2017-09-21 Ordinary Meeting Minutes

of 19

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                      MINUTES


            Ordinary Meeting

        Thursday, 21 September 2017

                    commencing at 6pm
           Council Chambers, 9 Pelican Street, Tewantin




Crs Tony Wellington (Chair), Jess Glasgow, Ingrid Jackson, Joe Jurisevic,
Frank Pardon, Brian Stockwell, Frank Wilkie



                   “Noosa Shire – different by nature”
Log in to download the original file

2017-09-21 Ordinary Meeting Minutes(PDF, 303KB).pdf · 310 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 18 sections

Section 2

ORDINARY MEETING MINUTES                                             21 SEPTEMBER 2017



1   ATTENDANCE & APOLOGIES

    COUNCILLORS
    Councillor T Wellington, Mayor
    Councillor F Wilkie, Deputy Mayor
    Councillor J Glasgow
    Councillor I Jackson
    Councillor J Jurisevic
    Councillor F Pardon
    Councillor B Stockwell

    EXECUTIVE
    B de Chastel, Chief Executive Officer
    A Rogers, Director Community Services
    M Shave, Director Corporate Services
    K Rawlings, Director Environment & Sustainable Development
    D Iezzi, Director Executive Services

    APOLOGIES
    Nil.

    The meeting commenced at 6.00pm.



2   CONFIRMATION OF MINUTES
    Council Resolution
    Moved:         Cr Glasgow
    Seconded:      Cr Jurisevic
    The Minutes of the Ordinary Meeting held on 17 August 2017 be received and confirmed.
                                                                                   Carried.

3   MAYORAL MINUTES
    Cr Wellington moved the following motion:
    1      CHANGE OF INTENTION WITH REGARDS TO PROPOSED MOTION TO THE
           LOCAL GOVERNMENT ASSOCIATION OF QUEENSLAND 2017 ANNUAL
           CONFERENCE - REPEAL OF WASTE MANAGEMENT LEGISLATION
           That Council withdraw the Proposed Motion to the Local Government Association of
           Queensland (LGAQ) 2017 Annual Conference - Repeal of Waste Management
           Legislation following advice received from LGAQ.
                                                                                   Carried.
4   PETITIONS

    Nil.

5   NOTIFIED MOTIONS

    Nil.

                                                                              Page 2 of 19

Section 3

ORDINARY MEETING MINUTES                                                  21 SEPTEMBER 2017


6    CONSIDERATION OF COMMITTEE RECOMMENDATIONS
AUDIT & RISK COMMITTEE RECOMMENDATIONS
25 AUGUST 2017 – Cr Wellington, Cr Jackson, Scott Williams, Cameron Jaggers

External attendees:    Debra Stoltz and Anthony Randell (Queensland Audit Office – attended
                       via teleconference for items 5 and 7)

The following Recommendations from the Audit & Risk Committee were adopted
without discussion or further amendment.
Council Resolution
Moved:           Cr Jackson
Seconded:        Cr Jurisevic
The Audit & Risk Committee recommendations dated 25 August 2017 be adopted.
                                                                                        Carried.



1    QUEENSLAND AUDIT OFFICE BRIEFING NOTE
     That Council note the Briefing Note provided by the Queensland Audit Office (QAO) to the
     Audit & Risk Committee meeting dated 25 August 2017 providing a status update on audit
     progress for the 2016/17 year and other related matters.


2    INTERNAL AUDIT AND ACTION ITEMS UPDATE
     That Council note the report by the Governance Advisor to the Audit & Risk Committee
     Meeting dated 25 August 2017 and:
     A.     Note the draft Internal Audit scopes provided at Attachment 1 and request staff to
            undertake further discussions with the Internal Auditors with a view to expanding the
            scopes for the following Internal Audits:
            1.   Insurance Strategy and Renewal process; and
            2.   Rates and Utility Charges.
     B.     Note the Register of Action Items provided at Attachment 2 providing an update on the
            organisation’s progress in implementing previous internal and external audit
            recommendations.

3    DRAFT FINANCIAL STATEMENTS 2016/17
     That Council note the report by the Acting Manager Financial Services to the Audit and Risk
     Committee Meeting dated 25 August 2017 regarding the draft general purpose financial
     statements for the period ended 30 June 2017.

4    RISK MANAGEMENT AND GOVERNANCE UPDATE
     That Council note the report by the Governance Advisor to the Audit & Risk Committee
     Meeting dated 25 August 2017 providing an update on Risk Management and Governance
     matters.

5    ICT RISK MANAGEMENT UPDATE
     That Council note the report by the ICT Manager to the Audit and Risk Committee Meeting
     dated 25 August 2017 providing an update on ICT Risk Management.

                                                                                   Page 3 of 19

Section 4

ORDINARY MEETING MINUTES                                                21 SEPTEMBER 2017


PLANNING & ENVIRONMENT COMMITTEE RECOMMENDATIONS
12 SEPTEMBER 2017 - Crs Joe Jurisevic (Chair), Ingrid Jackson, Brian Stockwell and
Tony Wellington
Other Councillors in attendance: Cr Frank Wilkie


6    MCU16/0081 - APPEAL D93 OF 2017 - DEVELOPMENT APPLICATION FOR MATERIAL
     CHANGE OF USE FOR MULTIPLE HOUSING TYPE 3, RETIREMENT & SPECIAL NEEDS
     (90 BED AGED CARE FACILITY) AT 28 EENIE CREEK ROAD, NOOSAVILLE
     Council Resolution
     Moved:            Cr Stockwell
     Seconded:         Cr Jurisevic
     That Council note the report by the Manager, Development Assessment to the Planning &
     Environment Committee Meeting dated 12 September 2017 regarding Planning &
     Environment Court Appeal D93 of 2017 and officer’s advice that the appeal has been
     withdrawn.
                                                                                      Carried.


