Appendix D - Bushfire Management Plan

of 10

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
   BUSHFIRE MANAGEMENT REPORT

FOR A MINOR CHANGE TO THE APPROVAL
  AT 191 HOLLETT ROAD, NOOSAVILLE


                 FOR

       MR J. & MRS K. HOFMANN




                  by

  L.S. Hawkes, B.Sc.(For), MIFA, MRFAQ
     The Consultancy Bureau Pty Ltd
           27 November 2019
Log in to download the original file

Appendix D - Bushfire Management Plan.pdf · 4.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 9 pages

Page 2

Report on Bushfire Management Report for a minor                           Mr J. & Mrs K. Hofmann
change to the Approval at 191 Hollett Road,
Noosaville


1. Introduction
The Hofmann’s have proposed a minor change to the Development Approval granted 5
July 2013 pursuant to the judgement made by the P&E Court Appeal No. 344 of 2009.


This report deals with the bushfire implications of this minor change.




2. Description of the Changes
The proposed changes are summarised as:-
    (1)     South West Corner
            A reduction in lots from 9 to 2 and physical shrinkage to about 2ha in the south
            west corner. The previously agreed 4 metre perimeter firebreak and fire trail
            remain.
    (2)     Southern Section West of Access Road
            This area has been reduced in size and lot number from 4 to 3. The perimeter 4
            metre separation and fire trail is retained.
    (3)     North of the Power Line
            This area has been reduced from 7 lots to 4 lots. The perimeter 4 metre
            separation and fire trail are retained. The capacity to link to the existing
            management access to the north out and under Walter Hay Drive also remains.
            This access is for emergency use only and the existing access out onto Walter
            Hay Drive provide excellent visibility for this very occasional use.




3. Implications of the Changes for Bushfire Management
   •   The intent of perimeter access and separation has not changed.
   •   The length of fire line is reduced and this is less of a burden in the case of a
       suppression event.
   •   The location of residences to be 30 metres from certain vegetation is unchanged,
       desirable and achievable.




  19-003 Report 27 November 2019                                    Commercial-in-Confidence
                                                                                     Page 1

Page 3

Report on Bushfire Management Report for a minor                           Mr J. & Mrs K. Hofmann
change to the Approval at 191 Hollett Road,
Noosaville

   •   The changes will not alter the capacity to achieve a construction standard of BAL 29
       or less under AS3959.
   •   Each lot will have 5,000 litres of water exclusively available for firefighting. This is
       unchanged.
   •   The maintenance of fuel loads in the large Lot 40 will remain as an unchanged
       requirement (i.e. maintain fuel loads below 10 tonne/ha).


The compliance with Council’s Bushfire Overlay Code will be enhanced with the reduction
and consolidation of lots.




4. Conclusion
Overall, the proposed changes are minor in configuration and provide an enhanced
Bushfire Management and protection outcome.




L.S. Hawkes, B.Sc.(For), MIFA, MRFAQ
Senior Associate
(CV attached)




  19-003 Report 27 November 2019                                    Commercial-in-Confidence
                                                                                     Page 2

Page 4

PROPERTY DESCRIPTION                                                                                                                                                                                                                                                                                                                                          STATISTICS            STAGE 1 STAGE 2 STAGE 3 TOTAL
LOT 53 ON SP163571                                                                                                                                                                                                                                                                                                                                            NO. OF LOTS
PARISH OF TEWANTIN/WEYBA                                                                                                                                                                                                                                                                                                                                        LOW DENSITY            17         22       --     39
COUNTY OF MARCH                                                                                                                                                                                                                                                                                                                                                 RURAL PURSUIT           --         --      1       1
TOTAL AREA 110.0 ha                                                                                                                                                                                                                                                                                                                                             TOTAL                  17         22       1      40
NOTES                                                                                                                                                                                                                                                                                                                                                         LENGTH OF NEW
                                                                                                                                                                                                                                                                                                                                                                20m ROAD              470m      970m       --   1440m
(1) This plan was prepared for the purpose and exclusive use of                                                                                                                                                                                                                                                                                               AREA OF PARK          38.12ha 11.12ha 10.204ha 59.444ha
J & K HOFMANN to accompany an application to SUNSHINE COAST
REGIONAL COUNCIL for a Development Permit for Material Change of                                                                                                                                                                                                                                                                                              TOTAL AREA            46.93ha 30.14ha 32.93ha 110.0ha
Use of the land and for approval to Reconfigure the land described in                                                                                                                                                                                                                                                                                         TOTAL NETT AREA OF LOTS (excluding lots 32 & 40) 16.96ha
the plan and is not to be used for any other purpose or by any other                                                                                                                                                                                                                                                                                          AVERAGE LOT SIZE (excluding lots 32 & 40)        0.446ha
person or corporation.
JFP URBAN CONSULTANTS PTY LTD accepts no responsibility for any loss
or damage suffered howsoever arising to any person or corporation
who may use or rely on this plan in contravention to the terms of this
clause or clauses 2, 3 or 4 hereof.

