Council archive · source document
Concurrence and Advice Agency Response - Department of Environment & Resource Management · OPW11/0116
Attached to the e-mail Referral Agency Response - Department of Environment & Resource Management.
DERM Permit number: SPCC01881911 CONDITIONS Schedule A - General Limitations of permit At. This development permit authorises the Stage 1 works for a period of 12 months from date of approval that is for erosion protection works within Noosa River on USL adjacent to Lot 114 on Plan MCH839107 indicated in Table 1. Plans & Documents. A2. All works are to be constructed in accordance with the drawings and specifications indicated in Table 1. Plans & Documents provided with the application, or any subsequent endorsed amendments to those plans unless the plan conflicts with a condition of this approval in which case the conditions take precedence. A3. The works must not have any direct or indirect impact upon the environmental values or water quality objectives for the coastal management district of Noosa River. Ad. The chief executive administering the Coastal Protection and Management Act 1995 may order the works to be removed or modified within a reasonable time, if the works have or are likely to have a significant effect on coastal management because the works: ‘(a) create a navigation hazard or other danger to the public; or (b) cause erosion or land degradation; or : (c) are unstable; or . (d) have not been constructed according to the plans (Table 1 Plans and Documents). AS. Should the works result in adverse impacts to the environment or coastal management, the Sunshine Coast Regional Council or its successor is responsible at their expense for rectification works and where necessary and\or the removal of the works causing the impacts. AG. Should the work structures (wall and groynes) associated with these works become damaged or dislodged as a result of vandalism, coastal processes or storm tide inundation, the Sunshine Coast Regional Council or its successor is responsible at their expense for the repair or removal of the works as soon as practicable. Prevent environmental harm AZ, The operator must ensure that environmental harm is not caused by these operational works except where specifically permitted by a condition of this development permit. A8. Notwithstanding any other condition of this development approval, this development approval does not authorise any release of contaminants which causes or is likely to cause environmental nuisance of harm beyond the boundaries of the licensed place. Display of development approval AQ. A copy of this development approval must be kept in a location readily accessible to personnel carrying out the works at all times and all site personnel must be made aware of the conditions of this approval. Records A10. All records required by this permit must be kept for a minimum of five years. Att. The operator must maintain a record of the works carried out (specifying the boundaries of the works area by GPS coordinates). Page 4 of 11° 091217 Department of Environment and Resource Management
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Concurrence and Advice Agency Response - Department of Environment & Resource ManagementRelated documentApplication case desk ↗
IC0511NAM0009_SC14225_110621_RAR.pdf - Adobe Acrobat Professional.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.