Original source · versioned page text
Minor Change - Planning Report
2.2 Surrounding Development Several private boat lifting devices of various configurations exist within proximity to the subject site as demonstrated in Figures 2-3. These boat storage devices are of a similar, if not larger, configuration than the Sea Pen proposed for the existing approved jetty at the subject site. The aerial photographs demonstrate that the proposed new boat lifting device is consistent with the amenity and character of the development within the canal estate. RG Strategic Town Planning Report – OPW Application 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.