Log in to see the plans as drawn Table 6.3.1.3 Criteria for assessment (part)
Performance Outcomes Acceptable Outcomes
Earthworks and drainage
PO21 AO21
Filling and excavation for operational works do not directly, Filling and excavation for operation works are designed and
indirectly or cumulatively cause adverse impacts external to the constructed to ensure overland flow and/or flooding is not
development site by: worsened, impeded, or otherwise diverted to adversely affect
(a) causing ponding of water on the site or nearby land; other properties or downstream environments.
(b) increasing flooding, which adversely affects the safety or
use of any land upstream or downstream; or
(c) adversely affecting the flow of water in any overland flow
path.
Figure 6.3.1.4 - Setbacks
**FINAL DRAFT - Post Consultation 2019** Page 11 of
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.