EROSION AND SEDIMENTATION MANAGEMENT PLAN ENVIRONMENTAL DIARY CONSTRUCTION MANAGEMENT PLAN
Sediment Control Weekly Visual Inspection or After Rainfall Event
Project:- Operational Works Performance
Indicators
Item Performance Indicator CONSTRUCTION MANAGEMENT PLAN DIARY
Principal:-
Contractor:- BRIAN WILLIAMS
Objective Comply with all statutory regulations and maintain erosion and sedimentation 1. Vegetation No disturbance of soil below retained vegetation due to construction Weekly Visual Inspection or After Rainfall Event
Location:- 396 LAKE COOROIBAH ROAD, NOOSA
controls throughout the duration of construction. Comply with the intent of the activities.
Job Ref. 17-1687 Project:-
LINDSAY CONSULTING PTY LTD
sedimentation management plan shown on sheet 29 of the drawings prepared Operational Works
by Noel Covey & Associates, and other measures as deemed necessary to
No:-
Date:- Regular Monitoring (Weekly) 2. Hours of Work No work conducted outside specified hours without satisfactory evidence Principal:- LINDSAY CONSULTING PTY
LTD
control erosion and minimise sediment transport. of measures taken to suppress noise and other emissions / dust. Contractor:- BRIAN WILLIAMS
Approx Time:- am/pm Special Event Monitoring (briefly describe event) Location:- 396 LAKE COOROIBAH ROAD, NOOSA
Date Condition Corrective 3. Lighting No resident's complaints regarding construction security lighting. Job Ref. No:- 17-1687 Council File Ref. No. RPEQ 4928
Management Strategy Site Foreman to identify direction of stormwater land flows and flows resulting Item Control Acceptable Action Corrective Action Taken
from construction, and provide sediment fences, rock filter dams, turf strips, Monitored Measure Required (Describe) OFF. 2C/82 PARKER STREET, MAROOCHYDORE PH 54 792 118
Date:- Regular Monitoring (Weekly)
Installed No abutting public roads contain soil, gravel, clay or other such
THIS DRAWING REMAINS THE PROPERTY OF
ü
stormwater pit entry filters, and other measures as shown on the plan or as û 4. Existing Roads
materials originating from onsite construction activities. Approx Time:- am/pm Special Event Monitoring (briefly describe event)
deemed necessary to prevent uncontrolled stormwater flows over unprotected
areas, and avoid sediment transport to waterways and stormwater pits. Sediment LINDSAY CONSULTING PTY LTD AND IS FOR
No observed or reported incidents due to inadequacy or absence of Condition orrective Action
Fences THE SOLE USE OF THE CLIENT. NO PART
C
5. Signage Date Control Corrective Action Taken
Acceptable
signage or other control measures. Item Monitored
Measure Installed Required
(Describe)
Tasks and Actions Erect sediment barriers as shown on sheet 29 of the drawings, and at other
ü MAY BE USED IN PART OR WHOLE WITHOUT
Rock
û
Required locations as deemed necessary by visual inspection. Temporary rock filter dams Filter
6. Waste Control No complaints from local residents and site is kept tidy at all time PRIOR EXPRESS WRITTEN CONSENT OF
Dams Retained Vegetation
are to be placed at all concentrated stormwater flow outlet locations and
No occurrence of illegal dumping onsite and all materials where possible
LINDSAY CONSULTING PTY LTD
maintained with fresh filter screenings throughout the duration of construction. 7. Waste Minimisation
All earthworks areas to be topsoiled and seeded or hydromulched upon have been appropriately recycled. Air Emissions
completion of profiling. All footpath areas to be provided with a minimum 4m
Stormwater
Outlets CLIENT AND PROJECT DESCRIPTION
8. Dangerous Goods No spillage or seepage of dangerous goods stored onsite.
wide turf strip behind kerb and channel immediately after footpath area Noise
construction and topsoil profiling is completed. Strategically place filters around
all stormwater pits. Catchpit
BRIAN WILLIAMS
9. Erosion & Sedimentation No visible signs of sediment laden waters leaving the site.
Areas Security Lighting
Performance Indicators Site Foreman to -
check for erosion and sediment flows at base of all embankments Pavement
Areas
10. Traffic Management No works are carried out without implementation of the approved Traffic
Management Plan.
