Council archive · source document
Concurrence and Advice Agency Response - Department of Environment & Resource Management · OPW11/0116
Attached to the e-mail Referral Agency Response - Department of Environment & Resource Management.
DERM Permit number: SPCC01881911 A12. All records required to be kept by a condition of this development approval must be provided to an authorised person or the administering authority upon request. Maintenance of measures, plant and equipment A13. The operator must: (a) install all measures, plant and equipment necessary to ensure compliance with the conditions of this development permit; (b) maintain and calibrate such measures, plant and equipment in an efficient condition and keep records of the maintenance; (c) operate such measures, plant and equipment in an efficient manner. Calibration At4. All instruments and devices used for the measurement or monitoring of any parameter under any condition of this development approval must be calibrated and appropriately operated and maintained. Site Based Management Plan (SBMP) A15. The operator must implement a site based management plan prior to commencement of these works. The SBMP must identify all causes of environmental harm, including but not limited to the actual and potential release of any contaminants, the nature of the environmental harm and the actions that will be taken to prevent environmental harm being caused. The SBMP must be made available to the administering authority when requested. A16. _ . The SBMP must address the following matters: (a) environmental commitments - a commitment by senior management to achieve specified and relevant environmental goals; (b) identification of environmental issues and potential impacts; . (c) control measures for.routine operations to minimise likelihood of environmental harm; (d) contingency plans and emergency procedures for non-routine situations (including but not limited to the emergency protocol when spills occur and the amount of neutralising agent to be kept onsite); (e) organisational structure and responsibility; (f) effective communication; (g) monitoring of contaminant releases; (h) conducting environmental impact assessments; (i) staff training; (j) record keeping; and (k) periodic review of environmental performance and continual improvement. A17. The SBMP must be made available to the administering authority when requested. A18. The SBMP must not be implemented or amended in a way that contravenes any condition of this development permit. Notification of incidents A19. As soon as practicable after becoming aware of any incident of environmental harm (including a . reasonable suspicion that environmental harmhas or is likely to have occurred) which results in the release of contaminants not in accordance, or reasonably expected to be not in accordance with the conditions of this development approval, the holder of this development approval must notify the administering authority of the release by telephone (Pollution Hotline 1300 130 372) or local office (07) 54596 132. Page 5 of 11 "091217 Department of Environment and Resource Management
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Concurrence and Advice Agency Response - Department of Environment & Resource ManagementRelated documentApplication case desk ↗
IC0511NAM0009_SC14225_110621_RAR.pdf - Adobe Acrobat Professional.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.