Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 2 - Final New Noosa Plan Part 1-3 and 5-6 Track Change version

of 347

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
 Noosa Shire Planning Scheme
 Part 6 Zones
 6.7 Environmental zones category
 6.7.1 Environmental Management and Conservation Zone Code

     Application
     This code applies to:­
     (a)   assessable development on land within the Environmental management and conservation zone as identified on the
           zoning maps contained within Schedule 2 (Mapping); and
     (b)   acceptable development subject to requirements and identified as requiring assessment against the Environmental
           management and conservation zone code by the tables of assessment in Part 5 (Tables of assessment).

     Purpose and Overall Outcomes
     (1)   The purpose of the Environmental management and conservation zone is to provide for the protection and maintenance
           of areas that support one or more of the following:
           (a)    biological diversity;
           (b)    ecological integrity;
           (c)    naturally occurring landforms; or
           (d)    coastal processes.
     (2)   The overall outcomes sought for the Environmental management and conservation zone are as follows:­
           (a)    Land identified as ecologically important areas, water catchments, beach protection or coastal management areas or
                  natural areas with historical or cultural values are protected from development;
           (b)    Development avoids and mitigates against adverse impacts on the values and processes within ecologically
                  important areas;
           (c)    Where a demonstrated community need exists, low scale, low impact structures with a small building footprint such as
                  viewing decks, shelters and Environment Facilities that provide for the appreciation, conservation and interpretation of
                  ecologically important areas or areas of cultural or heritage value may develop where consistent with the management
                  intent or plan for the area;
           (d)    Low impact outdoor sport and recreation activities such as walking trails, canoe trails and the like may develop where
                  a demonstrated community need exists and such activities do not adversely affect the ecological values of the area;
           (e)    Low impact telecommunication facilities and utility installations occur only where they cannot locate in another
                  appropriate zone, are compatible with, and do not impact on, the values and process within ecologically important
                  areas and are designed to minimise the visual impacts on the scenic amenity of the area;
           (f)    Buildings and structures are designed to maximise energy efficiency and water conservation;
           (g)    Activities undertaken by recognised traditional owners in accordance with traditional owner custom and practice may
                  be considered; and
           (h)    Development responds to land constraints including topography, bushfire and flooding.


     Acceptable outcomes are provided for some, but not all, performance outcomes, and identify ways in which performance
     outcomes can be met. Compliance with the performance outcome should be demonstrated and the acceptable outcomes are
     considered as one way to satisfy the corresponding performance outcome.

 Table 6.7.1.3 ­ Criteria for assessment

     Table 6.7.1.3 ­ Criteria for assessment (Part)
      Performance outcomes                                             Acceptable outcomes



**FINAL DRAFT ­ Post Consultation 2019**                                                                                           Page 1 of 6
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 2 - Final New Noosa Plan Part 1-3 and 5-6 Track Change version(PDF, 4MB).pdf · 3.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.