Planning Report Minor Change Bottlebrush · MCU22/0087.01

of 10

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Criteria Approval Proposal

« Frontage (Berrima) 6m 4.9-5.5 metres 4.85m

* Side (north west) 1.5m NA NA

* Rear (north east) 1.5m 1.7 metres 1.7m

First Floor

«Frontage (Bottlebrush) 10m | 5.1 -6 metres 5.0m

« Frontage (Berrima) 10m 5.5 metres 5.5m

* Side (north west) 2m NA NA

* Rear (north east) 2m 1.7 metres 1.7m

Second Floor (roof

terrace)

«Frontage (Bottlebrush) 10m | 9 metres NA

* Frontage (Berrima) 10m 6.3 metres NA

* Side (north west) 2m NA NA

* Rear (north east) 2m 2.5 metres NA

Length of wall 15m 10m

Basement width 6m 5.7m

Landscaped open space 40% (196m?) 252m?

Soft landscaping 60% soft (117m?) 118m?

Landscaping Setbacks 1.5m to unit 3 pool 1.3m to unit 1
pool

Private Open Space 20m? each 20m? each

Carparking 6 spaces 6 spaces

PIVOTAL

Compliance

No sig change
NA

No change
*(Pool <1m)

No sig change
No change
NA

No change

Increase
Increase

NA

Increase

v

v

No change

No change

No sig change

No change
No change

As outlined in the Table, the proposal is generally in accordance with the existing approval

Changes to Conditions

As a result of the proposed changes the following conditions require changing:

MCU Conditions

2 - This development approval lapses if the use has not happened by 21 July 2030, unless an
application to extend the currency period is approved by Council.

3 - Development authorised by this approval must be undertaken generally in accordance with the

Approve’ Plans listed in the tables below. Fhe PaRS PAUSE be amended fo sneorporate ie

 

Plan No. Rev.

Plan/Document Name

Date

DA2.01
DA2.02
DA2.03
DA2.04
DA3.01
DA3.02
DA3.03
DA3.04
DA4.01
DA4.02

QO} 0) @) QO} O) OO) OQ) @) ©

Ground Floor, prepared by Blackwood
Level 1 Floor Plan, prepared by Blackwood
Level 2 Floor Plan, prepared by Blackwood
Roof Plan, prepared by Blackwood

North Elevation, prepared by Blackwood
East Elevation, prepared by Blackwood
South Elevation, prepared by Blackwood
West Elevation, prepared by Blackwood
Section A, prepared by Blackwood

Section B, prepared by Blackwood

25.11.24
25.11.24
25.11.24
25.11.24
25.11.24
25.11.24
25.11.24
25.11.24
25.11.24
25.11.24

 

Used in these records

About this file

File size
2.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Planning Report Minor Change Bottlebrush.pdf · 2.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.