2015-02-03 P&O Agenda - Item 1 - Attachment 1 - NSC Charges Resolution

of 31

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                                               12
                                      Noosa Shire Council
                                 Charges Resolution (No. 2) 2014



              LCR      is the infrastructure charge that may be levied for a material change of
                       use or building work for residential development.

              ACR      is the adopted charge rate for each defined use for a material change of
                       use or building work for residential development stated in section 8.3
                       (Adopted charge rate).

              QR       is the residential quantity for each defined use.

              C        is the credit stated in section 8.4 (Credit).

      (3)     An infrastructure charge that may be levied for a material change of use or
              building work for non-residential development is calculated as follows:

              LC = LCNR + LCSW

              Where:

              LC       is the infrastructure charge that may be levied for the total development

              LCNR = (Sum of (AC4 x Q4) for each defined use) − C4

              LCSW = (ACSW x QSW) − CSW

              LCNR     is the infrastructure charge that may be levied for a material change of
                       use or building work for non-residential development for the transport,
                       public parks and land for community facilities, water supply and
                       sewerage networks.

              LCSW     is the levied charge for a material change of use or building work for
                       non-residential development for the stormwater network.

              AC4      is the adopted charge rate for each defined use for a material change of
                       use or building work for non-residential development stated in section
                       8.3 (Adopted charge rate) for the transport, public parks and land for
                       community facilities, water supply and sewerage networks.

              ACSW     is the adopted charge rate for a material change of use or building work
                       for non-residential development stated in section 8.3 (Adopted charge
                       rate) for the stormwater network.

              Q4       is the non-residential quantity for each defined use.

              QSW      is the impervious area of the development.

              C4       is the credit stated in section 8.4 (Credit) for the transport, public parks
                       and land for community facilities, water supply and sewerage networks.

              CSW      is the credit stated in section 8.4 (Credit) for the stormwater network.

      (4)     An infrastructure charge is only levied if the calculation in sub-sections (1), (2)
              and (3) results in an amount greater than $zero (i.e. no refund applies should the
              calculated charge result in a negative amount).

8.3   Adopted charge rate

      The adopted charge rate for:


                           Council Resolution effective 16 February 2015
Log in to download the original file

2015-02-03 P&O Agenda - Item 1 - Attachment 1 - NSC Charges Resolution(PDF, 1MB).pdf · 1.4 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.