Council archive · source document
Decision Letter - Change to an Existing Approval - Plus Copy sent to DERM & QT (Maritime) [As Published] · 142008.383.02
2008/383 Page 12 of 19 [OCR of page images] 2008/383 ; Amended Concurrence Agency Response - IPCC01117608 Monitoring 4 The Sunshine Coast Regional Council is to develop a Sand Shifting Management Plan which details the operational and monitonng strategies consistent with the conditions of this approval The Plan shall include a monitoring strategy for ensuring that the pumping regume is consistent with the natural net Ittoral deft rates As a minemum, the plan should mclude monthly monitoring of the vegetation line 35 Details of the quantity of sand recycled are to be sent to the Department of Environment and Resource Management on a monthly basis 36 Within 12 months of establishment and at 5 yearly mtervals or sooner f the Department of Enveonment and Resource Management has reasonable concerns that the local or regional natural coastal processes are being adversely affected, a program of research must be undertaken to determine the long-term impacts of the sand shifting operation on the depositional! charactenstics of Noosa Estuary In particular, the Department of Enveonment and Resource Management seeks to determine whether the operation of the sand shifting facility vathin the active system undermines the supply of sediment to the estuary The Department of Environment and Resource Management must be consulted in the development of the research program 37 Recording of any faunal by-catch assocated with the sand shifting actrvrty must be undertaken on a daily basis during days of operation Records of by-catch must be provided to the Department of Environment and Resource Management bi-annually for the first year of operaton 38 Beach and dune profiling ts to be undertaken every 6 months for the first 5 years and annually thereafter from the sand extracbon area at Noosa Spit Beach to the sand depossbon area at Noosa Main Beach One profiling event must be a detated survey (survey intervals of <50m) and include profiling of the surf zone (minsmum 5m water depth) The other profiling event must include 4 profiles of the beach zone (two at Noosa Sprt Beach and two at Noosa Main Beach) Both surveys must be provided to the Department of Environment and Resource Management upon completion Page 7 of 6 « AF080109 . Department of Environment and Resource Management Page 12 of 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Letter - Change to an Existing Approval - Plus Copy sent to DERM & QT (Maritime) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 562 KB (small file)
- File type
No other editions are linked here.