The following Recommendations from the Planning & Environment Committee were
adopted without discussion or further amendment.
Council Resolution
Moved:         Cr Jurisevic
Seconded:      Cr Pardon
The Planning & Environment Committee recommendations dated 12 September 2017 be adopted
except where dealt with or held over by separate resolution.
                                                                                      Carried.




1    MCU17/0025 & OPW17/0095 - DEVELOPMENT APPLICATION FOR MATERIAL
     CHANGE OF USE FOR INDUSTRIAL BUSINESS TYPE 1 WAREHOUSE (SELF
     STORAGE FACILITY), OPERATIONAL WORKS (ADVERTISING DEVICES) AT 62 AND
     64-66 RENE STREET, NOOSAVILLE
     Item not dealt with by Planning & Environment Committee.            Referred to General
     Committee for consideration.
     Reason for referral – Councillors sought clarification on the size of existing signage
     and the location of existing fencing.


2    MCU15/0109 - REQUEST FOR NEGOTIATED DECISION NOTICE - DEVELOPMENT
     PERMIT FOR MATERIAL CHANGE OF USE FOR MULTIPLE HOUSING - TYPE 4
     CONVENTIONAL (44 UNITS) AT RESORT DRIVE, NOOSA HEADS
     That Council note the report by the Coordinator Planning regarding representations made to
     change conditions of a Development Permit for a Material Change of Use (MCU15/019) for
     Multiple housing Type 4 - Conventional (44 units) situated at Resort Drive, Noosa Heads
     (Noosa Springs) and:




                                                                                  Page 4 of 19

Section 5

ORDINARY MEETING MINUTES                                                 21 SEPTEMBER 2017


    A.   Amend the description of the development within the Decision Notice to Development
         Permit for Material Change of Use of Premises – Multiple Housing Type 4 –
         Conventional (37 units)
    B.   Agree to change conditions 1, 2, 3, 4, 6, 13, 20, 27, 28 30, 31, 37, 48, 50, 51, 52 & 53
         as per the conditions contained in the Planning & Environment Committee Agenda
         dated 12 September 2017.
    C.   Add the following conditions:
         63.   The first application seeking Operational Works approval for this development
               must include a concept design that demonstrates all stormwater runoff from
               hardstand and fertilised landscaped areas of the completed development,
               including runoff destined for groundwater infiltration, can be treated to achieve
               pollution reduction targets to achieve an 80% reduction in Total Suspended
               Solids, 60% reduction in Total Phosphorous and 45% reduction in Total Nitrogen
               compared to an untreated scenario.
         64.   Where proprietary devices are proposed to be used within the development, the
               first application seeking Operational Works for this development must
               demonstrate that the performance input/output parameters used within water
               quality modelling for the nominated proprietary device are consistent with the
               final approved version of the Stormwater Australia Stormwater Quality
               Improvement Devices Evaluation Protocol.
         65.   The rear 2 metres of Blocks 10, 11 and 12 is to be extensively landscaped and
               no structures or swimming pools are to be located in these areas. No access is
               to be provided from the rear of these Blocks to Resort Drive.


3   132005.1133.06 REQUEST TO CHANGE A DEVELOPMENT APPROVAL FOR 155
    MULTIPLE DWELLING UNITS AND ASSOCIATED FACILITIES - SHOP, RESTAURANT,
    MULTI-FUNCTION ROOM, AND GYM FOR RESORT DRIVE AND LESLIE DRIVE,
    NOOSA HEADS
    That Council note the report by the Coordinator Planning to the Planning & Environment
    Committee Meeting dated 12 September 2017 regarding Application No. 132005.1133.6 for
    a Development Permit for a Material Change of Use for a Resort of 151 Multiple Dwelling
    Units and Associated Facilities - Shop, Restaurant, Multi-Function Room and Gym situated
    at Leslie Drive Noosa Heads and:
    A.   Amend the description of the development in the Decision Notice to read Material
         Change of Use for 145 Multiple Dwelling Units and Associated Facilities – Shop,
         Restaurant, Multi-Function Room and Gym
    B.   Agree to change conditions 1, 2, 5, 8, 9, 10, 12, 13, 19, 20, 21 33, 47, 49 & 64 as per
         the conditions contained in the Planning & Environment Committee Agenda dated 12
         September 2017.
    C.   Add new condition as follows:
         96.   The rear 2 metres of Blocks 7, 8 and 9 is to be extensively landscaped and no
               structures or swimming pools are to be located in these areas. No access is to
               be provided from the rear of these Blocks to Resort Drive.
    D.   Delete Conditions 17, 22 and 27.




                                                                                   Page 5 of 19

Section 6

ORDINARY MEETING MINUTES                                                21 SEPTEMBER 2017


4   51994.1353.01 REQUEST TO CHANGE DEVELOPMENT APPROVAL FOR A
    RESTAURANT AND OUTDOOR DINING AREA FOR 5/50 HASTINGS STREET, NOOSA
    HEADS
    Item not dealt with by Planning & Environment Committee.            Referred to General
    Committee for consideration.
    Reason for referral – Significance of issue.


