Council archive · source document
Planning Report Minor Change Bottlebrush · MCU22/0087.01
PIVOTAL 10. Security in the form of a cash bond or trading bank guarantee to the sum of $30,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to prestart meeting. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. 26. Bottlebrush Avenue must be upgraded for the length of its frontage to the subject site. The must include in particular: a. construction of the kerb and channelling and on-street parking generally as shown on drawing number C40 revision E prepared by Recor dated 14.11.2024. b. removal of the existing timber retaining wall in the road reserve c. extension of the kerb and channel to a point 1m past the proposed stormwater outlet in Bottlebrush Avenue Condition 26 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk infrastructure. 27. The existing crossover and driveway in Berrima Row must be wholly removed and the kerb and channel reinstated as part of the development works. 28. A sealed access driveway must be provided from Bottlebrush Avenue to all parking and manoeuvring areas of the development. The works must be generally as shown on drawing number C40 revision E prepared by Recor dated 14.11.2024. 32 - The site must be provided with a stormwater drainage system connecting to a lawful point of discharge. The works must be undertaken generally in accordance with drawing number C40 revision E prepared by Recor dated 14.11.2024 and include on-site rain water storage (3,000 litres) used for non-potable purposes. The design of the on-site rain water system must be submitted to Council at least 5 business days prior to the pre-start meeting. Condition 32 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk infrastructure. OPW Conditions 47. Development authorised by this approval must be undertaken generally in accordance with the Approved Plans listed in the tables below. held. Plan No. Rev. Plan/Document Name Date C30 E Bulk Earthworks Plan prepared by Recor Consulting 14.11.24 C31 E Bulk Earthworks Sections prepared by Recor Consulting 14.11.24 C40 E Roads and Drainage Layout Plan prepared by Recor Consulting | 14.11.24 C41 E Roads & Drainage Details prepared by Recor Consulting 14.11.24 C42 E Stormwater Drainage Sections prepared by Recor Consulting 14.11.24 C43 E Driveway Longsection prepared by Recor Consulting 14.11.24 CD-001 B Specification Notes prepared by Project Urban 14.10.24 CD-102 Cc Landscape Plan prepared by Project Urban 14.10.24 CD-103 Cc Landscape Plan prepared by Project Urban 14.10.24 CD-600 Cc Tree Retention and Removal Plan prepared by Project Urban 15.11.24 CD-900 Cc Construction Details prepared by Project Urban 14.10.24 - 1 Arboricultural Impact Assessment, prepared by, Consult Arborist | 30/11/2022 CD-000 G Cover Sheet prepared by Project Urban 15.11.24 CD-100 G Landscape plan prepared by Project Urban 15.11.24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Planning Report Minor Change Bottlebrush.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.