Vibrations
VILLAS DEVELOPMENT
396 LAKE COOROIBAH RD
·
and other 11. Existing Infrastructure Existing Utilities, Roads & Drainage Infrastructure
exposed areas after rain; No unplanned damage to existing utilities and infrastructure.
·
·
check that rock filter dams are working during rain periods;
check that all sediment fences and other erosion control
mechanisms are
Bottom
of
Embankment 12. Non Conformances All non conformances have been reported and rectified
Construction Traffic & Parking
NOOSA
working during rain periods; and Humeceptors/ The site foreman is to monitor the performance of all construction activities and any departure from the Waste Minimisation & Recycling
clean and maintain filter fabric covers to pits after rain periods. Gross Monitoring Construction Management Plan control measures is to be immediately rectified.
·
Pollutant
Traps
DRAWING TITLE
Erosion & Sedimentation Control (Environmental Diary)
Monitoring Site Foreman to monitor performance of all sediment controls on a
regular weekly basis and after every rainfall event. Any damaged Detention Responsible The site foreman is to be responsible for all inspections and maintenance of the Construction Management
sediment control item is to be rectified, and trapped silt removed and
deposited in an area not prone to erosion.
Basin Person Plan.
Other
CONST. MANAGEMENT PLAN
The site foreman is to complete the Construction Management Plan Diary (including Environmental Diary for Item Monitored
Other sediment control) on a weekly basis as a minimum, but also after every significant rainfall event (which
Responsible Person Site Foreman to be responsible for all inspections and maintenance of sediment causes site runoff) or other special event affecting the site or any watercourses traversing the site.
control measures. Any Special Comments:- Reporting The Construction Management Plan Diary (in conjunction with the Environmental Diary) shall be completed Any Special Comments:-
Signed:- and delivered to the Superintendent for record and audit purposes with each progress claim for the
Reporting Site Foreman is to complete the Environmental Diary for sediment control on a construction works.
weekly basis as a minimum, but also after every significant rainfall event or other SCALES
special event affecting the sediment control measures. The Environmental Diary
shall be completed and delivered to the Superintendent for record and audit The site foreman is to arrange all corrective actions, controls and rectification activities, and report on Signed:-
purposes with each progress claim for the construction works. Corrective
Actions all measures taken in the Construction Management Plan Diary.
Corrective Actions The Site Foreman to arrange for installation of additional sediment
controls and/or improve maintenance controls and replacement of
screenings to filter dams as required, and report on measures taken in
the Environmental Diary.
CONSTRUCTION MANAGEMENT PLAN SURVEY DATUM
Objective To comply with all statutory regulations and relevant policies, and minimise the impact on the Construction 11. Implement the erosion and sedimentation control measures and associated management plan contained
environment whilst carrying out construction activities in a safe and sustainable manner. Management
Tasks and Actions
in the approved plans.
12. All earthwork stockpiles are to be kept moist, covered with tarpaulins or otherwise treated to
.
Required
minimise dust emissions and stored in locations which minimise the possibility of the soil entering the
stormwater system.
Management To minimise the environmental and amenity impact of construction activities through onsite proactive
approach to construction processes and consequences (cause and effect). Successful integration of
13. A construction shakedown area is to be installed at the entrance to the site to reduce unwanted ASSOCIATED CONSULTANTS
Strategy soil from leaving the site via vehicle tyres.
activities will achieve ecological sustainability which is recognised as a balance that integrates the 14. All site staff and sub contractors shall be directed to use the nominated shakedown entry / exit
protection of ecological processes and natural systems, economic development, and maintenance of point.
cultural, economic, physical and social wellbeing of people in communities. 15. Roads abutting the site and affected by the works shall be swept at regular intervals as required,
or whenever inspection shows signs of soil / pavement construction material on an abutting road or at
the nominated site entrance.
