Council archive · source document
SUPERSEDED Decision Notice - 010.2006.00002689.001 [As Published] · 132006.2689
NOOSA COUNCIL IDAS Development Application Decision Notice 8 of 19
Earthworks
52. Earthworks required on site shall be carried out in accordance with Section 3.8 of Council’s Engineering
Design Standards Manual and so as not to cause the additional ponding of water on any adjoining lands
or the blockage of, or interference with, any natural watercourses.
53. Excavation of the site and the construction of the proposed works shall not have any adverse affects on
the stability of adjoining buildings and/or structures and/or services and/or lands. In this regard a
Registered Professional Engineer Queensland shall supervise the excavation of the site and the
construction of the new works to determine whether any additional measures are required to protect the
stability of adjoining buildings and/or structures and/or services and/or lands.
54. Earthworks carried out on site shall not affect the structural integrity of any of the existing fences that
border the development site. Fences that are affected shall be replaced prior to the Building Certifier
issuing the Certificate of Classification. In this regard any fences to be replaced shall be clearly shown on
the plans submitted for Operational Works approval.
55. The use of vibratory equipment of any kind is not permitted to be used (including vibrating rollers and the
use of vibrating installation techniques for sheet piling and other construction vibrations caused by
excavating, earthmoving or demolition machinery or other similar construction techniques) unless
approved and supervised by a Certified Geotechnical Engineer. Under such circumstances the operator
of such equipment shall at all times comply with the directions of the Geotechnical engineer and the
reasonable and lawful directions of Council officers.
The proposed use of such equipment shall be detailed in any application for a Development Permit for
Operational Works.
56. Certification of the completed works must be provided to Council by the supervising engineer. The
certification shall state that the completed works, including any on site infiltration, conform with all aspects
of the design and that the completed works will not have any adverse affects on the stability of adjoining
buildings and/or structures and/or services and/or lands.
Site Stability
57. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site, determine the
soil classification, establish whether any measures are required to protect the stability of adjoining
buildings and/or structures and/or land, and make recommendations on the type of foundation system(s)
best suited for the proposed development. The recommendations of this report shall be incorporated into
the design and construction of the proposed development.
58. Should the recommendations of the geotechnical report require any part of the works (including
excavation, retaining structures, tie backs etc) to be temporarily or permanently constructed within any
adjoining property a letter of authority from the adjoining property owner shall be submitted to Council
prior to the issue of operational works approval.
Construction Issues
59. A Construction Management Plan (including a Traffic Management Plan) addressing all construction
phases shall be prepared by a suitably qualified person and submitted to Council for approval prior to
obtaining a Development Permit for Operational Works. The report should aim to address every
foreseeable problem that is likely to occur during the construction process and include recommendation
on how these can be overcome or minimised and shall also address parking for construction workers.
To ensure construction is undertaken appropriately, the Construction Management Plan shall also include
a section written by a Geotechnical engineer addressing the excavation and surrounding site support
systems.
60. A Condition Survey is to be carried out on adjoining buildings, structures and services prior to any
excavation or construction works taking place on site. If distress already exists, a photographic survey
shall be undertaken, the distress measured and a plan to monitor changes to distress shall be
implemented. A copy of this report is to be submitted to Council within 5 business days of the survey and
prior to construction work proceeding.
This report will be held by Council until all work is completed and will be used for verification purpose and
to ensure that all buildings, structures and services are left in at least the same state as before
construction commenced.
Erosion and Sediment Control
61. Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
control measures such as silt fencing, controlled gravel access to the site and controlled disposal of
waste, will be necessary.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@40076eb3\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Decision Notice - 010.2006.00002689.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 283 KB (small file)
- File type
No other editions are linked here.