Council archive · source document
Concurrence and Advice Agency Response - Department of Environment & Resource Management · OPW11/0116
Attached to the e-mail Referral Agency Response - Department of Environment & Resource Management.
DERM Permit number: SPCE01881811 Calibration Al6, All instruments and devices used for the measurement or monitoring of any parameter under any condition of this development approval must be calibrated and appropriately operated and maintained. Nuisance A17. Notwithstanding any other condition of this development approval, this development approval does not authorise any release of contaminants which causes or is likely to cause an environmental nuisance beyond the boundaries of the water allocation area NRS-RE-001. Site Based Management Plan (SBMP) A18, The operator must implement a site based management plan from the commencement of this ERA. The SBMP must identify all causes of environmental harm, including but not limited to the actual and potential release of any contaminants, the nature of the environmental harm and the actions that will be taken to prevent environmental harm being caused. The SBMP must also provide for the review and ‘continual improvement’ in the overall environmental performance of activities to which this approval relates. A19. The SBMP must address the following matters: (a) environmental commitments - a commitment by senior management to achieve specified and relevant environmental goals; (b) identification of environmental issues and potential impacts; (c) control measures for routine operations to minimise likelihood of environmental harm; (d) contingency plans and emergency procedures for non-routine situations (including but not limited to the emergency protocol when spills occur and the amount of neutralising agent to be kept onsite); (e) organisational structure and responsibility; (f) effective communication; (g) monitoring of contaminant releases; (h) conducting environmental impact assessments; (i) staff training; (j) record keeping; and (k) periodic review of environmental performance and continual improvement. A20. The SBMP must be made available to the administering authority when requested. A21. The SBMP must not be implemented or amended in a way that contravenes any condition of this development permit. Equipment A22. Any dredging must be conducted using equipment that is in survey and registered. A23. On completion of the dredging operation or when directed by the administering authority to do so, the dredger shall remove all dredge plant and equipment (including pipes, floats and other equipment used in or in connection with the dredging operations) from the site. End Schedule A - General conditions Page 6 of 12 * 091217 Department of Environment and Resource Management
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Concurrence and Advice Agency Response - Department of Environment & Resource ManagementRelated documentApplication case desk ↗
IC0511NAM0009_SC14225_110621_RAR.pdf - Adobe Acrobat Professional.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.