Council archive · source document
Decision Letter - Change to an Existing Approval - Plus Copy sent to DERM & QT (Maritime) [As Published] · 142008.383.02
2008/383 Page 10 of 19 [OCR of page images] 2008/383 12 13 14 16 Amended Concurrence Agency Response - |PCC01117608 The sand shifting activity and/or associated activites must not result in changes to hydrodynamics, tdal pnsm and tdal regime of the Noosa River All praccal and reasonable measures must be taken to prevent the occurrence of by-catch associated vath the operation of the sand shifting activity and/or associated activites The sand shifter is not to operate below a depth of 8 metres below the natural surface profile or the depth required to maintain stabelity of the Noosa River Training wall (whichever is the lesser) ‘Sand shail be placed uniformly along the section of beach to be nounshed using the discharge outlets available and in accordance with the specified plans All deposited sand shail be clean and free of silt, clay, organic matenal or any other deleterious substance and must be of a grain size compatible with the existing beach sand Acid Sulfate Souls 17 18 19 For all works within the Noosa Estuary that may potentially expose acid sulphate soils, an acid sulfate sod mvestigation must be performed in accordance with the QASSIT Guidelines (Ahern C R_, Ahern MR and Powell B , 1998, Guxdelines for Sampling and Analysis of Lowland Acid Sulfate Soils (ASS) in Queensland 1998, Queensland Department of Natural Resources and Mines) or subsequent versions thereof, prior to commencing the construction works Construction and operation of the sand shefting facility must comply with the latest edition of the Environmental Protection Agency's Instructions for the Treatment and Management of Acid Sulfate Sars, 2001 Acid sulfate soils must be managed such that contaminants are not directly or ndwecily released, as a result of the construction and operation of the sand shifting activity and/or associated activities, to any waters or the bed and banks of any waters Vegetation and Dune Stabudity 20 21 22 23 24 All works must be undertaken in a manner that minwmises damage to the vegetation adjacent to the site The vadth of cleanng of the vegetation for access and construction works |s to be minimised and mature trees are to be retained where possible by minor realignment of the works All organically ennched sand removed from the top layer (topsoil) within the proposed development areas must be stockpiled separately prior to excavabon, and respread over the development area after re-profiling as part of the revegetation works All areas of exposed sand are to be stabilised against wind erosion dunng the construcbon penod All matenal excavated from a dunal system for construction works must be placed, levelled and stabilised against wind erosion on the seaward side of the building or structure Any erosion or loss of sand surrounding the works that occurs because of changes caused by the works must be rectified Page 5 of 8 » AFO@0109 Department of Environment and Resource Management Page 10 of 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Letter - Change to an Existing Approval - Plus Copy sent to DERM & QT (Maritime) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 562 KB (small file)
- File type
No other editions are linked here.