(2) The contours on this plan were derived from CARDNO's plan 7396/09
and are suitable only for the purpose of this application. The accuracy of
the contours has not been verified and no reliance should be placed
upon such contours for any purpose other than for the purpose of this
application.

(3) The dimensions, areas, size and location of improvements, flood
information (if shown) and number of lots shown on this plan are
approximate only and may vary.

(4) This plan may not be reproduced unless these notes are included.


               LEGEND
                STAGING

               30m MANDATORY BUILDING SETBACK

                BUILDING ENVELOPE (1600m² max.)
                                                                                                                                                                                                            53
                                                                                                                                                                                                         SP163571
               FIRE TRAIL (12m WIDE)

               RL 3.0

               ENVIRONMENTAL ENHANCEMENT (NP2016)

               ENVIRONMENTAL PROTECTION (NP2016)
                                                                                                                                                                                                                                                                                                                                                                     53
                                                                                                                                                                                                                                                                                                                                                                  SP163571

               FLOOD HAZARD OVERLAY (NP2016)

               RIPARIAN BUFFER AREA (NP2016)

               STREAMS AND RIVERS (NP2016)
                                                                                                                                                                                                                                                                                                                                             3
               WATERCOURSE AND DRAINAGE (NP2016)                                                                                               1                                                                                                                    2
               CATEGORY A OR B AREA CONTAINING
               ENDANGERED REGIONAL ECOSYSTEMS
               CATEGORY A OR B AREA CONTAINING
               OF CONCERN REGIONAL ECOSYSTEMS
               CATEGORY A OR B AREA THAT IS
               LEAST CONCERN REGIONAL ECOSYSTEM

               NON GQAL

               FRAGMENTED GQAL

               NON GQAL DUE TO
               WETNESS LIMITATIONS
               POSSIBLE GQAL SUBJECT
               TO LOW WATER STORE
               EMERGENCY ACCESS FOR FIREFIGHTING
               PURPOSES FROM WALTER HAY DRIVE
               EXISTING EMERGENCY MANAGEMENT TRAIL


                                                                                                                    NORTH:       SCALE:                                                                                       ISSUES:                                                             TITLE:                                                                                                                                 DETAILS:
                                                                                                                                                                                                                                                                                                                                                                                                                            PROJECT:                 STAGE:       PLAN:          ISSUE:
                                                                                                                                 SCALE: @ A1 1:2500 @ A3 1:5000
                                                                                                                             N
                                                                                                                                                                                                                                                                                                                                                                                                                             M1775 00 13                                          E
                                         BRISBANE - SUNSHINE COAST - CENTRAL QLD
                                         SUNSHINE COAST
                                                                                             PLANNERS
                                                                                             URBAN DESIGNERS
                                                                                                                                 0            50          100           150          200          250           300
                                                                                                                                                                                                            metres            E         LAYOUT AMENDED          16-09-19   TJM       RECONFIGURATION PLAN                                                                                                                    SHEET:

