trunk Network               $ 3,266               $0            $3,266
                        Contributions


                                TOTAL Contribution Amount =                I   $ 70,745    I $40,512      I $111,257
                              Please note, that these amounts are all subject to variations in the Consumer Price
                              Index, All Groups Brisbane from SEPTEMBER 2008 until the date of payment.


                      All contributions must be paid prior to the issue of a Development Permit for Operational
                      Works for the relevant stage.
                      Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should
                      not be paid at the due time, Council shall call upon the trading bank guarantee in full.
                      Processing of bonds for security where specific Council approval has been given for
                      the bonding of contributions will incur an administration fee in accordance with Council's
                      Land Development Commercial & Regulatory Fees at the time of lodgement.
                      In the event that the Development Permit for Material Change of Use of Premises
                      lapses or is cancelled, the paid contributions and/or the trading bank guarantee will be
                      returned.
                     General
               56.    A suitably qualified Registered Professional Engineer shall prepare engineering
                      drawings and specifications for all engineering works that will become Council
                      infrastructure, which shall be submitted in conjunction with an application for a
                      Development Permit for Operational Works. To avoid conflict with underground pipes or
                      services, all existing and proposed services required by the development shall be shown
                      on the plans.
               57.    Any alteration of any public utility or other facilities necessitated by the development of
                      the land or associated construction works external to the site shall be at no cost to
                      Council.




                                                                                                         Page 8 of 18
Document Set ID: 22465906
Version: 7, Version Date: 22/06/2023
Log in to download the original file

Decision Notice - Minor Change - 132007 12 9 [As Published].pdf · 339 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.