                                                                                                                              SEDIMENT AND EROSION
                                                                                                                                 CONTROL DETAILS
                                                  GRATE TO BE GEOFABRIC                                                                                                                                                                                                                                                 LINDSAY CONSULTING PTY LTD




                                                  WRAPPED.
                                                                                                                                                                                                                                                                                                                      LINDSAY CONSULTING PTY
                                                                                                                                                                                                                                                                                                                                         LTD



                                                                SPACER BLOCK                        EARTH BUND CONSTRUCTION NOTES                                                                                                                                                                                                                                         RPEQ 4928

                                                                                                    1. BUILD WITH GRADIENTS BETWEEN 1 PERCENT AND 5 PERCENT.                                              OVERLA                        TRAPPED SEDIMENT
                                                                                                                                                                                                                                                                                                                      OFF. 2C/82 PARKER STREET, MAROOCHYDORE            PH 54 792 118

                                                                                                    2. AVOID REMOVING TREES AND SHRUBS IF POSSIBLE - WORK AROUND THEM.                                            ND FLO                                                                                             THIS DRAWING REMAINS THE PROPERTY OF
 ROLL OF NETTING FILLED
 WITH 50 TO 70mm GRAVEL.
                                                                                                    3. ENSURE THE STRUCTURES ARE FREE OF PROJECTIONS OR OTHER IRREGULARITIES THAT COULD IMPEDE                             W                    TURF STRIPS                                                          LINDSAY CONSULTING PTY LTD AND IS FOR
                                                                                                       WATER FLOW.                                                                                                                                                                                                     THE SOLE USE OF THE CLIENT. NO PART
                                                                                                    3. BUILD THE DRAINS WITH CIRCULAR, PARABOLIC OR TRAPEZOIDAL CROSS SECTIONS, NOT V SHAPED.
                     KERB INLET PROTECTION                                                          4. ENSURE THE BANKS ARE PROPERLY COMPACTED TO PREVENT FAILURE.
                                                                                                    5. COMPLETE PERMANENT OR TEMPORARY STABILISATION WITHIN 10 DAYS OF CONSTRUCTION.
                                                                                                                                                                                                                                                                                                                     MAY BE USED IN PART OR WHOLE WITHOUT
                                                                                                                                                                                                                                                                                                                        PRIOR EXPRESS WRITTEN CONSENT OF
                                       NTS                                                                                                                                                                                                                                                                                 LINDSAY CONSULTING PTY LTD

                                                                                                                                                                                                                                                                                                                    CLIENT AND PROJECT DESCRIPTION
                                                                                                                             DIRECTION OF FLOW


                    OVERLA
                                                                                                                                                                                                            TYPICAL GRASS FILTER STRIP DETAIL                                                                                                        BRIAN WILLIAMS
                          ND FLO
                                W
                                        TRAPPED SEDIMENT
                                                TURF STRIPS                                                                                                       BATTER GRADE                                                         N.T.S.                                                                                                        VILLAS DEVELOPMENT
                                                                                                                                                                  1:2 max.
                                                                                                                                                                                                                                                                                                                                                     396 LAKE COOROIBAH RD
                                                                                               CHANNEL STABILISATION
                                                                                               AS REQUIRED
                                                                                                                                                                                 UNDISTURBED
                                                                                                                                                                                 AREA
                                                                                                                                                                                                                                                                                                                                                     NOOSA
                                                                                                                         NOTE:-
                                                                                                                         Min. GRADE 0.25%
                                                                                                                         Max. GRADE 0.75%
                                                                                                                         MUST HAVE A STABILISED OUTLET.                                                                                                                                                             DRAWING TITLE
            TURF FLARES TO                                                                                               MAYBE USED AS CONTOUR DRAINS
            RESTRICT SCOURING
            ALONG TURF EDGE                                                                                                                                                                                                                                                                                           EROSION CONTROL
              TURF STRIP
              BEHIND KERB                                                                                                               CAN BE CONSTRUCTED WITH
                                                                                                                      GRADIENT OF DRAIN OR WITHOUT CHANNEL
                                                   road surface
                                                                                                                      1% to 5%
                                                                                                                DIRECTION
                                                                                                                                                       ALL BATTER GRADES
                                                                                                                                                       2(H):1(V) MAX.                                                                                                SURFACE ROUGHENING                             SCALES
                                                                                                                OF FLOW

                                                                                                           150 mm min.                                     300 mm min.
                                                                                                                                                                                                                                                                            150 MM MIN.      SPILLWAY
                                                                                                                                                                                                                                                                                             150 MM MIN.
                      GRASSED     FILTER STRIPS
                            NOT TO REGULAR SCALE
                                                                                                                                    2 metres min.
                                                                                                                       NOTE: ONLY TO BE USED AS TEMPORARY BANK
                                                                                                                       WHERE MAXIMUM UPSLOPE LENGTH IS 80 METRES.