                                                                                                                                                                                                                                                                                                                                                                                                                            1 OF 6
                                                                                                                                                                                                                                                                                     J & K HOFMANN
                                         Tower 1, Level 2, 55 Plaza Parade,                                                      THIS SCALE SHOWN IS ORIGINAL DRAWING SCALE - (A1 SIZE)                                       D         LAYOUT AMENDED          11-09-19   TJM
                                                                                             SURVEYORS
                                         Maroochydore, Qld 4558                                                                  DO NOT SCALE FROM THIS DRAWING - USE ONLY DIMENSIONS PROVIDED - IF IN DOUBT PLEASE ENQUIRE   C         BLE'S AMENDED           09-08-19   DWW                                                                                                                                              FILE:
                                         P 07 5450 3900 W www.jfp.com.au                     ENGINEERS
                                                                                                                                                                                                                                                                                     HOLLETT ROAD, NOOSAVILLE
                                                                                                                                                                                                                              B         BLE'S AMENDED & ADDED   07-08-19   DWW                                                                                                                                               M1775-13E-RP.dwg
                                                                                                                                 DESIGNED          TJM   CHECKED         GB      DATUM
          CONSULTANTS                     JFP URBAN CONSULTANTS PTY LTD A.C.N. 050 414 045   LANDSCAPE ARCHITECTS                                                                                                             A         ORIGINAL                25-07-19   TJM                                                                                                                                              DATE:
                                                                                                                                 DRAWN             TJM   APPROVED        GB      L.A. SUNSHINE COAST REGIONAL COUNCIL         ISSUE:      DETAILS:              DATE:      INIT:                                                                                                                                            16th September 2019
                                                                                                                                                                                                                                                                               COPYRIGHT © 2019 JFP URBAN CONSULTANTS PTY LTD. THIS DOCUMENT MAY NOT BE COPIED OR TRANSMITTED IN ANY FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE WRITTEN CONSENT OF JFP URBAN CONSULTANTS PTY LTD.

Page 5

PROPERTY DESCRIPTION                                                                                                                                                                                                                                                                                                                                           STATISTICS            STAGE 1 STAGE 2 STAGE 3 TOTAL
LOT 53 ON SP163571                                                                                                                                                                                                                                                                                                                                             NO. OF LOTS
PARISH OF TEWANTIN/WEYBA                                                                                                                                                                                                                                                                                                                                         LOW DENSITY            17         22       --     39
COUNTY OF MARCH                                                                                                                                                                                                                                                                                                                                                  RURAL PURSUIT           --         --      1       1
TOTAL AREA 110.0 ha                                                                                                                                                                                                                                                                                                                                              TOTAL                  17         22       1      40
                                                                                                                                                                                                                                                                                                                                                               LENGTH OF NEW
                                                                                                                                                                                                                                                                                                                                                                 20m ROAD              470m      970m       --  1440m
NOTES                                                                                                                                                                                                                                                                                                                                                          AREA OF PARK          38.12ha 11.12ha 10.204ha 59.444ha
                                                                                                                                                                                                                                                                                                                                                               TOTAL AREA            46.93ha 30.14ha 32.93ha 110.0ha
(1) This plan was prepared for the purpose and exclusive use of
J & K HOFMANN to accompany an application to SUNSHINE COAST                                                                                                                                                                                                                                                                                                    TOTAL NETT AREA OF LOTS (excluding lots 32 & 40) 16.96ha
REGIONAL COUNCIL for a Development Permit for Material Change of                                                                                                                                                                                                                                                                                               AVERAGE LOT SIZE (excluding lots 32 & 40)        0.446ha
Use of the land and for approval to Reconfigure the land described in
the plan and is not to be used for any other purpose or by any other
person or corporation.
JFP URBAN CONSULTANTS PTY LTD accepts no responsibility for any loss
or damage suffered howsoever arising to any person or corporation
who may use or rely on this plan in contravention to the terms of this
clause or clauses 2, 3 or 4 hereof.

(2) The contours on this plan were derived from CARDNO's plan 7396/09
and are suitable only for the purpose of this application. The accuracy of
the contours has not been verified and no reliance should be placed
upon such contours for any purpose other than for the purpose of this
application.

(3) The dimensions, areas, size and location of improvements, flood
information (if shown) and number of lots shown on this plan are
approximate only and may vary.

(4) This plan may not be reproduced unless these notes are included.




               LEGEND
               STAGING                                                                                                                                                                                        53
                                                                                                                                                                                                           SP163571



               30m MANDATORY BUILDING SETBACK

                BUILDING ENVELOPE (1600m² max.)

