ORDINARY MEETING AGENDA 21 FEBRUARY 2019
26. Footpath improvements such as topsoiling, grassing, tree retention and tree
planting are required to the Kauri Street and Olivine Street frontages of the site in
accordance with Planning Scheme Policy PSP03 Landscaping Plants & Guidelines
and in compliance with Operational Works approval.
27. The new path and frontage works must generally match the existing adjoining
surfaces without causing a trip hazard and extend beyond the frontage where
necessary to join and taper smoothly with any existing adjoining path and surfaces.
Stormwater Drainage
28. The site must be provided with a stormwater drainage system connecting to a
lawful point of discharge. The works must be undertaken in accordance with an
Operational Works approval and the Queensland Urban Drainage Manual (QUDM)
and the design be prepared and certified by a Registered Professional Civil
Engineer, and must include/address in particular the following:
28.1. Collection and discharge of stormwater to Council’s existing drainage system
in Kauri Street generally in accordance with Drawing No 2018068-P01 dated
12/09/2018 by 360 Civil Consulting and including the provision of any
required inter-allotment drainage within the site.
28.2. Must be no net increase in the rate of stormwater runoff from the current
undeveloped condition of the site.
28.3. Where applicable, extension of the site stormwater system to accommodate
stormwater from external adjoining properties, including registration of
drainage easements.
28.4. The use of gravity stormwater drainage and not surcharge pits.
29. A CCTV inspection must be carried out by a Council approved CCTV contractor
upon satisfactory completion of construction works. The developer will be
responsible for the full cost of CCTV inspection, including any additional inspection
necessary following defect identification and rectification.
Easements
30. Unless otherwise agreed in writing by the relevant service provider, any public or
third party infrastructure located on the subject site must be placed within an
easement registered against the title of the property.
31. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
32. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks
33. All earthworks must be undertaken in accordance with a development permit for
Operational Works and in compliance with the provisions of AS 3798: Guidelines
on Earthworks for Commercial and Residential Development, with geotechnical
testing undertaken in accordance with Section 8 of the Standard, and to a minimum
of ‘Level 2’ supervision Test results as required by AS 3798 and/or the directions
of the supervising engineer. A certification of the earthworks must be provided by
a RPEQ and submitted to Council prior to the final inspection of the completed
works by Council.
Page 18 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.