Council archive · source document
Concurrence and Advice Agency Response - Department of Environment & Resource Management · OPW11/0116
Attached to the e-mail Referral Agency Response - Department of Environment & Resource Management.
DERM Permit number: SPCE01881811 De. DS. D4. D5. All reasonable and practicable measures must be taken to minimise any increase in turbidity of the waters or the release of contaminants as a result of these works to any waters or the bed and banks of any waters. There must be no release of petroleum/oil based or similar typé products from any vessel used jn the dredging operations to any waters. Where sediment control structures are necessary to ensure compliance with the conditions of this development approval, such sediment control structures must be: (a) Installed prior to any works commencing; and (b) Maintained during the time period in which works take place and until rehabilitation works (if any) have been completed; and (c) Any control measures installed in receiving waters may only be removed when water quality monitoring results demonstrate that the removal of such measures will not have any adverse impacts on adjacent water quality. In carrying out this activity, the release of contaminants must: (a) only occur within the permitted areas specified in water allocation area NRS-RE-001 (b) not have any properties, not contain any organisms or other contaminants which are capable of causing environmental harm; and « (c) must not produce any slick or other visible evidence of oil or grease, nor contain visible floating oil, grease, scum, litter or other objectionable matter; and (d) must not produce any discolouration, outside a 200m mixing zone, which adversely affects any environmental value applicable to the receiving waters. (e) sediments identified or potentially containing acid sulphates are managed to avoid exposure to air (i.e. sediments are to remain submerged and not used for beach nourishment) Schedule D - Water - Table 1 Quality Characteristic Limit No visible plume in receiving waters is to extend beyond 200m from any deposition point and\or the dredge operation, to be checked regularly when dredge is in operation. Turbidity Plume (visual) pH (in-situ) Value not to be less than 6.5 or greater than 9.0, to be checked regularly when dredge is in operation. Petroleum products (oil, grease, fuel etc) No visible incidence, to be checked regularly when dredge is in operation. End Schedule D - Water Schedule E - Air E1. The release of noxious or offensive airborne contaminants resulting from the works must not cause a nuisance at any nuisance sensitive or commercial place. Page 8 of 12 * 091217 + . Department of Environment and Resource Management j i i i i
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Concurrence and Advice Agency Response - Department of Environment & Resource ManagementRelated documentApplication case desk ↗
IC0511NAM0009_SC14225_110621_RAR.pdf - Adobe Acrobat Professional.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.