09/0943 - Op works - Jetty & Boatlift [As Published] · 142009.943
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Verston 22
SECTION: 4. Section 4 must be completed when the apehecaton os seeks 5 spprovell to carry out operational work.
PLANNING SCHEME
- meme oe “
41 Is the proposed operational work assessable under a any State planning regulatory provisions?
{K}No =F] Yes
If no, is the proposed operational work assessable under the planning scheme?
J No - Gotoas2 DX] Yes - Complete Form 1. Part E and answer Q4 1.1 - 4.1.7 below
‘STATE-CONTROLLEDROAD = ° ~
4.1.1 ts any part of the premises located i in part of a future State-controlled road, or within 100m of a State-controlled road?
KJNo (7 Yes
If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?
EX] No -Goto.041.2
a} Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
'P Reguiatinn sunedule 2 tan'e 3 lem 3 IP Reguiation schedule 2 table 3 tem tb)
ACID SULFATE SOILS _.-
— ee eee F -
41.2 Is any of the operational work proposed in a local government area listed*" in 1 State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils
EX] No -Gotoas1.3 C1 Yes
4M arukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Cairns, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooioola, Douglas,
Fitzroy, Gladslone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday
WF Requiaton schedule 2, table 3 ea 1 seat vy Hewes IN Fae sention 26
pee
[EASEMENTS AND SUBSTATIONS _
Seti se
ring nd Mananing Deveinpment involving Acid Sutteter Son's
413 Is any of the proposed operational work for filing or excavation?
BX} No -Gotoas14
C] Yes
1 Reguiation schedule 2 table 3 item 10ta), IP Requtation schedule 2 fable 2 item 10{b}
4.1.4 Is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
td No -Gotoa41.5 [_] Yes
schedule 2 table 3 lem 17
(PUBLIC PASSENGER TRANSPORT .
4.1.5 Is any of the proposed operational work listed in schedule 43¢ of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?
h4| No- Go fo 04.1.6 Oo Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
IP Regivation schedule 2 tabie 3 tem 14
‘RAILWAY SAFETY AND EFFICIENCY
7 gu ey
416 Is any of the proposed ¢ operational work listed in schedule 13D of ‘the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?
& No- Go to 04.1.7 0 Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
iB Reguiatton &
2 lapig 3 tem i*
'KOALA CONSERVATION (outside SEQu urban ban footprint)
4.1.7 Is any part of the premises in a koala conservation area or koala sustainability area, other than in an SEQ urban footprint area?
{XJ No -Gotoas2 {_} Yes
IP Regulation schedule 2 labiy 4 tea: 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0943 - Op works - Jetty & Boatlift [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.