Concurrence and Advice Agency Response - Department of Environment & Resource Management · OPW11/0116
Attached to the e-mail Referral Agency Response - Department of Environment & Resource Management.
DERM Permit number: SPCE01881811 A8. Not more than 14 days following the initial notification of an incident, the holder of this development approval must provide written advice of the information supplied in accordance with condition number A7 in addition to: (a) proposed actions to prevent a recurrence of the emergency or incident; (b) outcomes of actions taken at the time to prevent or minimise environmental harm and or environmental nuisance, and (c) the results of any environmental monitoring performed. Notification before commencement AQ. At least 10 business days prior to dredging work commencing, the administering authority must be informed of at least the following: . (a) planned timetable of the dredging for the program/year including proposed staging of dredging activities and hours of operation; (b) the contact details for the person/s made available during the hours of operation who can appropriately address any complaints. Trained / experienced operator(s) A10. The daily operation of dredging, transportation and pollution monitoring equipment or any other equipment used in connection with the dredging operations must be carried out bya person(s) with appropriate experience and/or qualifications to ensure the effective operation _ of the equipment. . Records Ait. All records required by this permit must be kept for five years. At2. The operator must maintain a record of sites where dredging is carried out (specifying the ‘boundaries of the dredged area by GPS coordinates) and the volume of material removed from each site (to the nearest tonne). A13. All records required to be kept by a condition of this development approval must be provided to an authorised person or the administering authority upon request. Maintenance of measures, plant and equipment : A14. The operator must: (a) install all measures, plant and equipment necessary to ensure compliance with the conditions of this development permit; (b) maintain and calibrate such measures, plant and equipment in an efficient condition and keep records of the maintenance; (c) operate such measures, plant and equipment in an efficient manner. Alterations A165. No change, replacement or operation of any plant or equipment is permitted if the change, replacement or operation of the plant or equipment increases, or is likely to substantially increase, the risk of environmental harm above that expressly provided by this development approval. (An example of a substantial increase in the risk of environmental harm is an increase of 10% or more in the quantity of a contaminant to be released into the environment). Page-5 of 12 " 091217 Department of Environment and Resource Management
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Concurrence and Advice Agency Response - Department of Environment & Resource ManagementRelated documentApplication case desk ↗
IC0511NAM0009_SC14225_110621_RAR.pdf - Adobe Acrobat Professional.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.