Council archive · source document
Decision Notice [As Published] · 172009.1654
Officer: Glen Conforti
Direct Telephone: (07) 5449 5379
Response Address: Locked Bag 72
Sunshine Coast Mail Centre QLD 4560
Email: [email protected]
Our Reference: 2009/1654
Your Reference:
14 January 2010
Platinum Property Group
PO Box 5736
TORQUAY QLD 4655
Dear Sir
Decision Notice
Integrated Planning Act 1997
I refer to your application and advise that on 13 January 2010 Council decided to approve the
application in full subject to conditions.
Details of the decision are as follows:
1 APPLICATION DETAILS
Application No: 2009/1654
Street address: 12 Piper Street, Peregian Beach
Real property description: Lot 403 P 93116
Planning Scheme: The Noosa Plan
2 DECISION DETAILS
The following type of approval has been issued:
Preliminary Approval for Building Works - Preliminary Building Works assessable against the
Planning Scheme
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.
4 ASSESSMENT MANAGER CONDITIONS
Approved Plans
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table and as
may be amended by these conditions and annotations on the plans.
Page 1 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 6 pages
Page 2
2009/1654
Plan No. Rev. Plan Name – Prepared by Date
Page 2 E -040110 E Site Plan – Image & Design 30 July 2009
Page 5 E -040110 E Proposed Lower Floor Plan– Image & 30 July 2009
Design
Page 6 E -040110 E Proposed Upper floor – Image & Design 30 July 2009
Page 7 E -040110 E Elevation 1& 2 – Image & Design 30 July 2009
Page 8 E -040110 E Elevations 3 & 4 – Image & Design 30 July 2009
Page 15 E - E Section A & B – Image & Design 30 July 2009
040110
Relevant Period
2. The Preliminary Approval for Building Work lapses if the use has not happened by 13
January 2012, unless an application to extend the currency is approved by Council.
Building Height
3. The building height shall not exceed 8.0 metres above the natural ground level, finished
ground level and 2 storey.
Security Bond
4. Security in the form of a cash bond or trading bank guarantee to the sum of $1,500 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for building works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
Landscaping
5. A minimum of 20% of the site shall be retained as soft landscaping.
6. Existing trees on the site and within road reserves shall be retained, except where required
to be removed due to building operations or the conduct of the approved use. In this regard,
the removal of vegetation shall not extend beyond 3 metres of the building footprint of the
Detached House.
7. All other vegetation shall be protected from interference resulting from clearing or
construction activities by:
7.1. Clearly marking vegetation to be retained with flagging tape;
7.2. Installing protective fencing around the drip line of the vegetation;
7.3. Stockpiling, storage and vehicle parking occurs in already cleared areas and does
not cause interference with vegetation; and
7.4. Low impact construction techniques are used around vegetation to minimise
interference with the vegetation.
8. Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site:
8.1. Processing through a woodchipper or shredder. The resulting mulch is to be
stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres high
with a minimum of 10 metres between edges of heaps.
Page 2 of 7
Page 3
2009/1654
8.2. Disposal for firewood.
8.3. Disposal for landscaping purposes.
9. The applicant is advised that burning off is an unacceptable method of disposal.
10. A 1.5 metre wide garden shall be provided to the full length of the rear boundary consisting
of native, endemic species and shall be planted in accordance with Council’s Planning
Scheme Policy PSP3 Landscaping Plants and Guidelines.
11. Gates shall not be installed along the rear property boundary.
Water Storage
12. All new hot water systems installed shall be either solar systems; electric heat pump
systems; or gas systems (LPG or natural).
General
13. The development shall be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood due to the creation of excessive noise, lighting
nuisance, or other emissions.
14. Buildings and structures (including swimming pools, sheds, tennis courts, or outbuildings)
shall not be constructed under overhead electricity transmission lines, or within any
easements.
Earthworks
15. Earthworks required on site shall be carried out in accordance with Council’s Planning
Scheme Policy PSP5 Engineering Design Standards, so as not to cause the additional
ponding of water on any adjoining lands or concentrate or direct overland flow on to an
adjoining property.