5   RAP16/0033 - CONCURRENCE AGENCY REFERRAL FOR A DETACHED HOUSE
    SITUATED AT 35 SEAVIEW TERRACE, SUNSHINE BEACH
    That Council note the report by the Development Planner to the Planning & Environment
    Committee Meeting dated 12 September 2017 regarding Application No. RAP16/0033 for a
    Concurrence Agency Response for a Detached House situated at 35 Seaview Terrace,
    Sunshine Beach and:
    A.   Require the following conditions be included on any development approval:
         PLANNING
               When Conditions must be Complied With
         1.    Unless otherwise stated, all conditions of this Decision Notice must be complied
               with prior to the use commencing, and then compliance maintained at all times
               while the use continues.
               Approved Plans
         2.    Development undertaken in accordance with this approval must generally comply
               with the approved plans of development. The approved plans are listed in the
               following table unless otherwise amended by these conditions.
                 Plan No.   Rev.    Plan/Document Name                       Date
                 SK01       A       Site Plan                                10/05/2016
                 SK02       A       Ground Basement level                    10/05/2016
                 SK03       A       Level 1                                  10/05/2016
                 SK04       A       Level 2                                  10/05/2016
                 SK08       A       Sections                                 29/08/2017
                 SK09       A       North Elevation                          29/08/2017
                 SK10       A       Side Elevation                           29/08/2017
                 SK14 B     A       Elevations – External views              30/09/2016
                 DA6.1      A       Details – Garage Wall Details            11/10/2016
                 DA6.2      A       Details –Elevations                      11/10/2016

               Building Height
         3.    The maximum height of the development must not exceed 9 metres above the
               finished ground level and the natural ground surface.
         4.    The existing roof above the master bedroom must be altered in accordance with
               the approved plans to reduce the building in height to a maximum of 9 metres.
         5.    Certification must be submitted to Council from a Licensed Surveyor which
               certifies that the building does not exceed the maximum height requirement of
               this Decision Notice.


                                                                                    Page 6 of 19

Section 7

ORDINARY MEETING MINUTES                                                  21 SEPTEMBER 2017


               Building Appearance
         6.    The development must be finished in accordance with the external building
               colours as detailed on plan number DA6.2, prepared by Peter Hull and dated
               11/10/2016.
         7.    Roof materials must be non-reflective and designed with colours and styles to
               minimise the visual impact of the development.
               Landscaping
         8.    A minimum of 20% of the site must be retained as soft landscaping.
         9.    Existing trees on the site and within road reserves must be retained.
         10.   Three street trees with a pot size of 45 litres and of native, endemic species with
               a mature height of 4 metres must be planted on the road reserve in front of the
               wall of the pool to screen the excessive wall height.
         11.   The pond located at the entrance stairways of the dwelling must be converted to
               a garden and consist of native, endemic species.
         12.   All environmental weeds, including Singapore Daisy, must be eradicated from
               the road reserve and replaced with native plants
    B.   Include the following property note:
         1.    The driveway for 35 Seaview Terrace, Sunshine Beach is a non-standard
               driveway and is unsuitable for low or long vehicles to access the site.


7   AMENITY & AESTHETIC RESOLUTION
    That Council note the report by the Manager, Development Assessment to the Planning &
    Environment Committee Meeting dated 12 September 2017 regarding Council’s amenity &
    aesthetic resolution and:
    A.   Note that amendments made to the Sustainable Planning Act 2009 and Planning Act
         2016 have restored Council’s ability to effectively regulate building works and enforce
         locally important matters; and
    B.   Resolve to discontinue acting as a concurrence agency in the circumstances set out in
         Council’s resolutions of 18 August 2016 as amended by the resolution of 20 August
         2016 with respect to Schedule 7, Table 1 item 17 of the Sustainable Planning
         Regulation 2009.


8   LOCAL GOVERNMENT INFRASTRUCTURE PLAN (SOW COSTS & NETWORK
    DEMANDS)
    That Council note the report by the Infrastructure Assessment Coordinator to the Planning &
    Environment Committee Meeting dated 12 September 2017 regarding the remaining
    requirements for the Schedule of Works (SOW) Model for the new Local Government
    Infrastructure Plan (LGIP) under The Noosa Plan 2006 and approve:
    A.   The methodology used to determine existing trunk infrastructure network items from
         Council’s Geographic Information System (GIS) and current replacement costs
         obtained from Council’s Financial Asset Register;
    B.   The Generic Land Valuation prepared by CBRE Valuations Pty Limited dated February
         2012 provided in Attachment 1 to the report and indexed to the LGIP June 2014 base
         date as the basis for applying a uniform generic land cost in the Schedule of Works
         Model (SOW) for all existing and future land;


                                                                                    Page 7 of 19

Section 8

ORDINARY MEETING MINUTES                                                    21 SEPTEMBER 2017


     C.   A minor amendment to the Schedule of Works (SOW) future items for the Public Parks
          & Land for Community Facilities Network provided in Attachment 2 to the report noting
          that the cost estimates will be refined following completion of the excel SOW Model;
     D.   The LGIP Briefing Note provided in Attachment 3 to the report providing the basis for
          the Infrastructure Network Demand Assumptions and Conversions; and
     E.   Note that following completion of the SOW model, draft LGIP and Independent
          Reviewer’s first review, a further report on the complete draft LGIP will be presented
          for Council’s consideration and adoption to proceed to the Minister’s first State review.


