Council archive · source document
09/0943 - Op works - Jetty & Boatlift [As Published] · 142009.943
SNTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
[SECTION , Section 1 must be completed for all applications that require completion of the IDAS Assessment Checklist.
HERITAGE — =a | —
141A \s any part of the proposal intended to be carried out on a Queensland heritage place under the Queensfand Heritage Act 1992?
fK] No-cotota = (_] Yes
BA eter Det tae cee SE Rige ren oe Ee
1.48 Does the proposal involve development intended to be carried out on a place entered in a local heritage register under part 11 of
the Queensland Heritage Act 1992, other than if the place is on Cairns or Mackay airport land?
EX] No-cotoor2 [(] Yes
IS scheuule 4 pot aoe 5 ted Ab Requiason SI
‘REMOVING QUARRY MATERIAL; WILD RIVER AREA
—
41.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
{RI No-cotoo13 (] Yes
DA schagu'e & pat { lable 5 dem 1 IP Regulation schedule 2 table 2 em 11 IP Requiation schedule 7 table & nem 2 tyaid nver area’ Water Act 2itKs
secnon 96EC Wid Rivers Act 2005 section 434
ENVIRONMENTALLY RELEVANT ACTIVITY: WILD RIVER AREA ——
13 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
KK No-cotoai4 {"] Yes
IPA schedule 8, part 1 table 2 tem 7 IPA schedule 8 part 4. table 5, items 3 and 4 IP Regulation schedule 2 table 2 items 1 and 23 Envimnmenial Protection Act 1994 section
734A (wikt aver area). Wild Rivers Act 2005. section 434 relevant witt fver declaration Wid Rivers Cove
—_ Scare nT ening
1.4 Is any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
[X] No -Gotoars
C] Yes
IP Ragulavon schedule 2 table 2, items 15 ang 76
DECLARED FISH HABITAT AREA ]
15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
KX] No - Go to 07.6
oO Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI8F). If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
'P Fequiton reheguie 2 table 2 tem 26
a me
COMM UNITY INFRASTRUCTURE
1.6 Is any part of the premises designated for community infrastructure?
Xl No -Go toQt7
LJ Yes
P Requiation schedcle 2 tale 3 tem 7
17 Does the proposal involve the establishment or expansion of a waste water disposal system?
[X] No -Endof Sections [_] Yes
B Reng aaa . wet 7 ube 4d tee S
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0943 - Op works - Jetty & Boatlift [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.