Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Appendix D - Sales Office Approval

Attached to the e-mail Commercial Business Type 2 Medical (Doctor's Practice) - MCU18/0195.

of 16

Page text read automatically using OCR, there may be inaccuracies

Noosa Council documents


                                                                                                                  SDA-0116-027230




                     Our reference:                     SDA-0116-027230
                     Council reference:                 MCU15/0119


                     Attachment 1—Conditions to be imposed


                     No.         Conditions                                                              Condition timing
                     Development Permit – Material Change of Use
                     Schedule 7, Table 3, Item 1 - State-controlled road —Pursuant to section 255D of the Sustainable
                     Planning Act 2009, the chief executive administering the Act nominates the Director-General of
                     Department of Transport and Main Roads to be the assessing authority for the development to
                     which this development approval relates for the administration and enforcement of any matter
                     relating to the following condition(s):
                     1.          The development must be carried out generally in accordance             Prior to the
                                 with the following plans:                                               commencement of
                                                Site Plan, prepared by Palm Lake Works, dated 21        use and to be
                                                 October 2015, Drawing no. CO-SO-001, Sheet 01/02,       maintained at all
                                                 Revision A.                                             times.


                     2.          (a) Stormwater management of the development must ensure no             (a) At all times.
                                 worsening or actionable nuisance to the State-controlled road.


                                 (b) Any works on the land must not:                                     (b) At all times.
                                    i.   Create any new discharge points for stormwater runoff
                                                 onto the state-controlled road;
                                       ii.       Interfere with and/or cause damage to the existing
                                                 stormwater drainage on the state-controlled road;
                                   iii.          Surcharge any existing culvert or drain on the state-
                                                 controlled road;
                                   iv.           Reduce the quality of stormwater discharge onto the
                                                 state-controlled road.




                     Department of Infrastructure, Local Government and Planning                                    Page 3
Document Set ID: 20038632
Version: 1, Version Date: 14/03/2016                                                                          Print Date: 14 March 2016, 4:33 PM

Log in to download the original (Appendix D - Sales Office Approval.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.