9    ENVIRONMENTAL MONITORING CONTRACT - NOOSA SHIRE OPEN AND CLOSED
     LANDFILLS - CONTRACT NO: 1617T055
     That Council note the report by the Environmental Officer to the Planning and Environment
     Committee Meeting dated 12 September 2017 and Award Contract 1617T055 for
     Environmental Monitoring to Future-Plus Environmental for an initial period of three (3) years
     at an estimated total cost of $143,934 (excl. GST), (i.e. $47,981 excl GST per annum) with
     an option to extend for two (2) further periods of up to twelve (12) months each. The options
     to extend will be at Council’s sole discretion and subject to Council’s review of Contractor
     performance under the Contract and proposed pricing.


10   132003.221152.5 & CASE / 3814/2016 - PLANNING & ENVIRONMENT COURT APPEAL
     3184 OF 2016 - CHANGE TO AN EXISTING APPROVAL FOR MCU FOR A DWELLING
     TO INCLUDE AN UNROOFED DECK AND RETAINING WALL AT 12 PARK RD, NOOSA
     HEADS
     That Council note the report by the Manager, Development Assessment to the Planning &
     Environment Committee Meeting dated 12 September 2017 regarding Planning &
     Environment Court Appeal 3184 of 2016 and agree to settle the appeal generally in
     accordance with the following conditions:
     Additional Conditions (Deck and Terrace Area)
     1.   Development undertaken in accordance with this approval must comply with the
          following plans as amended by these conditions.
            Plan No.         Rev.   Plan/Document Name                                      Date
            MB_12PR_30       I      Cover Sheet, prepared by Myles Baldwin Design           10/08/17
            MB_12PR_31       H      Landscape Plan, prepared by Myles Baldwin Design        10/08/17
            MB_12PR_32       H      Elevation / Section, prepared by Myles Baldwin Design   10/08/17
            MB_12PR_36       E      Site Areas, prepared by Myles Baldwin Design            10/08/17
            MB_12PR_37       H      Sewer Setback Detail, prepared by Myles Baldwin         10/08/17
                                    Design
            MB_12PR_38       B      Existing Plants, prepared by Myles Baldwin Design       21/02/17
            MB_12PR_40       I      Landscape Plan – Lower Ground Level, prepared by        10/08/17
                                    Myles Baldwin Design
            MB_12PR_41       E      Lower Ground Level Planting Plan, prepared by Myles     10/08/17
                                    Baldwin Design
            MB_12PR_42       E      Lower Ground Level Structural Plan, prepared by Myles   10/08/17
                                    Baldwin Design
            MB_12PR_43       A      Equipment Photos, prepared by Myles Baldwin Design      20/03/17
            MB_12PR_50       C      Tree Protection Plan, prepared by Myles Baldwin         10/08/17
                                    Design


                                                                                        Page 8 of 19

Section 9

ORDINARY MEETING MINUTES                                                 21 SEPTEMBER 2017


    2.   The following amendments are required to the plans for the development and are to be
         submitted for approval prior to obtaining a development permit for operational work
         (landscaping):
         a.   MB_12PR_30 – Cover Sheet, the notes are to be updated to reflect the timber
              and steel support construction being proposed for the deck and terrace area. The
              blue line showing a pedestrian construction access is to be removed. The trees
              shown in red signifying they are to be removed from the road reserve are to be
              shown black signifying they are to be retained;
         b.   MB_12PR_31 – Landscape Plan, is to be amended with the trees shown in red
              signifying they are to be removed from the road reserve to be shown black
              signifying they are to be retained. The note referring to the temporary
              construction access and the associated blue line is to be removed;
         c.   MB_12PR_38 – Existing Plants, the notes referring to the existing plants planted
              in the road reserve by the owner are to be removed. All trees shown in red
              signifying they are to be removed from the road reserve are to be shown black
              signifying they are to be retained;
         d.   MB_12PR_40 – Landscape Plan – Lower Ground Level, the note referring to the
              temporary construction access and the associated blue line is to be removed;
         e.   MB_12PR_41 – Lower Ground Level Planting Plan, the note referring to the
              temporary construction access and the associated blue line is to be removed. All
              trees shown in red signifying they are to be removed from the road reserve are
              to be shown black signifying they are to be retained. The notes are to be removed
              and replaced with a note that states – All work on the subject site is be undertaken
              strictly in accordance with the approved Tree Protection Plan, Development
              Permit for Operational Works (Landscaping), Construction Management Plan
              and conditions of approval;
         f.   MB_12PR_42 – Lower Ground Level Structural Plan, the note referring to the
              temporary construction access and the associated blue line is to be removed. All
              trees shown in red signifying they are to be removed from the road reserve are
              to be shown black signifying they are to be retained;
         g.   MB_12PR_50 – Tree Protection Plan, the blue line which refers to the temporary
              construction access is to be removed from the plan.
    3.   The north western edge of the deck is to be located not less than 1m from the property
         boundary adjoining Park Road, and located not less than 2.6m from the north eastern
         boundary, and not less than 5.3m from the south western boundary, as shown on the
         approved plans of development.
    4.   The deck is to be designed so that all piers are located clear of the Tree Protection
         Zone (TPZ) of the following trees 26, 87, 177 and 181, as shown on Drawing No.
         MB_12PR_50 – Tree Protection Plan. No works or access to the TPZ of these trees is
         permitted without approval from the Council or its arborist. Tree number 184, being
         Ficus macrophylla has been removed and can be deleted from the approved plans,
         with any references to this tree deleted from the associated management plans
         referred to in the conditions.
    5.   The Appellant is to amend the Tree Protection Plan, Revision A, dated 11 August 2017
         to address the following:
         a.   the location and size of any scaffolding that is to be erected for the construction
              of the deck in relation to the Tree Protection Zone (TPZ);
         b.   details of the work required (if any) to be undertaken within the Tree Protection
              Zone (TPZ), having regard to the intent of the Tree Protection Plan, to prevent
              any damage being caused to the trees identified in the plan;

