Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 2 - Final New Noosa Plan Part 1-3 and 5-6 Track Change version

of 347

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
     Table 6.8.1.3 Criteria for assessment (part)
      Performance outcomes                                                 Acceptable outcomes

      Earthworks and drainage
      PO47PO48                                                             AO47AO48
      Development and associated site works including filling,             Development and associated site works, including filling and
      excavation and retaining structures do not directly, indirectly or   excavation, are designed and constructed to ensure overland
      cumulatively cause adverse impacts external to the                   flow and/or flooding is not worsened, impeded, or otherwise
      development site by:                                                 diverted to adversely affect other properties.
      (a)   causing ponding of water on the site or nearby land;
      (b)   increasing flooding, which adversely affects the safety or
            use of any land upstream and downstream; or adversely
            affecting the flow of water in any overland flow path.


     Table 6.8.1.3 Criteria for assessment (part)
      Performance outcomes                                                 Acceptable outcomes

      Environment, heritage and scenic amenity
      PO48PO49                                                             AO48AO49.1
      Development:                                                         For landscape amenity reasons, cut or fill is less than 1.5
      (a)   retains natural vegetation wherever possible;                  metres in depth relative to the ground level.

      (b)   has minimal impact on the natural landform of the site;
                                                                       AO48.2
      (c)   does not lead to erosion or the transport of sediments off Development does not result in sediment or other material
            site;                                                      including building materials or waste products being
      (d)   does not lead to the disturbance of natural features,      deposited or released into the road reserve, stormwater
            buildings or structures of cultural heritage significance. drain or adjacent properties.

                                                                           AO48.3AO49.2
                                                                           Where there is a nominated building envelope on the lot,
                                                                           clearing of native vegetation and building works does not
                                                                           extend beyond the building envelope, except for the purposes
                                                                           of a driveway access.

                                                                           AO48.4AO49.3
                                                                           Development on a site adjoining a heritage site respects the
                                                                           cultural heritage significance of the site by mitigating any
                                                                           adverse impacts on the setting or integrity of the heritage.

                                                                           Editor’s Note— Heritage sites are identified on the Heritage
                                                                           and Character Areas overlay maps in schedule 2.

     Table 6.8.1.3 Criteria for assessment (part)
      Performance outcomes                                                 Acceptable outcomes

      Infrastructure
      PO49PO50
      Development is supported by adequate infrastructure and              No acceptable outcome provided
      services including reticulated water, sewerage, stormwater
      drainage, sealed roads, pathways, electricity and
      telecommunication infrastructure.
      PO50PO51
      Development does not adversely impact on the continued               No acceptable outcome provided
      operation, viability and maintenance of existing infrastructure or
      compromise the future provision of planned infrastructure.




**FINAL DRAFT ­ Post Consultation 2019**                                                                                            Page 11 of 11
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 2 - Final New Noosa Plan Part 1-3 and 5-6 Track Change version(PDF, 4MB).pdf · 3.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.