Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 2 - Final New Noosa Plan Part 1-3 and 5-6 Track Change version
Plans and drawings: the text below has words only, no drawings.
Performance outcomes Acceptable outcomes
Role and function
PO1
The Environmental management and conservation zone No acceptable outcome provided
primarily protects land identified as ecologically important
areas, water catchments, beach protection or coastal
management areas and land with historical or cultural values.
PO2
Low impact recreation activities for the purpose of an No acceptable outcome provided
environment facility provides opportunities for the appreciation,
conservation and interpretation of ecologically important areas
or areas of cultural or heritage value.
PO3 AO3
Low impact outdoor sport and recreation activities such as Development includes linkages to or between existing or future
walking, cycling and canoe trails, develop for recreation, leisure components of the Noosa Trail Network.
and nature appreciation purposes and do not include buildings,
structures or infrastructure.
PO4
Low impact telecommunication facilities and utility installations No acceptable outcome provided
are compatible with, and do not affect, the values and process
within ecologically important areas and are designed to
minimise the visual impacts on scenic amenity.
PO5
Development maintains the primary function of the zone and No acceptable outcome provided
protects ecologically important areas, water catchments,
waterway connectivity, marine plants, beach protection and
coastal management areas and land with historical or cultural
values.
PO6
Development and use of premises within 750 metres of the No acceptable outcome provided
Noosaville airport do not cause an obstruction or any other
potential hazard to aircraft movement associated with the
airport.
Table 6.7.1.3 Criteria for assessment (Part)
Performance outcomes Acceptable outcomes
Building design and built form
Height and Scale
PO7 AO7.1
Buildings and structures— Buildings and structures are no more than 4 metres in building
(a) are low rise, and have a maximum building height of 1 height.
storey and appear no more than one storey from any
elevation; AO7.2
The maximum length of wall in one place is 15 metres.
(b) have a minimal footprint on the land;
(c) do not visually dominate the site or surrounding spaces; AO7.3
and For any individual building or roofed structure, no more than
(d) are low set and of a smaller scale to the prevailing 150m² is under the roof.
vegetation around them.
AO7.4
Where development involves excavation ofi s a siterequired,
anythe maximum portion of anthe exposed external wallfaçade
i sof backfilledthe tobuilding groundcannot levelexceed 4 metres
in building height.
**FINAL DRAFT Post Consultation 2019** Page 2 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.