               FIRE TRAIL (12m WIDE)

               FAUNA CROSSING POINT                                                                                                                                                                                                                                                                                                                                      53
                                                                                                                                                                                                                                                                                                                                                                      SP163571


               STREAMS AND RIVERS (NP2016)

               WATERCOURSE AND DRAINAGE (NP2016)                                                                                                                                                                                                                                                                                                 3
               CATEGORY A OR B AREA CONTAINING
               ENDANGERED REGIONAL ECOSYSTEMS
               CATEGORY A OR B AREA CONTAINING
               OF CONCERN REGIONAL ECOSYSTEMS
                                                                                                                                                   1                                                                                                                    2
               CATEGORY A OR B AREA THAT IS
               LEAST CONCERN REGIONAL ECOSYSTEM
               EMERGENCY ACCESS FOR FIREFIGHTING
               PURPOSES FROM WALTER HAY DRIVE
               EXISTING EMERGENCY MANAGEMENT TRAIL




                                                                                                                    NORTH:       SCALE:                                                                                       ISSUES:                                                              TITLE:                                                                                                                                 DETAILS:
                                                                                                                                                                                                                                                                                                                                                                                                                              PROJECT:                STAGE:       PLAN:           ISSUE:
                                                                                                                             N   SCALE: @ A1 1:2500 @ A3 1:5000                                                                                                                                                                                                                                                               M1775 00 13                                          E
                                         BRISBANE - SUNSHINE COAST - CENTRAL QLD
                                         SUNSHINE COAST
                                                                                             PLANNERS
                                                                                             URBAN DESIGNERS
                                                                                                                                 0            50          100           150          200          250           300
                                                                                                                                                                                                            metres
                                                                                                                                                                                                                              E         LAYOUT AMENDED          16-09-19    TJM       PLAN OF DEVELOPMENT                                                                                                                     SHEET:

                                                                                                                                                                                                                                                                                                                                                                                                                             2 OF 6
                                                                                                                                                                                                                                                                                      J & K HOFMANN
                                         Tower 1, Level 2, 55 Plaza Parade,                                                      THIS SCALE SHOWN IS ORIGINAL DRAWING SCALE - (A1 SIZE)                                       D         LAYOUT AMENDED          11-09-19    TJM
                                                                                             SURVEYORS
                                         Maroochydore, Qld 4558                                                                  DO NOT SCALE FROM THIS DRAWING - USE ONLY DIMENSIONS PROVIDED - IF IN DOUBT PLEASE ENQUIRE   C         BLE'S AMENDED           09-08-19    DWW                                                                                                                                               FILE:
                                         P 07 5450 3900 W www.jfp.com.au                     ENGINEERS
                                                                                                                                                                                                                                                                                      HOLLETT ROAD, NOOSAVILLE
                                                                                                                                                                                                                              B         BLE'S AMENDED & ADDED   07-08-19    DWW                                                                                                                                               M1775-13E-RP.dwg
                                                                                                                                 DESIGNED       TJM     CHECKED          GB     DATUM
          CONSULTANTS                     JFP URBAN CONSULTANTS PTY LTD A.C.N. 050 414 045   LANDSCAPE ARCHITECTS                                                                                                             A         ORIGINAL                25-07-19    TJM                                                                                                                                               DATE:
                                                                                                                                 DRAWN          TJM     APPROVED         GB     L.A. SUNSHINE COAST REGIONAL COUNCIL          ISSUE:      DETAILS:              DATE:       INIT:                                                                                                                                             16th September 2019
                                                                                                                                                                                                                                                                                COPYRIGHT © 2019 JFP URBAN CONSULTANTS PTY LTD. THIS DOCUMENT MAY NOT BE COPIED OR TRANSMITTED IN ANY FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE WRITTEN CONSENT OF JFP URBAN CONSULTANTS PTY LTD.

