Concurrence and Advice Agency Response - Department of Environment & Resource Management · OPW11/0116
Attached to the e-mail Referral Agency Response - Department of Environment & Resource Management.
Schedule B - Dredging
B1.
B2.
B3.
B4.
BS.
DERM Permit number: SPCE01881811
The only form of dredging to be undertaken as part of this permit is the relocation of clean
sand for the purposes of beach nourishment, backfilling, filling material for Stage 1 works
and for an interim navigation channel.
Disturbance to acid sulphate soils (ASS) is to be avoided as far as practicable, should the
works disturb ASS the works must comply with Instructions for the Treatment and Management
of Acid Sulfate Soils, 2001, Queensland Government, or any updates as they become available.
Dredging works must ensure that no significant stability or hydrological changes to tidal
hydrodynamics, wave or current conditions occur either directly or indirectly in the immediate
area that could induce detrimental impacts on the adjacent coastline or beach profiles.
Material dredged under this permit must remain within the active Noosa River system, this
includes beach nourishment and material placed in underwater containment and dredged
material is not permitted to be stockpiled on land.
The dredge area is to be checked prior to completion of the works and all waste materials
{including anchor blocks and ropes used during the dredging) are removed prior to departure.
End Schedule B - Dredging
Schedule C - Monitoring
C1.
C2.
C3.
C4.
The operator of this development permit must monitor the visual impact of the dredging
activity on the environment by undertaking the following: |
(a) Daily observations and recording of the extent of any turbidity plume caused by }
dredging; and
(b) Daily observations and recording of the period of time the turbidity persists.
In the event that the administering authority requires water quality sampling or dredge material
sampling, all determinations of the quality of the samples must be:
(a) made in accordance with methods prescribed in the latest edition of the Department of
Environment and Resource Management Water Quality Sampling Manual; and
(b) carried out on samples that are representative of the discharge.
The measurement and reporting of any monitoring and\or nuisance levels (air, noise) must be
undertaken by a person or body possessing appropriate experience and qualifications to perform
the required measurements.
If in the opinion of an authorised person, monitoring indicates that the works are a nuisance,
the operator must:
(a) address the complaint including the use of appropriate dispute resolution if required; or
(b) immediately implement abatement measures so that the works do not result in any further
environmental nuisance.
End Schedule C - Monitoring
Schedule D - Water
D1.
The only contaminants permitted to be released to any waters (including the bed or banks of
such waters) are sediments disturbed during dredging and placement.
Page 7 of 12 * 091217 . . Department of Environment and Resource Management
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Concurrence and Advice Agency Response - Department of Environment & Resource ManagementRelated documentApplication case desk ↗
IC0511NAM0009_SC14225_110621_RAR.pdf - Adobe Acrobat Professional.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.