ORDINARY MEETING MINUTES 21 SEPTEMBER 2017
Building Appearance
6. The development must be finished in accordance with the external building
colours as detailed on plan number DA6.2, prepared by Peter Hull and dated
11/10/2016.
7. Roof materials must be non-reflective and designed with colours and styles to
minimise the visual impact of the development.
Landscaping
8. A minimum of 20% of the site must be retained as soft landscaping.
9. Existing trees on the site and within road reserves must be retained.
10. Three street trees with a pot size of 45 litres and of native, endemic species with
a mature height of 4 metres must be planted on the road reserve in front of the
wall of the pool to screen the excessive wall height.
11. The pond located at the entrance stairways of the dwelling must be converted to
a garden and consist of native, endemic species.
12. All environmental weeds, including Singapore Daisy, must be eradicated from
the road reserve and replaced with native plants
B. Include the following property note:
1. The driveway for 35 Seaview Terrace, Sunshine Beach is a non-standard
driveway and is unsuitable for low or long vehicles to access the site.
7 AMENITY & AESTHETIC RESOLUTION
That Council note the report by the Manager, Development Assessment to the Planning &
Environment Committee Meeting dated 12 September 2017 regarding Council’s amenity &
aesthetic resolution and:
A. Note that amendments made to the Sustainable Planning Act 2009 and Planning Act
2016 have restored Council’s ability to effectively regulate building works and enforce
locally important matters; and
B. Resolve to discontinue acting as a concurrence agency in the circumstances set out in
Council’s resolutions of 18 August 2016 as amended by the resolution of 20 August
2016 with respect to Schedule 7, Table 1 item 17 of the Sustainable Planning
Regulation 2009.
8 LOCAL GOVERNMENT INFRASTRUCTURE PLAN (SOW COSTS & NETWORK
DEMANDS)
That Council note the report by the Infrastructure Assessment Coordinator to the Planning &
Environment Committee Meeting dated 12 September 2017 regarding the remaining
requirements for the Schedule of Works (SOW) Model for the new Local Government
Infrastructure Plan (LGIP) under The Noosa Plan 2006 and approve:
A. The methodology used to determine existing trunk infrastructure network items from
Council’s Geographic Information System (GIS) and current replacement costs
obtained from Council’s Financial Asset Register;
B. The Generic Land Valuation prepared by CBRE Valuations Pty Limited dated February
2012 provided in Attachment 1 to the report and indexed to the LGIP June 2014 base
date as the basis for applying a uniform generic land cost in the Schedule of Works
Model (SOW) for all existing and future land;
Page 7 of 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.