Sediment and Erosion Control
16. Sediment and erosion control measures shall be in place prior to the building works. If such
measures are not in place or are not satisfactory, ‘on the spot’ fines may be issued. Such
fines can be issued if sediments from the site are found to enter or have the potential to
enter Council’s stormwater system or natural waterways.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Not applicable
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
Page 3 of 7
Page 4
2009/1654
Plan No. Rev. Plan Name – Prepared by Date
Page 2 E -040110 E Site Plan – Image & Design 30 July 2009
Page 5 E -040110 E Proposed Lower Floor Plan– Image & 30 July 2009
Design
Page 6 E -040110 E Proposed Upper floor – Image & 30 July 2009
Design
Page 7 E -040110 E Elevation 1& 2 – Image & Design 30 July 2009
Page 8 E -040110 E Elevations 3 & 4 – Image & Design 30 July 2009
Page 15 E -040110 E Section A & B – Image & Design 30 July 2009
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
Local Law No. 12, prevents a builder or building contractor carrying out building work on a
building site in a way that makes or causes audible noise to be made from the building work:
1.1. On a Sunday or public holiday, at any time; or
1.2. On a Saturday or a business day, before 7.00am or after 6.30pm.
A maximum penalty of $1,500 applies to an offence under this legislation.
2. You are advised that the site is identified as a Koala Living Area under the Nature
Conservation (Koala) Conservation Plan 2006 and Management Program 2006-2016 and
may contain koalas. The use of a Koala Spotter is encouraged in areas where koalas are
likely to occur, prior to the removal of Angophora, Corymbia, Eucalyptus, Lophostemon and
Melaleuca species. Further information can be obtained from the Environmental Protection
Agency at http://www.epa.qld.gov.au or phone (07) 3227 8185.
3. Prior to the commencement of the development, a plumbing assessment must be obtained
from Noosa Council’s Plumbing Services Section in accordance with the Plumbing &
Drainage Act 2002 (as applicable).
4. For properties located in the catchment area for the Coastal Major Road Network
Infrastructure Charges Plan, a Building Works application may trigger an Infrastructure
Charge payable to Council in accordance with the Infrastructure Charges Plan and Chapter
5 of the Integrated Planning Act 1997.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
Page 4 of 7
Page 5
2009/1654
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
8 PROPERTY NOTES
Not applicable
9 PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable
10 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Development Permit for Building Works All Building Works
11 SELF ASSESSABLE CODES
The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Not applicable
12 SUBMISSIONS
Not applicable
13 REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable
14 RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).
15 OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Yours faithfully,
Glen Conforti
Planning Technical Officer
Page 5 of 7
Page 6
2009/1654
Appeal Rights
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
The following is an extract from the Integrated
(6) If an application involves assessment against a
Planning Act (Chapter 4). concurrence agency code, appeal rights for submitters
Division 8 - Appeals to court relating to for the application are not available against the part of
development applications the approval that represents the concurrence agency’s
response for the code.
Appeals by applicants
Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application
may appeal to the court against any of the following- 4.1.29.(1) An advice agency may, within the limits of
its jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development development approval for a development application
application; if-
(b) a matter stated in a development approval, (a) the development application involves impact
including any condition applying to the assessment; and
development, and the identification of a code
under section 3.1.6;1 (b) the advice agency told the applicant and the
assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a application as a submission for an appeal.
development permit was applied for;
(2) The appeal must be started within 20 business
(d) the length of a relevant period; days after the day the decision notice or negotiated
(e) a deemed refusal. decision notice is given to the advice agency as a
(2) An appeal under subsection (1)(a) to (d) must submitter.
be started within 20 business days (the “applicant’s Appeals for matters arising after approval given
appeal period”) after the day the decision notice or (co-respondents)
negotiated decision notice is given to the applicant. 4.1.30.(1) For a development approval given for a
(3) An appeal under subsection (1)(e) may be development application, a person to whom any of the
started at any time after the last day a decision on the following notices have been given may appeal to the
matter should have been made. court against the decision in the notice-
Appeals by submitters (a) a notice giving a decision on a request for
4.1.28.(1) A submitter for a development application extension of the relevant period for an approval;
may appeal to the court about- (b) a notice giving a decision on a request to make a
(a) the giving of a development approval, including minor change to an approval.
any conditions (or lack of conditions) or other (2) The appeal must be started within 20 business
provisions of the approval; or days after the day the notice of the decision is given to
(b) the length of a relevant period for the approval. the person.