Page 6

 

THE CONSULTANCY BUREAU

CURRICULUM VITAE
LESLIE HAWKES, SENIOR ASSOCIATE

Qualifications
+ BSc For ANU 1969

Professional Affiliations
« Member of the Institute of Foresters of Australia
+ Justice of the Peace (Qualified)

Areas of Expertise

¢ Land use planning, including the resolution of land use conflicts

¢ Development of community-based management strategies for natural resources,
including forests, bushfire and wildlife

¢ Development of environmental guidelines

« Development and implementation of fire management plans and strategies

+ Resource assessments for native and plantation timber

+ Farm, social and community forestry (including the development of resource materials)

+ Silviculture and management of native rainforest, eucalypt and plantation forests

¢ Forest recreational planning and management of State Forests and National Parks

Relevant Experience

¢ Extensive experience as a Natural Resource Consultant, preparing Reports on

Environmental Performance, Court Appearances as an expert witness, performing forest,
environmental, habitat assessments and Bushfire Plans.

¢ Extensive experience in Queensland, participating in forums and negotiations relating to
land use conflicts, including conflicts between forestry and sugar growing industries.

¢ Sound understanding of the operations of the sugar growing industry and of the
agricultural and grazing sectors, from continuing contact with participants in the industry
and from direct experience as a primary producer.

¢ Appreciation of the constraints and challenges facing the farming sector and individual
farmers from ongoing contacts with the primary production sector, from direct farming
experience, and as a small business proprietor.

The Consultancy Bureau Pty Ltd an 35 010 873 346
Unit 4, 50 Northlink Place Virginia Qld 4014 PO Box 142 Northgate Qld 4013
Phone: 07 3256 8444 Facsimile: 07 3256 8944

Email: [email protected] www.consultancybureau.com.au

 

MANAGEMENT CONSULTANCY SERVICES

Page 7

Curriculum Vitae Les Hawkes, Senior Associate - The Consultancy Bureau Pty Ltd

Work Experience

1992 — present Natural Resource Consultant - The Consultancy Bureau Pty Ltd

Achievements

¢ Provide consultancy services to public and private sector within Queensland on wide range
of ecological assignments including

Prepare Bushfire Management Plans throughout Queensland and present expert
evidence in the courts for Local Authorities and Developers.

Environmental Impact Assessments on large sub division proposals, roads, quarries and
underground cable projects.

Prepare legal reports on environmental performance for Local Authorities and private
developers (court appearance as expert witness).

Review, develop community based management strategies for rural Queensland areas,
e.g. (Western Cypress areas around Roma).

Assist in the review of Environmental Labelling for Forest products in Australia.
Assist in financial auditing for Queensland Government Department.

Major review of habitat of the Mahogany Glider in the Herbert Valley.

1992 - 2007 Small business owner/operator

1992-1995: Party Hire Owner/Operator
1996-2007: Ladder Manufacture and Distribution, Qld and NSW
1998-2007: Wholesale Leather Distribution Company.

1990 - 1992 Manager, Forest Advisory Branch, Queensland Forest Service.

Achievements
¢ Management, development and delivery of information services to keep the public
informed of the intent and the detail of all programs and services of the Queensland Forest
Service.
¢ Co-ordinate and enhance the quality of the rural and urban environment by encouraging

and facilitating the planting, care and retention of trees along with the role rehabilitation of
degraded land by promoting the role of trees and forests in sustainable land management
including assessment of private commercial forest proposals.

+ Developing and producing appropriate awareness campaign along with literature to ensure
the wider community is fully informed on suitable practices on the land.

 

 

 

 

 

 

 

Hawkes CV

THE CONSULTANCY BOREAU
Page 2

Page 8

Curriculum Vitae Les Hawkes, Senior Associate - The Consultancy Bureau Pty Ltd

1985 - 1990 District Forester at Ingham District - Queensland Forest Service

Achievements

« High level negotiations and demonstration of the Department’s management of the
rainforests in North Queensland.

¢ High level of both technical and managerial skills in a senior field position.

4 High degree of expertise in managing the development of tropical forests.

¢ Major resource assessments of all lowland native forest in Ingham region for land use
classification.

¢ Management of a large budget, including financial monitoring and auditing.

« Workforce management and control, including responsibility for planning the downsizing
of the workforce following the cessation of rainforest harvesting.

¢ Establish and manage 10000 ha of exotic pine plantation.

