Skip to the record
Search everything, all in one place.

Original source · versioned page text

2015-02-03 P&O Agenda - Item 1 - Attachment 1 - NSC Charges Resolution

of 31

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                                                   11
                                          Noosa Shire Council
                                     Charges Resolution (No. 2) 2014



Part 3                       Levied charge

  8.         Levied infrastructure charge
8.1    Purpose

       Section 8 states the calculation of the infrastructure charge to be levied by the following:

                 (a)      the Council under Chapter 8 Subdivision 3 of the Sustainable Planning
                          Act 2009 for the transport, public parks & land for community purposes
                          and stormwater networks in accordance with the breakup agreement;

                 (b)      the distributor-retailer under the South-East Queensland Water
                          (Distribution and Retail Restructuring) Act 2009 for the sewerage and
                          water supply networks in accordance with the breakup agreement.

8.2    Calculation of levied charge

       Infrastructure charges are calculated and levied separately by the Council and distributer-
       retailer in accordance with the charges breakup agreement and relevant legislation.

       (1)       An infrastructure charge that may be levied for reconfiguring a lot is calculated
                 as follows:

                 LCROL = (ACROL x QROL) - C

                 Where:

                 LCROL    is the infrastructure charge levied for reconfiguring a lot.

                 ACROL    is the adopted charge rate for reconfiguring a lot stated in section 8.3
                          (Adopted charge rate).

                 QROL     is the total no of lots.

                 C        is the credit stated in section 8.4 (Credit).

                 Note:

                          (a) for residential lot reconfiguration, the adopted infrastructure charge
                              is apportioned across all networks;

                          (b) for non-residential lot reconfiguration, the adopted infrastructure
                              charge apportionment excludes the stormwater charge component.
                              The stormwater charge will be calculated and issued on a
                              subsequent material change of use or building work approval when
                              the impervious area is able to be determined.

       (2)       An infrastructure charge that may be levied for a material change of use or
                 building work for residential development is calculated as follows:

                 LCR = (Sum(ACR x QR) for each defined use) − C

                 Where:



                              Council Resolution effective 16 February 2015
Log in to download the original file

2015-02-03 P&O Agenda - Item 1 - Attachment 1 - NSC Charges Resolution(PDF, 1MB).pdf · 1.4 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.