ORDINARY MEETING AGENDA 21 FEBRUARY 2019
34. Earthworks works required on site must be carried out so as not to cause the
additional ponding of water on any adjoining lands or the blockage of, or
interference with, any natural watercourses.
35. Earthworks carried out on site must not affect the structural integrity of any of the
existing fences and/or structures and/or lands that border the development site.
Fences that are affected must be replaced prior to the Building Certifier issuing the
Certificate of Classification. In this regard any fences to be replaced must be clearly
shown on the plans submitted for Operational Works approval.
36. All earthworks and any associated batters must be contained entirely within the
subject site unless written permission from the respective landowner(s) is provided
to Council.
37. Where the development involves changes to the existing levels over, or adjacent
to, drainage, water supply or sewerage infrastructure, all access chamber surface
levels must be adjusted to provide a freeboard of 100mm above the finished
ground surface level or as required by the service provider and/or the approved
plans for Operational Works.
38. All retaining walls and stormwater headwalls must be designed and constructed in
accordance with the planning scheme and must be certified by an RPEQ where
exceeding 1.0m in height. All retaining walls that are publicly accessible and
exceed 1.0m in height must be fitted with a commercial grade safety fence.
Erosion and Sediment Control
39. Any person acting on this permit must prevent erosion and sediment export from
leaving the site. Site control measures such as silt fencing, controlled gravel access
to the site and controlled disposal of waste, will be necessary.
In this regard plans prepared by suitably qualified person detailing the methods
and measures of controlling erosion and sediment are required to be submitted to
the Council in conjunction with an application for the Development Permit for
Operational Works.
Water & Sewer Connections
40. An underground connection to reticulated water and sewerage must be provided
to the development site in accordance with the standards and requirements of
Northern SEQ Distributor–Retailer Authority (Unitywater).
41. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection
to reticulated water and sewerage has been provided to the development site.
Electricity and Telecommunication Services
42. Underground reticulated electricity and telecommunication services must be
provided to the development site in accordance with an approval for Operational
Works and be in compliance with the standards and requirements of the relevant
service provider.
43. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits
and pipes to accommodate the future connection of optic fibre technology
telecommunications.
44. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice
and all applicable legislation at the time of construction.
Page 19 of 24