Council archive · source document
Decision Notice [As Published] · 172009.1654
2009/1654
Plan No. Rev. Plan Name – Prepared by Date
Page 2 E -040110 E Site Plan – Image & Design 30 July 2009
Page 5 E -040110 E Proposed Lower Floor Plan– Image & 30 July 2009
Design
Page 6 E -040110 E Proposed Upper floor – Image & Design 30 July 2009
Page 7 E -040110 E Elevation 1& 2 – Image & Design 30 July 2009
Page 8 E -040110 E Elevations 3 & 4 – Image & Design 30 July 2009
Page 15 E - E Section A & B – Image & Design 30 July 2009
040110
Relevant Period
2. The Preliminary Approval for Building Work lapses if the use has not happened by 13
January 2012, unless an application to extend the currency is approved by Council.
Building Height
3. The building height shall not exceed 8.0 metres above the natural ground level, finished
ground level and 2 storey.
Security Bond
4. Security in the form of a cash bond or trading bank guarantee to the sum of $1,500 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for building works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
Landscaping
5. A minimum of 20% of the site shall be retained as soft landscaping.
6. Existing trees on the site and within road reserves shall be retained, except where required
to be removed due to building operations or the conduct of the approved use. In this regard,
the removal of vegetation shall not extend beyond 3 metres of the building footprint of the
Detached House.
7. All other vegetation shall be protected from interference resulting from clearing or
construction activities by:
7.1. Clearly marking vegetation to be retained with flagging tape;
7.2. Installing protective fencing around the drip line of the vegetation;
7.3. Stockpiling, storage and vehicle parking occurs in already cleared areas and does
not cause interference with vegetation; and
7.4. Low impact construction techniques are used around vegetation to minimise
interference with the vegetation.
8. Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site:
8.1. Processing through a woodchipper or shredder. The resulting mulch is to be
stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres high
with a minimum of 10 metres between edges of heaps.
Page 2 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 58 KB (small file)
- File type
No other editions are linked here.