                                                                                    Page 9 of 19

Section 10

ORDINARY MEETING MINUTES                                                    21 SEPTEMBER 2017


          c.   remove all reference to removal of trees. Reference to any works within the TPZ
               or access through a TPZ to be stated as only permitted in accordance with the
               prior approval of the Council or its arborist;
          d.   the TPZ shall be protected as per the requirements of AS 4970 – 2009, including
               the use of fences to prevent entry into the TPZ, and composted mulches to
               minimise soil and root damage; and
          e.   the Tree Protection Plan is to outline the specific tree procedures (i.e.
               dimensional data, species and methods for protection and minimization of
               detrimental effects) to be compliant with AS 4970-2009. The document should
               contain the methodology for pile installation, grouting and capping processes.
    6.    The proposed deck and terrace area is to be constructed of light weight building
          elements including a timber decking system, 1m high balustrading with stainless steel
          wire infill, supported on a suspended steel structure, with the retaining walls being
          stone cladded, in accordance with the approved plans of development.
    7.    The 1m setback area and the area beneath the deck, shall be densely landscaped to
          screen the deck from view off site. The development is to be landscaped generally in
          accordance with Drawing No. MB_12PR_40 – Landscape Plan Lower Ground Level
          and Drawing No. MB_12PR_41 – Lower Ground Level Planting Plan. The applicant is
          required to obtain a development permit for operation works (landscaping) prior to the
          removal of any vegetation from the site area affected by the development.
    8.    Security in the form of a cash bond or trading bank guarantee to the sum of $10,000
          must be submitted to Council, to secure performance of all conditions of this approval,
          prior to the issue of a development permit for operational work (landscaping). The cash
          bond or trading bank guarantee will be returned on performance of the conditions of
          approval less any costs incurred by Council in respect of enforcing performance of this
          permit. Council reserves the right to call upon the bond or guaranteed sum to effect
          compliance with conditions.
    9.    The works must comply with the terms of Easements A & B on RP 177551 located
          within the subject land and 9A Allambi Rise, Noosa Heads.
    10.   All construction access is to be obtained from Allambi Rise via the existing easement
          subject to the following exceptions:
          a.   a crane may be used for delivering prefabricated materials and the pier digging
               machine to the site. The use of the crane in Park Road is to occur on two (2)
               separate days only, first for the delivery of the pier digging machine and any
               prefabricated materials, the second to retrieve the pier digging machine and
               provide any further prefabricated materials as required;
          b.   traffic control is to be provided for the use of the crane in Park Road, in
               accordance with the Appellant’s Traffic Management Plan, prepared by Evolution
               Traffic Control, Drawing No. 142510, Revision 00, dated 16 March 2017;
          c.   access from Park Road to the site is permitted for the purpose of a concrete
               pumping pipe to be located at the base of the rock retaining wall on the boundary
               of 10 Park Road, laid upon a composted wood chip mulch 600mm wide and
               150mm thick. Any mulch contaminated by concrete or wastes shall be removed
               from the site. Any remaining clean mulch may be left in situ and spread to 50mm
               thickness; and
          d.   the Appellant is able to use the driveway at 10 Park Road for the removal of
               waste material from the site. All waste from the site is to be loaded into the vehicle
               parked in the driveway from within 10 Park Road and not by using the road
               reserve.



                                                                                     Page 10 of 19

Section 11

ORDINARY MEETING MINUTES                                                    21 SEPTEMBER 2017


     11.   The works must be carried out in accordance with an approved Construction
           Management Plan for the development. The Construction Management Plan dated 14th
           August 2017 is to be amended to address the conditions of approval to the reasonable
           satisfaction of the Council. The Appellant shall submit an amended Construction
           Management Plan for approval with the development application for operational works
           (landscaping).
     12.   The Appellant shall meet the reasonable costs of inspection by the Council’s arborist
           of the location of the footings for the deck which shall be to his reasonable satisfaction
           prior to the work proceeding. The Appellant shall also meet the Council’s reasonable
           costs of its arborist inspecting the works to ensure compliance with the conditions of
           approval.
     13.   No trees are to be removed from the site other than those shown in red on the approved
           plans signifying they are to be removed. No trees are to be removed from the road
           reserve as part of the development.




11   OPW16/0016 - PLANNING &
     ENVIRONMENT COURT APPEAL 281/2017 REFUSAL OF DEVELOPMENT PERMIT FOR
     OPERATIONAL WORKS - PRESCRIBED TIDAL WORKS SITUATED AT 2 PARKYN
     COURT, TEWANTIN
     Item not dealt with by Planning & Environment Committee.                Referred to General
     Committee for consideration.
     Reason for referral – Significance of issue.




