Noosa Shire Council
Charges Resolution (No. 2) 2014
LCR is the infrastructure charge that may be levied for a material change of
use or building work for residential development.
ACR is the adopted charge rate for each defined use for a material change of
use or building work for residential development stated in section 8.3
(Adopted charge rate).
QR is the residential quantity for each defined use.
C is the credit stated in section 8.4 (Credit).
(3) An infrastructure charge that may be levied for a material change of use or
building work for non-residential development is calculated as follows:
LC = LCNR + LCSW
Where:
LC is the infrastructure charge that may be levied for the total development
LCNR = (Sum of (AC4 x Q4) for each defined use) − C4
LCSW = (ACSW x QSW) − CSW
LCNR is the infrastructure charge that may be levied for a material change of
use or building work for non-residential development for the transport,
public parks and land for community facilities, water supply and
sewerage networks.
LCSW is the levied charge for a material change of use or building work for
non-residential development for the stormwater network.
AC4 is the adopted charge rate for each defined use for a material change of
use or building work for non-residential development stated in section
8.3 (Adopted charge rate) for the transport, public parks and land for
community facilities, water supply and sewerage networks.
ACSW is the adopted charge rate for a material change of use or building work
for non-residential development stated in section 8.3 (Adopted charge
rate) for the stormwater network.
Q4 is the non-residential quantity for each defined use.
QSW is the impervious area of the development.
C4 is the credit stated in section 8.4 (Credit) for the transport, public parks
and land for community facilities, water supply and sewerage networks.
CSW is the credit stated in section 8.4 (Credit) for the stormwater network.
(4) An infrastructure charge is only levied if the calculation in sub-sections (1), (2)
and (3) results in an amount greater than $zero (i.e. no refund applies should the
calculated charge result in a negative amount).
8.3 Adopted charge rate
The adopted charge rate for:
Council Resolution effective 16 February 2015