1980-1985 Officer In Charge of the Imbil District - Queensland Forest Service

Achievements

¢

o

«

Management of a 14,000 ha plantation of Hoop Pine which involved:-

- raising 500,000 nursery stock annually.

- Establishment of approximately 250ha of new plantation, annually, silvicultural
maintenance including weeding, pruning and thinning, commercial harvesting of
40,000 cubic metres of thinning and preparation for the imminent harvesting of much
larger volumes of timber of the final crop.

Management of highly productive native hardwood forests for both timber and high use

recreational pursuits including all the Connondale Range area.

Management and workforce control of 120+ staff

1978 - 1980 Marketing Development Officer - Marketing Division - Queensland Forest

Service, Head Office
Achievements
+ Review of pricing systems for the Services forest products.
¢ Investigation and development of operational and environmental guidelines for forestry
activities
+ Review environmental logging guidelines in native forests.

 

 

 

 

 

 

 

THE CONSULTANCY BGREAG

Hawkes CV Page 3

Page 9

Curriculum Vitae Les Hawkes, Senior Associate - The Consultancy Bureau Pty Ltd

1977-1978 Fire Protection Officer for Queensland

Achievements

o Responsible for management to ensure the effective protection of all state forests from fire.

+ Extensive work in pioneering helicopter hazard reduction burning of both native forests
and exotic plantations.

o Developing and running Fire Schools for all Field Officers in Queensland.

1970-1977 Various management positions in the Queensland Forest Service

« Forester in Charge of Native Forest Management Esk Gatton Crows Nest.
« Forester in Charge of Jimna SF. including Native Forest Management of Conondale
Range.

Consultancy Experience

Human Resource Management

¢ Up-sizing and down-sizing of workforces, for example:-
- Increases in plantation establishment, staff from 50 to 120.
- Shut down of Rainforest logging and complete review of all positions in North
Queensland and report on down-sizing.
- Implementation of performance management systems from 1982 - 1992.
- Development of the Queensland wide forestry extension program including budgets,
staff position descriptions, recruitment and placement.

Human Resource Development

« Developing training course and providing Fire Training Schools for Queensland wide Fire
Prevention staff.
« Produced training videos for Farm Forestry, manuals for Farm Forestry, quarterly

corporate publication and computer based Tree Selection System with accompanying book
version for Farm Forestry activities.

Organisational Structures and Functions
@ 1976 Department of Forestry Restructure

@ 1982 Review of roles / responsibilities and reporting systems for Queensland Wide Sub-
Districts.

 

 

 

 

 

=

THE CONSULTANCY B: Ad
Hawkes CV ORE Page 4

 

Page 10

Curriculum Vitae Les Hawkes, Senior Associate - The Consultancy Bureau Pty Ltd

@ 1989

@ 1990

Review of North Queensland - Forestry Structure, Personnel and redundancy needs
following the closure of Rainforest Management.

Develop a state-wide structure for Forest extension including interaction with Land
Care, Integrated Catchment Management and Extension Research.

¢ 1993 Business planning and development of a Hire Equipment business.
@ 1996 Purchase of a Ladder Manufacturing business and implementation of anew factory
system and a changed marketing strategy.
1998 Purchased leather distribution company and implemented change to post a 400%
increase in turnover in 30 months.
Additional Skills
« Considerable involvement with Aboriginal Communities over a 25 year period including -
assistance in developing skills (sawmilling, fire protection, and special native treecrops).
¢ Assistance with employment training schemes especially using unskilled labour.
+ Developing and assisting with problems employing people of diverse cultural
backgrounds.
+ Major team building has included:-

Forest Extension Programme
Up-sizing for new Plantation Programme
Staff morale reviews during and after the Rainforest Logging Debate

Scope of Consultancy Services

¢ Les Hawkes has a strong operational background with excellent interpersonal skills at the
work place. He has extensive experience in feasibility studies and design of projects and
programmes. Les possesses extensive experience in project implementation / with large
workforces and budgets, and develops sound operational plans showing achievement
milestones and required reporting arrangements.

¢ Considerable experience in land use evaluation reporting and conflict resolution.

 

 

 

 

 

 

 

Hawkes CV

THE CONSULTANCY BUREAU
Page 5

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.