                                                                                     Page 11 of 19

Section 12

ORDINARY MEETING MINUTES                                                     21 SEPTEMBER 2017


SERVICES & ORGANISATION COMMITTEE RECOMMENDATIONS
12 SEPTEMBER 2017 – Crs Frank Pardon (Chair), Tony Wellington & Frank Wilkie
Apology: Cr Jess Glasgow
Other Councillors in attendance: Crs Ingrid Jackson and Brian Stockwell


The following Recommendations from the Services & Organisation Committee were
adopted without discussion or further amendment.
Council Resolution
Moved:            Cr Stockwell
Seconded:         Cr Pardon
The Services & Organisation Committee recommendations dated 12 September 2017 be adopted.
                                                                                             Carried.



1    COUNCIL MEETING SCHEDULE 2018
     That Council note the report by the Personal Assistant to the CEO to the Services &
     Organisation Committee Meeting dated 12 September 2017 and approve the Council
     meeting dates for 2018 as set out in Attachment 1 to the report.


2    STRATEGIC ASSET MANAGEMENT PLAN
     That Council note the report by the Asset Planning Manager to the Services & Organisation
     Committee Meeting dated 12 September 2016 and adopt the Strategic Asset Management
     Plan (as provided at Attachment 1 to the report) with an addition to the list of major assets to
     include landholdings and Bushland Reserves in continuing with the implementation of the
     Asset Management Improvement Plan (roadmap).


3    1718T021 ROAD SURFACING AND REHABILITATION - TENDER ACCEPTANCE
     That Council note the report by the Civil Operations Technical Officer to the Services and
     Organisation Committee Meeting dated 12 September 2017 and:
     A.     Award tender 1718T021 Road Surfacing and Rehabilitation to the following
            contractors:
            1.    Portion A – Asphalt Surfacing, Rehabilitation & Construction Programme: Allroad
                  Surfaces Pty Ltd
            2.    Portion B – Mill and Fill Pavement Repairs: Allen’s Asphalt Pty Ltd, Allroad
                  Surfaces, Downer EDI Works Pty Ltd, RPQ North Coast Pty Ltd and Tropic
                  Asphalt Pty Ltd.
            3.    Portion C – Bitumen Sealing: RPQ North Coast Pty Ltd; and
     B.     Award the Contracts for an initial term of up to three (3) years, with an option to extend
            for two (2) further periods of up to twelve (12) months each. The option to extend will
            be at Council’s discretion and subject to the Contractor’s demonstrated ability to meet
            the requirements under the Contract.




                                                                                      Page 12 of 19

Section 13

ORDINARY MEETING MINUTES                                                21 SEPTEMBER 2017


4   INCLUSION OF LAKE COOROIBAH IN GARDEN WASTE RECYCLING AREA
    That Council note the report by the Manager Waste and Environmental Health to the Services
    & Organisation Committee Meeting dated 12 September 2017 and
    A.   Include the Lake Cooroibah urban area, as defined in Attachment 1 to the report, as
         an area where Council will provide a garden waste recycling bin to residents, serviced
         fortnightly; and
    B.   Advise owners of the proposed service and invite exemptions from service in
         accordance with the current garden waste service policy, prior to delivery of bins and
         commencement of service.

5   NOOSA RESULTS FOR 2016 RURAL AND REGIONAL WELLBEING SURVEY
    That Council note the report by the Community Development Manager to the Services &
    Organisation Committee Meeting dated 12 September 2017 and the results for Noosa in the
    University of Canberra’s Rural and Regional Wellbeing Survey November 2016.


6   JULY 2017 RATE LEVY OVERVIEW
    That Council note the report by the Manager Revenue Services to the Planning &
    Organisation Committee Meeting dated 12 September 2017 providing an overview of the
    July 2017 rate levy.




                                                                                Page 13 of 19

Section 14

ORDINARY MEETING MINUTES                                                   21 SEPTEMBER 2017


GENERAL COMMITTEE RECOMMENDATIONS
18 SEPTEMBER 2017 – Crs. Frank Wilkie (Chair), Ingrid Jackson, Joe Jurisevic, Frank
Pardon, Brian Stockwell and Tony Wellington.
Apology: Cr Jess Glasgow


The following Recommendations from the General Committee were adopted without
discussion or further amendment.
Council Resolution
Moved:           Cr Jackson
Seconded:        Cr Wilkie
The General Committee recommendations dated 18 September 2017 be adopted.
                                                                                         Carried.




1    MCU17/0025 & OPW17/0095 – DEVELOPMENT APPLICATION FOR MATERIAL
     CHANGE OF USE FOR INDUSTRIAL BUSINESS TYPE 1 WAREHOUSE (SELF
     STORAGE FACILITY), OPERATIONAL WORKS (ADVERTISING DEVICES) AT 62 AND
     64-66 RENE STREET, NOOSAVILLE
     That Council note the report by the Development Planner to the Planning & Environment
     Committee Meeting dated 12 September 2017 regarding Application No. MCU17/0025 &
     OPW17/0095 for a Development Permit for Material Change of Use for Industrial Business
     Type 1 Warehouse (Self-Storage Facility) and Development Permit for Operational Works
     (Advertising Devices) situated at 62 and 64-66 Rene Street, Noosaville and:
     A.     Approve the application in accordance with the conditions contained in the Planning &
            Environment Committee Agenda dated 12 September 2017.
     B.     Agree to the use of the existing lane between 62 and 64-66 Rene Street for access
            purposes for the development.




