Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 2 - Final New Noosa Plan Part 1-3 and 5-6 Track Change version

of 347

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      erformancePerformance outcomes                                   Acceptable Outcomes
                                                                       Loading and storage areas are well lit or can be locked after
                                                                       hours.
      PO41                                                             AO41
      All premises and access routes are clearly identifiable to all   All premises are identified by the provision of the street number
      persons, particularly emergency services personnel.              in a prominent location, preferably near the site entry, (i.e. on
                                                                       the kerb or letterbox or by signage on the building or site).
      PO42                                                             AO42.1
      Building entries are visible and easily identifiable.            The number of entrances and exits are limited and main
                                                                       building entrances/exits are located at the front of the site in
                                                                       view of the street. Where this is not possible, due to site or
                                                                       existing building constraints, a well­defined path is provided to
                                                                       the entrance/exit.

                                                                       AO42.2
                                                                       All entrances/exits to buildings, are well lit and signed, and
                                                                       signage includes hours of operation.

                                                                       AO42.3
                                                                       Entrances/exits are located to provide a direct link to driveways
                                                                       and car parking areas.

                                                                       AO42.4
                                                                       Recessed doorways are avoided where the recess is of
                                                                       sufficient size to conceal a person or where recessed doorways
                                                                       are unavoidable, the following measures are used to enhance
                                                                       safety:
                                                                       (a)   good lighting;
                                                                       (b)   strategically placed mirrors;
                                                                       (c)   angled approaches; or
                                                                       (d)   gates which restrict access.

      Vandalism
      PO43                                                             AO43
      Buildings and structures are designed to minimise                Buildings or structures that are visible or accessible from a
      opportunities for vandalism.                                     public street or laneway:
                                                                       (a)   avoid the use of solid fences and blank walls which
                                                                             attract graffiti. Where solid blank surfaces are
                                                                             unavoidable, measures in the form of landscaping,
                                                                             creepers, murals, vandal resistant paint, etc. are used;
                                                                       (b)   with windows at ground level use measures that deter
                                                                             break and enters without obscuring views to shopfronts;
                                                                             and
                                                                       (c)   are constructed to be vandal and graffiti proof.

      Lighting
      PO44                                                             AO44.1
      Lighting of appropriate intensities is provided to maximise      Lighting of appropriate intensities is provided which satisfies
      safety.                                                          the requirements of Australian Standard AS1158: Public
                                                                       Lighting Code, unless otherwise specified in this Code.

                                                                       AO44.2
                                                                       External lighting of a graduated intensity is provided which
                                                                       starts at a lower level of brightness at the perimeter of the site
                                                                       and rises to a higher level at the entrance to buildings or at the
                                                                       centre of the site.

                                                                       AO44.3


**FINAL DRAFT ­ Post Consultation 2019**                                                                                           Page 11 of 13
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 2 - Final New Noosa Plan Part 1-3 and 5-6 Track Change version(PDF, 4MB).pdf · 3.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.