STORMWATER TREATMENT DETAILS                                                                                        EARTH BUND CUT OFF DRAIN                                                                AGGREGATE OR RECYCLED CONCRETE.                                     ROCK TRENCHED 200 MM INTO GROUND

SEDIMENT FLOCCULATION                                                                                                                                                                                                                                       FLO
The job of a flocculent is to effectively break down the dominance of the clay particles that contain a residual negative eleCIRCUITro-magnetic charge and thus allowing individual particles                                                                  W                                                    SURVEY DATUM
to be drawn together and settle under gravity.

METHOD OF APPLICATION                                                                                                                                                                                                                                               SPACING OF CHECK DAMS ALONG CENTRELINE
                                                                                                                                                                                                                                                                                                                      .
Large sediment basins such as the one this site, require that the gypsum is mixed into a slurry with water and then sprayed over the surface of the turbid water in the sediment                                                                                    AND SCOUR PROTECTION BELOW EACH CHECK
basin.   It is essential that the gypsum is spread evenly over the entire surface for efficient treatment of the turbid water.                                                                                                                                      DAM TO BE SPECIFIED ON SWMP/ESCP
Generally the gypsum should be applied at a rate of about 32 kgm per 100 cubic metres of detained turbid water, as per the adjacent table.
should be calibrated after the first two storm events to assess the actual flocculent application rate and settling time required for the site.
                                                                                                                                                 The above dosing rate for the site                                                              ROCK CHECK DAM                                                     ASSOCIATED CONSULTANTS
The final application rate should be sufficiently high to permit adequate sediment sediment flocculation (less than 50 NTU) and basin dewatering within two days (48 hours) from the
conclusion of each storm event, whilst maintaining other required water quality criteria such as pH (6.5 - 8.5) and dissolved oxygen (>80%).                                                     ROCK CHECK DAM CONSTRUCTION NOTES
                                                                                                                                                                                                 1. CHECK DAMS CAN BE BUILT WITH VARIOUS MATERIALS, INCLUDING ROCKS, LOGS, SANDBAGS AND STRAW BALES. THE
METHOD OF TESTING THE STORMWATER                                                                                                                                                                    MAINTENANCE PROGRAM SHOULD ENSURE THEIR INTEGRITY IS RETAINED, ESPECIALLY WHERE CONSTRUCTED WITH STRAW
                                                                                                                                                                                                    BALES. IN THE CASE OF BALES, THIS MIGHT REQUIRE THEIR REPLACEMENT EVERY TWO TO FOUR MONTHS.
The stormwater detained in the sediment basin will be tested at a suitable location that will be decided upon at the site. The sample should be taken at a location that has adequate
access so no sediment is resuspended while the testing is being conducted.                                                                                                                       2. TRENCH THE CHECK DAM 200 MM INTO THE GROUND ACROSS ITS WHOLE WIDTH. WHERE ROCK IS USED, FILL THE
The stormwater detained in the sediment basin will be tested with the TPS 90-FLT water quality logger. The TPS 90-FLT unit samples and records the dissolved oxygen, conductivity,                  TRENCHES TO AT LEAST 100 MM ABOVE THE GROUND SURFACE TO REDUCE THE RISK OF UNDERCUTTING.
pH, turbidity and temperature of the stormwater. For further details and specifications on the TPS 90-FLT please refer to Appendix B.                                                            3. NORMALLY, THEIR MAXIMUM HEIGHT SHOULD NOT EXCEED 600 MM ABOVE THE GULLY FLOOR. THE CENTRE SHOULD
If the TPS 90-FLT unit is not present a practical field test that approximates the required 50 NTU level is to fill a clear plastic or glass 65mm diameter soft drink bottle with the               ACTING AS A SPILLWAY, BEING AT LEAST 150 MM LOWER THAN THE OUTER EDGES.
water and then hold it up to the light. If seeing clearly through the sample is not possible, then the sample is probably above the 50 NTU level.
                                                                                                                                                                                                 4. SPACE THE DAMS SO THE TOE OF THE UPSTREAM DAM IS LEVEL WITH THE SPILLWAY OF THE NEXT DOWNSTREAM
                                                                                                                                                                                                    DAM.
METHOD OF DEWATERING
The sediment basin can be dewatered as soon as the water quality criteria met (refer table below). A pump is to be used to decant the basin with a floating inlet to prevent the
settled sediments from being removed from the basin. The pumping must cease prior to the settled sediments being drawn into the intake pipe, it is essential that materials from
the sediment layer are not discharged in the pumping process.                                                                                                                                                                                                                       STABILISE STOCKPILE
                                                                                                                                                                                                                                                                                    SURFACE
                                                                                                                                                                                                              EARTH BANK
                                                                                                                                                                                                                                            (MAX.)                  2:1