2    51994.1353.01 REQUEST TO CHANGE DEVELOPMENT APPROVAL FOR A
     RESTAURANT AND OUTDOOR DINING AREA FOR 5/50 HASTINGS STREET, NOOSA
     HEADS
     That Council note the report by the Coordinator Planning to the Planning & Environment
     Committee Meeting dated 12 September 2017 regarding Application No. 51994.1353.01 for
     a Development Permit for Restaurant and Outdoor Dining Area, situated at 5/50 Hastings
     Street Noosa Heads and:
     A.     Defer consideration of the application to allow the applicant to provide amended plans
            reducing the proposed site cover and improving the proposed addition’s presentation
            to Hastings Street; and
     B.     Delegate the matter to Council officers to decide where the amended plans
            satisfactorily address the issues raised.




                                                                                   Page 14 of 19

Section 15

ORDINARY MEETING MINUTES                                                    21 SEPTEMBER 2017


3   OPW16/0016 – PLANNING & ENVIRONMENT COURT APPEAL 281/2017 REFUSAL OF
    DEVELOPMENT PERMIT FOR OPERATIONAL WORKS – PRESCRIBED TIDAL WORKS
    SITUATED AT 2 PARKYN COURT, TEWANTIN
    That Council note the report by the Manager, Development Assessment to the Planning &
    Environment Committee Meeting dated 12 September 2017 regarding Planning &
    Environment Court Appeal 281/2017 and agree to settle the appeal generally in accordance
    with the following conditions:
         Approved Plans
    1.   Development undertaken in accordance with this approval must generally comply with
         the approved plans of development. The approved plans are listed in the following table
         unless otherwise amended by these conditions.

           Plan No.    Rev.   Plan/Document Name                                  Date

           4901-SK3    E      Indicative New Deck Layout         prepared    by   14 July 2017
                              International Marina Consultants

           4901-301    A      General Arrangement and Elevation 5m Option         4 August 2017

           4901-302           Elevation and Sections 5m Option                    4 August 2017

           3D View 1          Proposed New Northern Deck Extension at Noosa       14 August 2017
                              Marina, Tewantin. Qld. - Artist Impression

           3D View 2          Proposed New Northern Deck Extension at Noosa       14 August 2017
                              Marina, Tewantin. Qld. - Artist Impression

         Deck Extension Design
    2.   The deck extension must be constructed of materials as depicted on the 3D View 1
         and 2 prepared by Peter Morrison and dated 14 August 2017 including open and
         transparent balustrades with timber post uprights, timber decking; and timber ramps
         and approaches.
         Prior to Commencement of Works
    3.   All necessary State government approvals relating to this development must be
         obtained prior to any works commencing on the site.
    4.   A complete set of amended structural design plans, duly signed by the consultant
         Registered Professional Engineer of Queensland (RPEQ) must be provided to
         Council’s Engineering Officer Construction at the “pre start” meeting
    5.   A site control and/or compliance bond of $5,000 is to be submitted to Council prior to
         the pre-start meeting. The pre-start meeting will only be held once Council's
         Construction Engineering Officer has confirmation that the bond monies have been
         received by Council.
         The bond will be refunded less any costs incurred by Council in ensuring compliance
         with these conditions or any additional inspections incurred for substandard work or
         work undertaken not in accordance with this permit.
    6.   All necessary approvals from external service providers (eg Unitywater) and external
         parties on which the development works are proposed have been obtained and a copy
         supplied to Council.
    7.   A condition report including photographs of the frontage of the site must be completed
         and submitted to council at the prestart meeting / prior to any works commencing.



                                                                                   Page 15 of 19

Section 16

ORDINARY MEETING MINUTES                                                    21 SEPTEMBER 2017


    8.    Certificates demonstrating currency of public liability insurance and works insurance
          covering the works must be submitted to Council at the prestart meeting.
    9.    Council must be contacted at least 5 working days prior to any works commencing to
          organise a prestart. The contact number to arrange a pre-start meeting is 5329 6245.
          The pre-start meeting must include the relevant parties for the following aspects of the
          works:
          a.    Civil engineering works;
          b.    Other relevant parties
    10.   A Construction Management Plan must be submitted to Council at least 5 working days
          prior to the pre-start meeting and must specifically address the following:
          a.    Traffic Management during all aspects of the construct phase including:
                i.     A Traffic Management Control Plan in accordance with Manual of Uniform
                       Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
                       control measures prior to construction
                ii.    Maintenance of safe pedestrian access across the frontage of the site both
                       during daily construction and after daily construction has ceased
                iii.   Proposed fencing to the site during the construction phase of the
                       development
                iv.    Adequate parking arrangements for construction workers
                v.     No queuing of trucks is permitted on residential streets, especially prior to
                       7.00am. Further parked trucks must have engines turned off
          b.    Works programme identifying key components of the works and their respective
                durations
          c.    Establishment of a communication protocol with the general public, adjoining
                owners, emergency services and local businesses to advise of agreed
                construction times, impacts on traffic and services and other relevant issues
          d.    identification of complaint management procedures including:
                i.     contact details for the on-site manager
                ii.    dispute resolution procedures
          During Construction
    11.   The developer must meet any costs to repair damage to any Council asset during
          construction, where damage is a result of the development works. Damage to assets
          must be repaired immediately where it creates a hazard to the community. In
          circumstances where the damage does not create a hazard to the community, it must
          be repaired immediately on completion of the works associated with the development.
    12.   All works must be supervised by a Registered Professional Engineer of Queensland
          (RPEQ) who is independent of the Developer and Principal Contractor, and they must
          certify that all works conform to the permit.
    13.   Safe pedestrian access on all streets in the vicinity of the development must be
          maintained at all times. Should footpath/road closures be necessary to carry out
          construction works, Council must be notified prior to the proposed closure and all
          requirements complied with.
    14.   All structures associated with the boardwalk must be constructed wholly within the
          approved area.



