DERM Permit number: SPCC01881911

A12. All records required to be kept by a condition of this development approval must be provided
to an authorised person or the administering authority upon request.

Maintenance of measures, plant and equipment

A13. The operator must:
(a) install all measures, plant and equipment necessary to ensure compliance with the
conditions of this development permit;
(b) maintain and calibrate such measures, plant and equipment in an efficient condition
and keep records of the maintenance;
(c) operate such measures, plant and equipment in an efficient manner.

Calibration

At4. All instruments and devices used for the measurement or monitoring of any parameter under
any condition of this development approval must be calibrated and appropriately operated
and maintained.

Site Based Management Plan (SBMP)

A15. The operator must implement a site based management plan prior to commencement of these
works. The SBMP must identify all causes of environmental harm, including but not limited to the
actual and potential release of any contaminants, the nature of the environmental harm and the
actions that will be taken to prevent environmental harm being caused. The SBMP must be made
available to the administering authority when requested.

A16. _ . The SBMP must address the following matters:

(a) environmental commitments - a commitment by senior management to achieve specified

and relevant environmental goals;

(b) identification of environmental issues and potential impacts; .

(c) control measures for.routine operations to minimise likelihood of environmental harm;

(d) contingency plans and emergency procedures for non-routine situations (including but not
limited to the emergency protocol when spills occur and the amount of neutralising agent
to be kept onsite);

(e) organisational structure and responsibility;

(f) effective communication;

(g) monitoring of contaminant releases;

(h) conducting environmental impact assessments;

(i) staff training;

(j) record keeping; and

(k) periodic review of environmental performance and continual improvement.

A17. The SBMP must be made available to the administering authority when requested.

A18. The SBMP must not be implemented or amended in a way that contravenes any condition
of this development permit.

Notification of incidents

A19. As soon as practicable after becoming aware of any incident of environmental harm (including a
. reasonable suspicion that environmental harmhas or is likely to have occurred) which results in
the release of contaminants not in accordance, or reasonably expected to be not in accordance
with the conditions of this development approval, the holder of this development approval must
notify the administering authority of the release by telephone (Pollution Hotline 1300 130 372)
or local office (07) 54596 132.

 

Page 5 of 11 "091217 Department of Environment and Resource Management

 

 

Used in these records

About this file

File size
1.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Concurrence and Advice Agency Response - Department of Environment & Resource Management.pdf · 1.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.