(2) The appeal must be started within 20 business (3) Subsection (1)(a) does not apply if the
days (the “submitters appeal period”) after the day approval resulted from a development application
the decision notice or negotiated decision notice is (superseded planning scheme) that was assessed as
given to the submitter. if it were an application under a superseded planning
scheme.
(3) If a person withdraws a submission before the
application is decided, the person may not appeal the (4) Also, a person who has made a request
decision. mentioned in subsection (1) may appeal to the court
against a deemed refusal of the request.
(4) If an application involves both impact
assessment and code assessment, appeal rights for (5) An appeal under subsection (4) may be started
submitters are available only for the part of the at any time after the last day the decision on the
application involving impact assessment. matter should have been made.
(5) If an application is processed under section Division 9 - Appeals to court about other matters
6.1.28(2), appeal rights for submitters for the Appeals for matters arising after approval given
application are available only for the aspects of the (no co-respondents)
development that would have required public
notification under the repealed Act. 4.1.31.(1) A person to whom any of the following
notices have been given may appeal to the court
against the decision in the notice-
a. (a) a notice giving a decision on a request to change
or cancel a condition of a development approval.
1
Section 3.1.6 (Preliminary approval may override
local planning instrument)
Page 6 of 7
Page 7
2009/1654
(b) a notice under section 6.1.442 giving a decision to (d) the length of a period mentioned in section 3.5.21
change or cancel a condition of a development relevant period;
approval. (e) a deemed refusal.
(2) The appeal must be started within 20 (2) An appeal under subsection (1)(a) to (d) must
business days after the day the notice of the decision be started within 20 business days (the “applicant’s
is given to the person. appeal period”) after the day the decision notice or
(3) Also, a person who has made a request negotiated decision notice is given to the applicant.
mentioned in subsection (1)(a) may appeal to the (3) An appeal under subsection (1)(e) may be
court against a deemed refusal of the request. started at any time after the last day a decision on the
(4) An appeal under subsection (3) may be matter should have been made.
started at any time after the last day the decision on The Registrar for the Building and Development
the matter should have been made. Tribunal may be contacted at the website
Appeals against decisions to change approval http://www.localgovernment.qld.gov.au/
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
For Infrastructure Charges Only
decision made on an application to change the 4.1.36 Appeals about particular infrastructure
conditions attached to an approval given under charges
section 2.19(3)or section 4.4 of the repealed Act may (1) This section applies to a person who has been
appeal to the court against- given, and is dissatisfied with, an infrastructure
(a) the decision; or charges notice or a regulated State infrastructure
(b) a deemed refusal of the application. charges notice.
(2) An appeal under subsection (1)(a) must be (2) The person may appeal to the court against the
started within 20 business days after the day notice of notice.
the decision is to be given to the person. (3) The appeal must be started within 20 business
(3) An appeal under subsection (1)(b) may be days after-
started at any time after the last day a decision on the (a) if the notice is given because of a development
matter should have been made. approval or master plan approval-the day the
Appeals against local laws applicant is given notice of the decision about the
approval; or
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions (b) otherwise-the day the notice is given to the
applied under a local law about the use of premises or person.
the erection of a building or other structure permitted (4) An appeal under this section may only be about-
by the planning scheme may appeal to the court (a) whether a charge in the notice is so
against the decision or the conditions applied. unreasonable that no reasonable relevant local
(2) The appeal must be started within 20 business government, State infrastructure provider or
days after the day notice of the decision is given to the coordinating agency could have imposed it; or
applicant. (b) an error in the calculation of the charge.
For Building Works Only (5) To remove any doubt, it is declared that an
Rights of appeal conferred by Section 4.2.9 of the appeal under this section can not be about the
Integrated Planning Act 1997 as follows: methodology used to establish the charge in the
relevant infrastructure charges schedule or regulated
Division 3 – Appeals to tribunals relating to
State infrastructure charges schedule.
development applications
Appeals by applicants
4.2.9(1) An applicant for a development application
may appeal to the Building and Development Tribunal
against any of the following-
(a) the refusal, or the refusal in part, of a development
application;
(b) a matter stated in a development approval,
including any condition applying to the
development, and the identification of a code
under section 3.1.6;3
(c) the decision to give a preliminary approval when a
development permit was applied for;
a.
2
Section 6.1.44 (Conditions may be changed or
cancelled by assessment manager or concurrence
agency in certain circumstances)
3
Section 3.1.6 (Preliminary approval may override
local planning instrument)
Page 7 of 7