Construction The following schedule of management strategies, tasks and actions for construction works forms the
Management 16. A high level of site “housekeeping” shall be maintained to ensure that vermin are
basis of sustainable management of site construction issues. Irrespective of whether or not an item is
Tasks and Actions not attracted to poorly disposed of materials. Any waste or materials that have
Required included in the following schedule however, the Contractor shall employ best practice measures to
been illegally dumped on site shall be removed.
achieve sustainable outcomes at all times.
17. The Contractor shall provide bins for staff and sub contractors at locations
Management Strategy / Action where food is consumed and shall ensure that such bins are used and emptied at
regular intervals.
1.Ensure that all staff and sub contractors working on the site are aware of potential environmental
18. All materials, be they construction materials or used containers, shall either be
impacts and required minimum environmental control measures and responsibilities before
recycled onsite or alternatively transported to a Council approved recycling station
commencement of any site works.
or disposal point.
2.Disturbance of soils below the canopy of any retained vegetation is to be excluded or otherwise 19. Any distillate or other petroleum products or dangerous goods stored onsite are
minimised in accordance with the approved plans. to be in bunded areas, located well clear of any watercourse. Appropriate spill
3. No dust emissions shall extend beyond the boundary of the site. control kits for any chemicals or stored fuels shall also be provided onsite.
20. Best practice management techniques shall be employed to control erosion and
4. No odour emissions are detectable beyond the boundary of the site. minimise sediment transport onsite, including those details contained in the
5.Work, including plant and equipment maintenance and servicing, shall only be carried out between the approved plans and the Erosion and Sedimentation Management Plan.
hours of 6:30am and 6:30pm Monday to Saturday inclusive. Written agreement must be provided by 21. The Contractor shall prepare and implement an approved Traffic Management
neighbouring residents if any work activity with the potential to emit excessive noise is to be Plan for site construction activities. The Traffic Management Plan shall be provided
undertaken outside the above mentioned hours, and even with such consent, such activities are to be to the Council inspector and the Supervising Engineer at the prestart meeting.
minimised. 22. Comply with any conditions of Council's operational works approval applicable to
the works.
6.All equipment shall be acoustically treated with manufacturer supplied muffler systems with ensure
23. All public complaints received by the Contractor must be recorded in writing, REVISION LIST
that equipment does not create environmental harm or excessive noise.
including any investigations undertaken, conclusions reached and actions taken as a A ORIGINAL ISSUE 21/12/17
7.Temporary security lighting for the site must be designed and located to ensure that its effects are result of same. This complaints record is to be made available to the C REVISED 30/09/19
not obtrusive and direct light spill does not alter the amenity of adjacent properties. administering authority on request. D REVISED 26/02/20
24. All site personnel are to report any significant non-conformances to the site
8.All existing utilities (roads, drainage, electrical and communication) on or adjacent the site are to be
manager as soon as practical and within 1 hour of the occurrence of, or
protected and maintained at all times, with the cost of any damage to such infrastructure to be
observance of same.
met by the Contractor.
25. The contractor shall prepare an informative letter to be dropped to
9. Any areas of high risk / danger on the site are to be adequately signposted. residents/businesses adjacent to the development. The letter is to advise contact
10. Vibration beyond the site boundary from construction activities is to be minimised and where there is details for communications for the site manager, working hours, projected timing of
a likelihood of such vibration extending beyond the boundaries to an adjoining property owner, the works and any other information the contractor sees relevant.
property owner shall be advised accordingly.
Computer File
171687-CP.DWG
DRAWING NUMBER SHEET REV.
17-1687-C6 6 D
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI 9.3.20 - Attachment B - Revised Engineering plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.