                                                                                                                                                                                                                                        E                                 SLO
                                                                                                                                                                                                  FLOW                             SLOP                                      PE
 STORMWATER DISCHARGE QUALITY CRITERIA                                                                                                                                                                                         2:1                                                (MA
                                                                                                                                                                                                                                                                                     X.)
   ACCEPTABLE       TSS            ACCEPTABLE      PH         DISSOLVED    O2
                                                                                                                                                                                                                                                                                                                    REVISION LIST
   50mg/L                             6.5 - 8.5                   > 80%                                                                                                                                                                                                             SEDIMENT FENCE                  A ORIGINAL ISSUE                                           21/12/17
                                                                                                                                                                                                                                       TOPSOIL STOCKPILE                                                            C REVISED
                                                                                                                                                                                                                                                                                                                    D REVISED
                                                                                                                                                                                                                                                                                                                                                                               30/09/19
                                                                                                                                                                                                                                                                                                                                                                               26/02/20
                                                                                                                                                                                                   TOPSOIL STOCKPILE CONSTRUCTION NOTES
 SEDIMENT BASIN FLOCCULENT APPLICATION                                                                                                                                                             1. PLACE STOCKPILES MORE THAN 2 (PREFERABLY 5) METRES FROM EXISTING VEGETATION, CONCENTRATED
                                                                                                                                                                                                      WATER FLOW, ROADS AND HAZARD AREAS.
 AGENT          INDICATIVE         DOSAGE         COMMENTS                               PRECAUTIONS        &   CONSTRAINTS           MIN.   REQD.    ON   SITE
                                                                                                                                                                                                   2. CONSTRUCTION ON THE CONTOUR AS LOW, FLAT, ELONGATED MOUNDS.
                                                                                                                                                                                                   3. WHERE THERE IS SUFFICIENT AREA, TOPSOIL STOCKPILES SHALL BE LESS THAN 2 METRES IN HEIGHT.
                                                                                                                                                                                                   4. WHERE THEY ARE TO BE IN PLACE FOR MORE THAN 10 DAYS, STABILISE FOLLOWING THE APPROVED
  GYPSUM        32kg/100cub.m                     LITTLE PH CHANGE, SLIGHT INCREASE IN   NEEDS TO BE SPREAD EVENLY ACROSS POND.      260 kgm                                                          ESCP OR SWMP TO REDUCE THE C-FACIRCUITOR TO LESS THAN 0.10.
                                                  SALINITY                               CAN CAUSE SCUM DEPOSITS IN EQUIPMENT.                                                                     5. CONSTRUCTION EARTH BANKS (STANDARD DRAWING 5-5) ON THE UPSLOPE SIDE TO DIVERT WATER AROUND
                                                                                                                                                                                                      STOCKPILES AND SEDIMENT FENCES (STANDARD DRAWING 6-8) 1 TO 2 METRES DOWNSLOPE.
 NOTE: NOTIFY ENGINEER TO CONFIRM DOSAGES & APPLICATION PRIOR TO USE.
                                                                                                                                                                                                                                                                                                                   Computer File
                                                                                                                                                                                                                                                                                                                                                        171687-CP.DWG

                                                                                                                                                                                                                                                                                                                   DRAWING NUMBER                                            SHEET   REV.

                                                                                                                                                                                                                                                                                                                                                         17-1687-C7           7 D

Used in these records

About this file

File size
5.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

RFI 9.3.20 - Attachment B - Revised Engineering plans.pdf · 5.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.