                                                                                    Page 16 of 19

Section 17

ORDINARY MEETING MINUTES                                                     21 SEPTEMBER 2017


    15.   Structures must be designed and constructed such that they are free standing within
          the waterway and are not connected to or behind the revetment wall or rock wall.
    16.   All structures must have no detrimental effects on stormwater drains and/or
          easements.
    17.   Lighting associated with the use must be designed, installed, operated, and maintained
          in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor
          Lighting.
    18.   Boat repair activities are not permitted on site.
    19.   Wastewater and sullage must only be disposed of at approved pumpout facilities.
    20.   Any mooring facility must not be utilised for live-aboard purposes.
    21.   Any construction and post construction activity is not to impact on the condition of the
          waterway, and is to be conducted so as not to breach the Environmental Protection Act
          EPA (1994) and the Environmental Protection (Water) Policy 2009.
    22.   Certification by a Registered Professional Engineer of Queensland that states that the
          boardwalk is constructed in accordance with best practice methods and is structurally
          sound must be submitted to Council prior to the return of any bond monies held by
          Council. This certification must be submitted to Council within three (3) months of the
          completion of the works. A final inspection and approval of the structure by Council’s
          Inspector is also required. Please contact Council’s Planning Assessment Section
          (Development Audit & Response Officer 0428738563) to arrange the inspection.
    23.   This approval lapses where the construction of the boardwalk has not commenced
          within two (2) years of the date of issue of the approval, unless application is made and
          approved by Council for an extension.
          Environment
    24.   Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994)
          must not be released from the site or to waters within the site, or be likely to be released
          should rainfall occur, unless all reasonable and practicable measures are taken to
          prevent or minimise the release and concentration of contamination.
          Damage to Services and Assets
    25.   Any damage caused to existing services and assets as a result of the development
          works must be repaired at no cost to the asset owner at the following times:
          a.    where the damage would cause a hazard to pedestrian or vehicle safety,
                immediately; or
          b.    where otherwise, upon completion of the works associated with the development.
          Any repair work which proposes to alter the alignment or level of existing services and
          assets must first be referred to the relevant service authority for approval.
          After Construction
    26.   After completion, the proposed works must be maintained in a sound state of repair in
          accordance with the approved plans.
    27.   The approval of the development does not approve or authorise any use of the
          boardwalk for commercial purposes including but not limited to outdoor dining, wedding
          ceremonies/receptions, markets, display or storage of goods etc.
    28.   The balustrading shown on the approved plans must be constructed and maintained
          at all times to prevent and discourage adjacent tenancies encroaching on to the deck.
    29.   The deck must be unroofed, with no umbrellas, sails or the like erected or constructed.
    30.   The deck must be available to the public for recreational use including fishing.

                                                                                      Page 17 of 19

Section 18

ORDINARY MEETING MINUTES                                               21 SEPTEMBER 2017


4   QUEENSLAND ENVIRONMENTAL PROTECTION POLICY CHANGES CONSULTATION
    That Council note the report by the Environment Officer to the General Committee Meeting
    dated 18 September 2017 regarding proposed changes to the Queensland Environmental
    Protection Policy and agree to make a submission to the Department of Environment and
    Heritage Protection as outlined in Section 6 of this report.



5   ZERO EMISSIONS NOOSA ORGANISATIONAL STRATEGY
    That Council note the report by the Carbon Reduction Project Officer to the General
    Committee Meeting dated 18 September 2017 providing a summary of the activities
    undertaken in accordance with Council’s Zero Emissions Noosa Organisational Strategy.



6   FINANCIAL PERFORMANCE REPORT - AUGUST 2017
    That Council note the report by the Manager Financial Services to the General Committee
    Meeting dated 18 September 2017 providing results of August 2017 financial performance
    against budget.



7   1617T130 PEREGIAN BEACH DIGITAL HUB - TENDER ACCEPTANCE
    That Council note the report by the Economic Development Manager to the General
    Committee Meeting dated 18 September 2017 regarding tender 1617T130 for the provision
    of Management Services – Peregian Beach Digital Hub and:
    A.   Notify tender submitters that a decision on tender 1617T130 is on hold while Noosa
         Council further considers the business case of the Peregian Digital Hub project; and
    B.   Request the CEO to arrange for advice to be provided to Council on strategies to meet
         Council’s broad intentions for the Peregian Digital Hub.




                                                                               Page 18 of 19

Section 19

ORDINARY MEETING MINUTES                                          21 SEPTEMBER 2017


7    ORDINARY MEETING REPORTS

     Nil.




8    CLOSED SESSION

     Nil.




9    NEXT MEETING

     The next Ordinary Meeting will be held on 19 October 2017 at the Council Chambers,
     9 Pelican Street, Tewantin commencing at 6pm.




10   MEETING CLOSURE

     The meeting closed at 6.07pm.




                                                                          Page 19 of 19

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.